Permit Ready to Issue | | | 8/11/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/11/2016 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/3/2016 | 8/5/2016 | 8/5/2016 | A | PASS |
Dave Hannah
|
|
|
Patrick Phone #: ###-####
|
BLD-Footing | 7/14/2016 | 7/15/2016 | 7/15/2016 | P | PASS |
Jim Storey
|
|
|
###-#### Patrick would like to meet at 1:00
|
PubWorks Subgrade Approval | 7/14/2016 | 7/14/2016 | 7/14/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Routing Walk-In (PW Hillside) | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/8/2016 | 7/8/2016 | 7/8/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/8/2016 | | 7/8/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2016 | | DONE |
Brian McGowan
|
|
|
|
Issue PAID IN FULL permit | | | 7/8/2016 | | DONE |
|
|
|
|
Application received | | 7/8/2016 | | | |
|
|
|
|