Description
**(BANANA INK)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for a 1061 sq ft existing retail tenant. This space was previously occupied by "Domestic Bliss" BLD14-03138, second floor limited to light storage or 40psf. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. There will be no change to the occupancy. **ajs**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  8/23/2016 DONE
Permanent Occupancy  8/23/2016 DONE
BLD-Final8/11/20168/11/20168/11/2016PPASS
DetailsJim Sly
OK for Perm Occ.
Plan Reviewer's activity  8/11/2016 DONE
DetailsAdele J Schaffeld-Griffin
guard rail permitted and installed under BLD01-01445
BLD-Final8/9/20168/9/20168/9/2016PPEND
DetailsJim Sly
Phone Call to Lana ...owner of Banana Ink. Verbal Correction Notice.....Need documentation or Engineering Providing Evidence that existing glass guard at balcony meets all requirements per 2012 IBC.
BLD-Final8/2/20168/3/20168/3/2016APART
DetailsJim Sly
Lana Phone #: ###-####
OK for Temp Occ. OK for Perm Occ. when Glass Guard at 2nd floor is determined built to meet code provision for Glass guards Section 1013.2 1013.2.1 1607.8.1 2407.1 2407.1.1 2012 IBC
FIRE-Final Inspection8/2/20168/2/20168/2/2016PPASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
Issue PAID IN FULL permit  8/2/2016 DONE
Plan assigned to (AJS)7/13/20167/13/20167/14/2016 PASS
DetailsAdele J Schaffeld-Griffin
Routing - PLAN CHECK7/13/2016 7/14/2016 PASS
DetailsAdele J Schaffeld-Griffin
1st review completed  7/14/2016 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  7/14/2016 DONE
DetailsAdele J Schaffeld-Griffin
PLANS/APPL TAKEN TO FRONT DESK  7/14/2016 DONE
Permit Ready to Issue  7/14/2016 DONE
Print Occupancy Form  7/14/2016 DONE
Telephone call  7/14/2016 DONE
Spoke with Lana informing her this permit is ready to be picked up and which ever tech she sees will go over the required inspection for occupancy
Intake Approval  7/13/2016 PASS
DetailsAdele J Schaffeld-Griffin
Recd Pcfee & Taken To Pln CK  7/13/2016 DONE
First Notice 9/2/2016   