Permit Information
Permit NumberBLD16-02578
StatusFinaled
Name TOWERCOM TECHNOLOGIES LLC
Site Address 225 N 9TH ST
Project NameBOI Capitol - LTE-PCS - 2015
Customer Number 
ePlanReviewYes
Description
Verizon Wireless is proposing the following scope of work at their BOI Capitol communication site:
Existing antennas remain in place and are unchanged.

Swap out the (6) existing 700mhz TRDU amps with new 60W RRH amps. Add (6) RRH additional amps for PCS

Add (2) runs of Hybriflex cable and connect the (4) receive branches for all technologies that will have an RRH in place

. There will also be some minor modifications within the existing ground shelter; however, there will no change in ground space, power requirements or overall tower height. The upgraded equipment will provide new frequencies to prepare for the next generation and improve capacity coverage in the area. The work will be performed per the approved plans, attached engineering and local codes. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201610/21/201610/21/2016PPASS
DetailsDave Hannah
Nathan Phone #: ###-####
DOC - Permit Finaled10/21/201610/21/201610/21/2016PPASS
DetailsDave Hannah
Issue PAID IN FULL permit  8/4/2016 DONE
Inspection Record Card- Bld  8/4/2016 DONE
Plan assigned to (DAF)7/20/20167/20/20168/2/2016 DONE
DetailsDavid Ferguson
due 8/2
Routing - PLAN CHECK7/20/2016 8/2/2016 PASS
DetailsDavid Ferguson
1st review completed  8/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  8/2/2016 DONE
Permit Ready to Issue  8/2/2016 DONE
Need GC Form and Revised Cert of Value
Routing - PLANNING7/20/2016 7/20/2016 PASS
DetailsCeline Acord
Intake Approval  7/20/2016 PASS
Intake Approval  7/15/2016 FAIL
DetailsDavid Ferguson
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
3) Engineering calcs; not just a letter from the engineer that states that the added loads are okay. Carl needs to see the loads for the entire tower or roof top pad.
4) In this case, the engineer says that the legs of the skid mount vertical legs shall be strengthened but doesn't tell us how that is to be done. Will another engineer provide you with proper engineering for that scope of work?
Application received  7/14/2016 DONE
Application submitted via PDS Online on Jul 14 2016 11:17AM
First Notice10/21/201610/21/2016   
DetailsDave Hannah