Permit Information
Permit NumberBLD16-02574
StatusFinaled
Name TOWERCOM TECHNOLOGIES LLC
Site Address 1161 W RIVER ST 160
Project NameBOI BSU - LTE-PCS - 2015
Customer Number 
ePlanReviewYes
Description
NOTE: See engineering for required fix to the vertical legs of the skid-mount. Verizon Wireless is proposing the following scope of work at their BOI BSU communication site:
No change to the existing antennas
Exchange (3) existing 700MHz TRDU amps with new 60W 700mhz Remote Radio Head (RRH) amps
Add (3) RRH amps for PCS
Add (1) run of Hybriflex cable and (1) OVP surge suppression box.
There will also be some minor modifications within the existing ground shelter; however, there will no change in ground space, power requirements or overall tower height. The upgraded equipment will provide new frequencies to prepare for the next generation and improve capacity coverage in the area. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/201712/12/201712/12/2017PPASS
DetailsDave Hannah
Verizon Wireless roof top cellphone site, please give me a call when you get ready to head out to the site, I will have to meet you of site with a key to access the roof. Phone #: ###-#### Inspection requested via web by Nathan Bly
DOC - Permit Finaled12/12/201712/12/201712/12/2017PPASS
DetailsDave Hannah
BLD-Aging Inspection11/2/201711/2/201711/2/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection6/20/20176/20/20176/20/2017 PASS
DetailsDave Hannah
Issue PAID IN FULL permit  8/5/2016 DONE
Plan assigned to (DAF)7/25/20167/25/20168/3/2016 DONE
DetailsDavid Ferguson
due 8/5
Routing - PLAN CHECK7/25/2016 8/3/2016 PASS
DetailsDavid Ferguson
Routing - PLANNING7/25/2016 8/3/2016 PASS
DetailsCeline Acord
1st review completed  8/3/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  8/3/2016 DONE
Permit Ready to Issue  8/3/2016 DONE
Need GC Form and Revised Cert of Value
Intake Approval  7/25/2016 PASS
DetailsDavid Ferguson
Intake Approval  7/15/2016 FAIL
DetailsDavid Ferguson
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
3) Engineering calcs; not just a letter from the engineer that states that the added loads are okay. Carl needs to see the loads for the entire tower or roof top pad.
4) In this case, the engineer says that the legs of the skid mount vertical legs shall be strengthened but doesn't tell us how that is to be done. Will another engineer provide you with proper engineering for that scope of work?
Application received  7/14/2016 DONE
Application submitted via PDS Online on Jul 14 2016 10:00AM
First Notice12/12/201712/12/2017   
DetailsDave Hannah