Permit Information
Permit NumberBLD16-02580
StatusFinaled
Name MARSH CREEK LLC
Site Address 1852 W AIRPORT WAY
Project NameBOI Commerce - LTE-PCS - 2015
Customer Number 
ePlanReviewYes
Description
Verizon Wireless is proposing the following scope of work at their BOI Commerce communication site:

No change to the existing antennas
Swap out the (3) existing 700mhz TRDU amps with (3) new 60W RRH amps.
Add (3) extra RRH amps for PCS. Swap AWS 40W RRH for AWS RRH 60W.
Add (1) additional Hybriflex and (1) additional OVP box needed for the tower top.
Connect the (4) branch receive for all technologies that have an RRH.
Add the (2) additional bCEM cards for PCS and AWS2 (shelter)

There will also be some minor modifications within the existing ground shelter; however, there will no change in ground space, power requirements or overall tower height. The upgraded equipment will provide new frequencies to prepare for the next generation and improve capacity coverage in the area.
Work will be performed per the approved plans, attached engineering and local codes. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice9/9/20169/9/20165/10/2017 DONE
DetailsJim Storey
This permit finaled on the web by Kim Anderson
BLD-Final9/9/20169/9/20169/9/2016PPASS
DetailsJim Storey
Eric Phone #: ###-####
DOC - Permit Finaled9/9/20169/9/20169/9/2016PPASS
DetailsJim Storey
Issue PAID IN FULL permit  8/4/2016 DONE
Plan assigned to (DAF)7/20/20167/20/20168/2/2016 DONE
DetailsDavid Ferguson
due 8/2
Routing - PLAN CHECK7/20/2016 8/2/2016 PASS
DetailsDavid Ferguson
1st review completed  8/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  8/2/2016 DONE
Permit Ready to Issue  8/2/2016 DONE
***MET*** NEED GC form and certificate of value
Intake Approval  7/20/2016 PASS
Routing - PLANNING7/20/2016 7/20/2016 PASS
DetailsCeline Acord
Intake Approval  7/15/2016 FAIL
DetailsDavid Ferguson
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
3) Engineering calcs; not just a letter from the engineer that states that the added loads are okay. Carl needs to see the loads for the entire tower or roof top pad.

Application received  7/14/2016 DONE
Application submitted via PDS Online on Jul 14 2016 11:31AM