BLD-Final | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Jim Storey
|
|
|
Ed Phone #: ###-####
|
DOC - Permit Finaled | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/2/2017 | 2/2/2017 | 2/3/2017 | P | PEND |
Dave Hannah
|
|
|
Ed Phone #: ###-#### neeeds tempered glass up stairs bathroom
|
BLD-Final | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | FAIL |
Phil Shearer
|
|
|
Ed Phone #: ###-####. Handrail to low, smoke detector upstairs.
|
BLD-Framing/Rough-in | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2016 | 8/26/2016 | 8/26/2016 | A | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####
|
BLD-Conference | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | DONE |
Phil Shearer
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 7/15/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####
|
BLD-Footing | 7/14/2016 | 7/15/2016 | 7/15/2016 | A | PASS |
Phil Shearer
|
|
|
John Phone #: ###-####
|
OVERRIDE | | | 7/12/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 7/12/2016 | 7/12/2016 | 7/12/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 7/12/2016 | | 7/12/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/12/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/12/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/12/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/11/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/11/2016 | 7/11/2016 | 7/11/2016 | A | FAIL |
Brian McGowan
|
|
|
Need structure sheets, beam sizes ect.
|
Application received | | 7/11/2016 | | | |
|
|
|
|