BLD-Framing/Rough-in | 9/29/2016 | 9/30/2016 | 9/30/2016 | P | PART |
Jim Sly
|
|
|
Shane Phone #: ###-#### Framing repairs OK. Need to obtain a Mech. permit for Gas line...........and Plumbing permit to access previous plumbing work.......and obtain a Plumbing final.
|
Routing Walk-In (BLD) | 9/27/2016 | 9/27/2016 | 9/29/2016 | A | DONE |
Brian McGowan
|
|
|
Plan Modifications
|
Plan assigned to (BJM) | 9/27/2016 | 9/27/2016 | 9/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/27/2016 | | 9/29/2016 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 9/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/29/2016 | | DONE |
|
|
|
All Met
|
Issue PAID IN FULL permit | | | 9/29/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/27/2016 | | DONE |
|
|
|
Two copies of sheets A-1.0, 2.0, 2.1, 3.0, and 4.0 taken to Brian Mc
|
BLD-Conference | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | DONE |
Jim Sly
|
|
|
Sam Phone #: ###-####
|
Routing Walk-In (Zoning) | 8/12/2016 | 8/12/2016 | 8/12/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/12/2016 | 8/12/2016 | 8/12/2016 | A | FAIL |
Brian McGowan
|
|
|
Needs to finish intial forensic demolition and provide the structural details he intends to do. Plans are still required.
|
Plan Modification Accepted | | | 8/12/2016 | | DONE |
|
|
|
received 2 full sets of drawing-also doing work on a retaining wall so sent to P & Z first
|
Routing Walk-In (BLD) | 7/11/2016 | 7/11/2016 | 7/11/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/11/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/11/2016 | | 7/11/2016 | | PASS |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/11/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/11/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/11/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/11/2016 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 7/11/2016 | | DONE |
|
|
|
|
Application received | | 7/11/2016 | | | |
|
|
|
|