BLD-Final | 9/13/2017 | 9/13/2017 | 9/13/2017 | P | NR |
Tony Young
|
|
|
John-please call to meet-has questions Phone #: ###-####,, needs hillside passed 1st
|
BLD-Aging Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 5/10/2017 | 5/11/2017 | 5/11/2017 | A | PASS |
Jim Storey
|
|
|
John-soffit Phone #: ###-####
|
BLD-Conference | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### ?e blocking around fireplace ok
|
BLD-Energy code compliance | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PART |
Dave Hannah
|
|
|
Insulation // John Phone #: ###-#### ok to cover but still needs to fire block fireplace contractor will do iwith sheetrock and call for inspection
|
BLD-Energy code compliance | 2/15/2017 | 2/16/2017 | 2/17/2017 | P | PART |
Tony Young
|
|
|
Insulation // Jon Phone #: ###-####,, base layer ok
|
CHANGE STATUS TO (ISS) | | | 2/15/2017 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 2/7/2017 | | |
|
|
|
|
Plan assigned to (BJM) | 2/6/2017 | 2/6/2017 | 2/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 2/7/2017 | | 2/7/2017 | | PASS |
Brian McGowan
|
|
|
Provided spray foam insulation reports, spec sheets.
|
Case Summary (BLD) | | | 2/7/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 2/7/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE
|
Plan resubmittals received | | | 2/6/2017 | | DONE |
|
|
|
received (2) sets of plan resubmittals
|
BLD-Framing/Rough-in | 2/3/2017 | 2/3/2017 | 2/3/2017 | P | PASS |
Tony Young
|
|
|
john Phone #: ###-####,, still need to see base layer of foam,, also need fire stopping at top of chase of fireplace area
|
BLD-Framing/Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 | A | FAIL |
Dave Hannah
|
|
|
john Phone #: ###-#### c/n on site
|
Plan Modification Accepted | | | 1/27/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/27/2017 | | 1/27/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 1/13/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Tony Young
|
|
|
john Phone #: ###-####
|
BLD-Wall Bracing | 1/11/2017 | 1/12/2017 | 1/12/2017 | A | FAIL |
Tony Young
|
|
|
John Phone #: ###-####,, correction notice posted
|
BLD-Foundation | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | PART |
Tony Young
|
|
|
Wall // Pat Phone #: ###-####,, foundation grade appears low for the grade of lot, street.. ,, builder wants to pour as is,, ok at builders discretion
|
BLD-Footing | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Phil Shearer
|
|
|
Pat Phone #: ###-####
|
PubWorks Subgrade Approval | 8/24/2016 | 8/24/2016 | 8/24/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
|
BLD-Footing | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | NR |
Tony Young
|
|
|
Pat Phone #: ###-####,, need soils report approval
|
Issue PAID IN FULL permit | | | 8/11/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/10/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 7/13/2016 | 7/13/2016 | 8/10/2016 | | DONE |
Brian McGowan
|
|
|
Due 7-28 - Failed - no WUI details, need Deck materials and section.
|
Routing - PLAN CHECK | 8/5/2016 | | 8/10/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/10/2016 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2016 | | DONE |
|
|
|
called Jon- told him the permit is ready and fees due
|
Case Summary (BLD) | | | 8/10/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/10/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 8/5/2016 | | DONE |
|
|
|
received (2) sets of floor plan and wall sections
|
1st review completed | | | 7/28/2016 | | FAIL |
Brian McGowan
|
|
|
Need details on what the deck is being built of and a section, need WUI specifications/details on the plans
|
Routing - MECHANICAL | 7/19/2016 | | 7/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 7/18/2016 | | 7/19/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached.
|
Routing - Erosion and Sediment | 7/18/2016 | | 7/18/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid Plan Designer and Responsible Person designated. ESC site preparation inspection and BMP installlation required prior to excavation, call ###-####
|
Routing - MECHANICAL | 7/14/2016 | | 7/18/2016 | | FAIL |
Troy James
|
|
|
emailed idaho hvac and applicant
|
Routing - PLANNING | 7/13/2016 | | 7/14/2016 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 7/11/2016 | | 7/13/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 7/13/2016 | | DONE |
|
|
|
received (2) sets of revised MTI Report - routed to building plan review
|
Plan assigned to (LEG) Tisha | 7/11/2016 | | 7/13/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 7/11/2016 | | 7/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 7/13/2016 | | 7/11/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/11/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/11/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/11/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/8/2016 | | DONE |
|
|
|
received one copy sheet C2.0- put on Carlos's desk with the other plans
|
Application received | | 7/7/2016 | | | |
|
|
|
|
Routing - PLAN CHECK | 2/6/2017 | | | | |
Brian McGowan
|
|
|
|