Permit Information
Permit NumberBLD16-02488
StatusIssued
Name MILLER CONSTRUCTION CORP
Site Address 521 E CAVE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
*** 2-7-17 Plan Modification to use JM Corbond Spray Foam Insulation. See ESR Reports and Specification Sheets - BJM*** WUI Foothills - Zone "A" requirements. Permit for the construction of a new 4,085 sq. ft., one story single family dwelling, with a basement level (main story 2,221 sq. ft., basement level 1,864 sq. ft.) with 6 bedrooms, 4 bathrooms, approximately 249 sq. ft. of covered patio/porch and a 1001 sq. ft. attached garage per the approved plans, plan review report and any notations. Basement is proposed as unfinished. A-1 zoning and setbacks per planning.
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20179/13/20179/13/2017PNR
DetailsTony Young
John-please call to meet-has questions Phone #: ###-####,, needs hillside passed 1st
BLD-Aging Inspection7/7/20177/7/20177/7/2017 PASS
DetailsTony Young
BLD-Other5/10/20175/11/20175/11/2017APASS
DetailsJim Storey
John-soffit Phone #: ###-####
BLD-Conference3/9/20173/10/20173/10/2017APASS
DetailsDave Hannah
John Phone #: ###-#### ?e blocking around fireplace ok
BLD-Energy code compliance2/21/20172/22/20172/22/2017APART
DetailsDave Hannah
Insulation // John Phone #: ###-#### ok to cover but still needs to fire block fireplace contractor will do iwith sheetrock and call for inspection
BLD-Energy code compliance2/15/20172/16/20172/17/2017PPART
DetailsTony Young
Insulation // Jon Phone #: ###-####,, base layer ok
CHANGE STATUS TO (ISS)  2/15/2017 DONE
Plan Mod
OVERRIDE  2/7/2017  
Plan assigned to (BJM)2/6/20172/6/20172/7/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK2/7/2017 2/7/2017 PASS
DetailsBrian McGowan
Provided spray foam insulation reports, spec sheets.
Case Summary (BLD)  2/7/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  2/7/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  2/7/2017 DONE
plan mod ONLY - DO NOT RE-ISSUE
Plan resubmittals received  2/6/2017 DONE
received (2) sets of plan resubmittals
BLD-Framing/Rough-in2/3/20172/3/20172/3/2017PPASS
DetailsTony Young
john Phone #: ###-####,, still need to see base layer of foam,, also need fire stopping at top of chase of fireplace area
BLD-Framing/Rough-in1/27/20171/30/20171/30/2017AFAIL
DetailsDave Hannah
john Phone #: ###-#### c/n on site
Plan Modification Accepted  1/27/2017 DONE
new manual j report
Routing - MECHANICAL1/27/2017 1/27/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing1/13/20171/17/20171/17/2017APASS
DetailsTony Young
john Phone #: ###-####
BLD-Wall Bracing1/11/20171/12/20171/12/2017AFAIL
DetailsTony Young
John Phone #: ###-####,, correction notice posted
BLD-Foundation9/6/20169/6/20169/6/2016PPART
DetailsTony Young
Wall // Pat Phone #: ###-####,, foundation grade appears low for the grade of lot, street.. ,, builder wants to pour as is,, ok at builders discretion
BLD-Footing8/26/20168/26/20168/26/2016PPASS
DetailsPhil Shearer
Pat Phone #: ###-####
PubWorks Subgrade Approval8/24/20168/24/20168/24/2016 DONE
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####

BLD-Footing8/22/20168/23/20168/23/2016ANR
DetailsTony Young
Pat Phone #: ###-####,, need soils report approval
Issue PAID IN FULL permit  8/11/2016 DONE
OVERRIDE  8/10/2016  
Plan assigned to (BJM)7/13/20167/13/20168/10/2016 DONE
DetailsBrian McGowan
Due 7-28 - Failed - no WUI details, need Deck materials and section.
Routing - PLAN CHECK8/5/2016 8/10/2016 PASS
DetailsBrian McGowan
Inspection Record Card- Bld  8/10/2016 DONE
Telephone call  8/10/2016 DONE
called Jon- told him the permit is ready and fees due
Case Summary (BLD)  8/10/2016 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  8/10/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  8/10/2016 DONE
All Met
Plan resubmittals received  8/5/2016 DONE
received (2) sets of floor plan and wall sections
1st review completed  7/28/2016 FAIL
DetailsBrian McGowan
Need details on what the deck is being built of and a section, need WUI specifications/details on the plans
Routing - MECHANICAL7/19/2016 7/19/2016 PASS
DetailsTroy James
Routing - FIRE7/18/2016 7/19/2016 PASS
DetailsScott Arellano
No comments attached.
Routing - Erosion and Sediment7/18/2016 7/18/2016 PASS
DetailsAndy J. Long
ESC plan submitted and approved. Valid Plan Designer and Responsible Person designated. ESC site preparation inspection and BMP installlation required prior to excavation, call ###-####
Routing - MECHANICAL7/14/2016 7/18/2016 FAIL
DetailsTroy James
emailed idaho hvac and applicant
Routing - PLANNING7/13/2016 7/14/2016 PASS
DetailsColleen T Carroll
Routing PW Grading-Hillside7/11/2016 7/13/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  7/13/2016 DONE
received (2) sets of revised MTI Report - routed to building plan review
Plan assigned to (LEG) Tisha7/11/2016 7/13/2016 DEFR
DetailsTisha Gallop
Routing - Addressing7/11/2016 7/11/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS7/13/2016 7/11/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  7/11/2016 DONE
Intake Approval  7/11/2016 PASS
Recd Pcfee & Taken To Pln CK  7/11/2016 DONE
Plan resubmittals received  7/8/2016 DONE
received one copy sheet C2.0- put on Carlos's desk with the other plans
Application received 7/7/2016   
Routing - PLAN CHECK2/6/2017    
DetailsBrian McGowan