BLD-Aging Inspection | 6/9/2017 | 6/9/2017 | 6/9/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 6/8/2017 | 6/8/2017 | 6/9/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Other | 4/17/2017 | 4/18/2017 | 4/18/2017 | A | PART |
Jim Storey
|
|
|
fire-rated soffits// Trey Tuttle Phone #: ###-#### heatter and led lights ok/ can lights protection hat not allowed
|
BLD-Energy code compliance | 1/25/2017 | 1/25/2017 | 1/25/2017 | P | PASS |
Tony Young
|
|
|
Tray Phone #: ###-####
|
BLD-Framing/Rough-in | 1/20/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Tony Young
|
|
|
Tray Phone #: ###-####
|
Routing - MECHANICAL | 1/3/2017 | | 1/3/2017 | | PASS |
Troy James
|
|
|
manual j report
|
BLD-Wall Bracing | 11/1/2016 | 11/2/2016 | 11/2/2016 | P | PASS |
Tony Young
|
|
|
Tray Phone #: ###-####,, exterior ok
|
BLD-Framing/Rough-in | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PART |
Tony Young
|
|
|
Tray Phone #: ###-####, wall bracing.. work in progress
|
BLD-Framing/Rough-in | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PART |
Tony Young
|
|
|
Tray Phone #: ###-####,, media room flooring ok
|
BLD-Foundation | 9/8/2016 | 9/9/2016 | 9/9/2016 | A | PASS |
Tony Young
|
|
|
Tray Phone #: ###-####,, late am
|
BLD-Footing | 9/7/2016 | 9/8/2016 | 9/8/2016 | A | PASS |
Tony Young
|
|
|
Tray Phone #: ###-####,, garage footings ok
|
PubWorks Subgrade Approval | 9/8/2016 | 9/8/2016 | 9/8/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Conference | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, WUI ?s
|
BLD-Conference | 8/15/2016 | 8/16/2016 | 8/16/2016 | A | CANC |
Tony Young
|
|
|
Noah Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/25/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 7/7/2016 | 7/7/2016 | 7/25/2016 | | DONE |
David Ferguson
|
|
|
due 7/13 - Plan review complete - Need WUI details and energy code compliance for slab insulation. 7/25/16-as per Dave F plan review complete
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2016 | | DONE |
David Ferguson
|
|
|
as per Dave F-permit has been plan reviewed and taken to front desk
|
Permit Ready to Issue | | | 7/25/2016 | | DONE |
|
|
|
called Derek to let know permit is ready and how much is owed-also need RP
|
Routing - PLAN CHECK | 7/21/2016 | | 7/23/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 7/23/2016 | | DONE |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 7/21/2016 | | DONE |
|
|
|
Three copies of sheets A0.0, A1, A2, A3, A4, A5, A6, E1, E2 and S1. Taken to Dave F
|
Routing - PLAN CHECK | 7/12/2016 | | 7/13/2016 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 7/13/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - Erosion and Sediment | 7/12/2016 | | 7/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid PD designated, RP Noah Richter becoming certified 7/13/2016. Site prep required, call ###-####
|
Routing - PLANNING | 7/8/2016 | | 7/11/2016 | | PASS |
Jeff Lowe
|
|
|
|
Telephone call | | | 7/8/2016 | | DONE |
|
|
|
called Noah who referred me to Derek-need plans that only include the scope of work to be done-the grading and drainage plans have been plan reviewed by Jason Taylor and have passed but the rest of the plans need to be looked at and anything that doens't pertain to the addition needs to be removed-left message on Derek's phone
|
Telephone call | | | 7/8/2016 | | DONE |
|
|
|
talked to Derek-he's going to come in and put clouds around landscaping (grading & drainage) that's going to be affected by the change instead of having the plans from the original NSFD
|
Routing PW Grading-Hillside | 7/7/2016 | | 7/8/2016 | | PASS |
Jason C. Taylor
|
|
|
**NO RETAINING WALLS, SITE WORK, OR DRIVEWAY REHAB APPROVED***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 7/7/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/7/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/7/2016 | | DONE |
|
|
|
no fees paid for intake
|
Application received | | 7/7/2016 | | | |
|
|
|
|