Letter of compliance/Occupancy | | | 7/22/2016 | | DONE |
|
|
|
|
BLD-Final | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Phil Shearer
|
|
|
Luke-please call Luke 20 prior to meet-he would like to do the walk thru with you Phone #: ###-####
|
DOC - Permit Finaled | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | FAIL |
Tony Young
|
|
|
Luke Phone #: ###-####,, lots of corrections to make
|
OVERRIDE | | | 7/6/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 7/6/2016 | 7/6/2016 | 7/6/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/6/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/6/2016 | | 7/6/2016 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/6/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/6/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/5/2016 | 7/5/2016 | 7/5/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/5/2016 | 7/5/2016 | 7/5/2016 | A | FAIL |
Brian McGowan
|
|
|
Home was remodeled without permits. New winfows, siding, bathrooms, misc. other improvements. A shed was also built without permits. Shed is 16x24 (384 sq ft) with electrical and an in wall heating/cooling unit. A sewer pipe has been run from the home to the shed as well.
More details on how the shed was built and what was remodeled is required.
|
1st review completed | | | 7/5/2016 | | FAIL |
Brian McGowan
|
|
|
Need further details on both the shed and what was done in the home.
|
Application received | | 7/5/2016 | | | |
|
|
|
|