BLD-Final | 2/1/2018 | 2/2/2018 | 2/2/2018 | A | PASS |
Jim Sly
|
|
|
Please call me so I can let you in the house. Thanks Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
DOC - Permit Finaled | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/30/2018 | 1/31/2018 | 1/31/2018 | A | NR |
Jim Sly
|
|
|
Please call so I can let you in. Thanks Dylan ###-#### Phone #: ###-#### Inspection requested via web by Dylan Schneider Need handrail and egress ladder.
|
BLD-Energy code compliance | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Tony Young
|
|
|
Please call Dylan at ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Dylan Schneider
|
BLD-Framing/Rough-in | 11/8/2017 | 11/9/2017 | 11/9/2017 | P | PART |
Brandon Shaw
|
|
|
1) Per engineering, tripple 1 3/4 X beam connector schedule not sat. Provide revised engineering 2) Squash blocks needed at interior bearing wall
OK to insulate
|
Routing - MECHANICAL | 10/24/2017 | | 10/24/2017 | | PASS |
Troy James
|
|
|
manual j report submitted
|
BLD-Wall Bracing | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PASS |
Jim Sly
|
|
|
Dillon Phone #: ###-####
|
BLD-Footing | 8/29/2017 | 8/30/2017 | 8/30/2017 | P | PART |
Tony Young
|
|
|
Andy Phone #: ###-####,, work in progress,, ok after removing roots and finishing rebar
|
BLD - Request for Extension | 8/2/2017 | 8/2/2017 | 8/3/2017 | P | PASS |
Tony Young
|
|
|
Tony Phone #: ###-####
|
Case Summary (BLD) | | | 8/3/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/2/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/2/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 7/8/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/8/2016 | | 7/8/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/8/2016 | | DONE |
|
|
|
NEED GC to sign the form ***MET*** need RP
|
Telephone call | | | 7/8/2016 | | DONE |
|
|
|
called Dylan- left message that permit is ready, fees due, that we need him to sign the GC form and need RP
|
Application received | | 7/8/2016 | | | |
|
|
|
|