BLD-Aging Inspection | 8/28/2019 | 8/28/2019 | 8/30/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 8/29/2019 | 8/29/2019 | 8/30/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 4/15/2019 | 4/16/2019 | 4/16/2019 | A | PART |
Tony Young
|
|
|
Vince- please call for access Phone #: ###-####,, needs handrails on exterior,,
|
Zoning Approval | 4/16/2019 | 4/16/2019 | 4/16/2019 | | DONE |
Ted Vanegas
|
|
|
|
BLD-Framing/Rough-in | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PASS |
Dave Hannah
|
|
|
Andrew Phone #: ###-#### garage ok to cover
|
BLD-Other | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PASS |
Tony Young
|
|
|
sheathin-Ryan Phone #: ###-####
|
BLD-Wall Bracing | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | CANC |
Tony Young
|
|
|
Andrew Phone #: 20###-####
|
BLD-Aging Inspection | 7/30/2018 | 7/30/2018 | 7/31/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 4/16/2018 | 4/17/2018 | 4/18/2018 | P | DONE |
Dave Hannah
|
|
|
Vince Phone #: ###-#### bldg a warm wall around plumbing upstairs
|
BLD-Energy code compliance | 3/15/2018 | 3/16/2018 | 3/17/2018 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Energy code compliance | 3/12/2018 | 3/13/2018 | 3/13/2018 | P | PART |
Tony Young
|
|
|
call when on way // Ben Phone #: ###-####,, basement ok to cover
|
BLD-Wall cover | 3/5/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Tony Young
|
|
|
Vince Phone #: ###-####,, ok to insulate
|
BLD-Footing | 2/20/2018 | 2/21/2018 | 2/21/2018 | A | PASS |
Dave Hannah
|
|
|
Jeremy Phone #: ###-####
|
BLD-Conference | 12/28/2017 | 12/29/2017 | 12/29/2017 | P | PART |
Tony Young
|
|
|
Sam Phone #: ###-####,, frame ?s,,
|
BLD-Framing/Rough-in | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PART |
Tony Young
|
|
|
Vince Esparza (project manager); (Bld15-02315 still open, but he said work was done?) Phone #: ###-####,, walk through on framing,, need engineer to walk job,, stair headroom,, seal pack,, carry loads down
|
BLD-Framing/Rough-in | 8/22/2017 | 8/23/2017 | 8/23/2017 | A | PART |
Tony Young
|
|
|
Call hour before arrival //for access // Vince Phone #: ###-####,, ok to insulate,, existing framing
|
BLD-Conference | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PART |
Tony Young
|
|
|
Call hour before arrival //for access // Vince Phone #: ###-####,, walk through
|
BLD-Conference | 8/21/2017 | 8/21/2017 | 8/22/2017 | A | PART |
Tony Young
|
|
|
Call hour before arrival //for access // Vince Phone #: ###-####,, frame walk through
|
BLD-Framing/Rough-in | 8/21/2017 | 8/21/2017 | 8/21/2017 | P | DEFR |
Brandon Shaw
|
|
|
Call for access // Vince Phone #: ###-####
|
BLD-Conference | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Tony Young
|
|
|
concerned customer wants to know if this job has been abandoned-i told him the permit shows it''s still in ISS status// talked with owner,, they are almost ready for a frame inspection,, they shut down for a while due to mud/weather conditions and the neighbors were complaining etc
|
Plan Modification Accepted | | | 3/17/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 3/17/2017 | | 3/17/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Other | 12/29/2016 | 1/3/2017 | 1/3/2017 | A | DONE |
Bob Archibald
|
|
|
Ryan// for bond release Phone #: ###-####. Structure attached to permanent foundation, openings to structure secure against entry and property is fenced. Ok for bond release.
|
BLD-Conference | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | CANC |
Phil Shearer
|
|
|
zack Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | NR |
Tony Young
|
|
|
Call when there // Zach Phone #: ###-####,, conf walk through only,,
|
BLD-Conference | 9/27/2016 | 9/29/2016 | 9/29/2016 | P | PART |
Tony Young
|
|
|
Ryan-wants to meet @ 3:00 Phone #: ###-####,, ?s on structure,, ok to add supports as needed,, just need to justify
|
BLD-Conference | 8/26/2016 | 8/29/2016 | 8/29/2016 | P | PART |
Tony Young
|
|
|
would like call ahead; Ryan Phone #: ###-####,, ?s on securing house to the foundation,, needs to get an engineer to provide connection details,, also needs to make home and basement secure for bond release as well as engineered fix on connection,, ok to start other work on project pending proper permits
|
Issue PAID IN FULL permit | | | 8/23/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 7/14/2016 | 7/14/2016 | 8/17/2016 | | DONE |
David Ferguson
|
|
|
due 7/21 - Plan review complete - Need Manual J, stair detail, section showing head height of basement and converted attic.
Manual J does not show a main floor plan. The attic area does not appear to have proper head height. Asked for more detail.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/17/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/17/2016 | | DONE |
|
|
|
needs; GC Form
|
Routing - MECHANICAL | 8/4/2016 | | 8/9/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/4/2016 | | 8/4/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - MECHANICAL | 8/1/2016 | | 8/1/2016 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 7/28/2016 | | 7/28/2016 | | FAIL |
Troy James
|
|
|
emailed don heating supply corrections
|
Routing - PLAN CHECK | 7/28/2016 | | 7/28/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 7/14/2016 | | 7/21/2016 | | FAIL |
David Ferguson
|
|
|
Need Manual J, stair detail, section showing head height of basement and converted attic.
|
1st review completed | | | 7/21/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - Design Review | 7/14/2016 | | 7/19/2016 | | PASS |
Ted Vanegas
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/14/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/14/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/14/2016 | | DONE |
|
|
|
|
Application received | | | 7/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 13 2016 3:54PM
|