BLD-Final | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
DOC - Permit Finaled | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 8/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/4/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 7/20/2016 | 7/20/2016 | 8/2/2016 | | DONE |
David Ferguson
|
|
|
due 8/2
|
Routing - PLAN CHECK | 7/20/2016 | | 8/2/2016 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 8/2/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/2/2016 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Routing - PLANNING | 7/20/2016 | | 7/20/2016 | | PASS |
Celine Acord
|
|
|
|
Intake Approval | | | 7/20/2016 | | PASS |
|
|
|
|
Intake Approval | | | 7/15/2016 | | FAIL |
David Ferguson
|
|
|
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
3) Engineering calcs; not just a letter from the engineer that states that the added loads are okay. Carl needs to see the loads for the entire tower or roof top pad.
4) In this case, the engineer says that the legs of the skid mount vertical legs shall be strengthened but doesn't tell us how that is to be done. Will another engineer provide you with proper engineering for that scope of work?
|
Application received | | | 7/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2016 11:17AM
|
First Notice | 10/21/2016 | 10/21/2016 | | | |
Dave Hannah
|
|
|
|