BLD-Final | 1/23/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Jim Storey
|
|
|
Please call 20 minutes before arrival so that I can meet you at the location. Phone #: ###-#### Inspection requested via web by Kevin Lewis
|
DOC - Permit Finaled | 1/24/2018 | 1/24/2018 | 1/24/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 12/28/2017 | 12/29/2017 | 12/29/2017 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Lewis
|
BLD-Wall cover | 9/19/2017 | 9/19/2017 | 9/19/2017 | A | PASS |
Jim Storey
|
|
|
Please call Kevin 15 minutes before arriving so he can meet you at the site. Phone #: ###-#### Inspection requested via web by Kevin Lewis insulation ok
|
BLD-Aging Inspection | 7/25/2017 | 7/25/2017 | 7/25/2017 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 3/9/2017 | 3/13/2017 | 3/13/2017 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/30/2017 | 1/30/2017 | 1/30/2017 | P | PART |
Jim Storey
|
|
|
Kevin-please call 10 prior to meet Phone #: ###-#### truss braces
|
BLD-Wall Bracing | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Jim Storey
|
|
|
Please call ahead for access, at least 10min - Kevin Phone #: ###-#### sphone # not working sheer ok exterior ok to cover//
|
BLD-Foundation | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Jim Storey
|
|
|
Troy Phone #: ###-####
|
BLD-Foundation | 8/15/2016 | 8/16/2016 | 8/16/2016 | P | CANC |
Jim Storey
|
|
|
Troy Phone #: ###-####
|
BLD-Footing | 8/10/2016 | 8/11/2016 | 8/11/2016 | A | PASS |
Phil Shearer
|
|
|
Troy Phone #: ###-####-please call if you have a correction or any questions
|
OVERRIDE | | | 7/27/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 7/18/2016 | 7/18/2016 | 7/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/18/2016 | | 7/27/2016 | | PASS |
Brian McGowan
|
|
|
|
Telephone call | | | 7/27/2016 | | |
|
|
|
Spoke with Kevin informing him that this permit is ready and the fee amount that is due
|
Issue PAID IN FULL permit | | | 7/27/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/27/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/27/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2016 | | DONE |
Brian McGowan
|
|
|
ESC - Yes ENERGY - Yes
|
Permit Ready to Issue | | | 7/27/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/21/2016 | | DONE |
|
|
|
received 1 copy of sheet A-0, A-1, A-8- gave to Brian
|
Routing - MECHANICAL | 7/20/2016 | | 7/20/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 7/18/2016 | | DONE |
|
|
|
received manual D&J
|
Routing Walk-In (Zoning) | 7/11/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/11/2016 | 7/11/2016 | 7/11/2016 | A | FAIL |
Brian McGowan
|
|
|
Need manual J and several structure details provided on plans
|
1st review completed | | | 7/11/2016 | | FAIL |
Brian McGowan
|
|
|
Failed, need Manual J, several structural items to be noted on plans.
|
Application received | | 7/11/2016 | | | |
|
|
|
|