Permit Information
Permit NumberBLD16-02583
StatusFinaled
Name TOWERCOM TECHNOLOGIES LLC
Site Address 5075 S HOLCOMB RD
Project NameBOI Lakewood - LTE-PCS - 2015
Customer Number 
ePlanReviewYes
Description
Verizon Wireless is proposing the following scope of work at their BOI Lakewood communication site:

No change to the existing antennas
Swap out the 3 existing 700MHz TRDU amps with new 60W 700MHz RRH amps
Add (3) extra RRH amps for PCS
Add (1) additional Hybriflex and (1) additional OVP box needed for the tower top
Connect the (4) branch receive for all technologies that have an RRH. Add the (2) additional bCEM cards for PCS and AWS2 (shelter).

There will also be some minor modifications within the existing ground shelter; however, there will be no change in ground space, power requirements or overall tower height. The upgraded equipment will provide new frequencies to prepare for the next generation and improve capacity coverage in the area. The work will be performed per the approved plans, attached engineering and local codes. **DAF**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/201712/8/201712/8/2017PPASS
DetailsJim Storey
Verizon cell phone site, there will be a green cattle gate off the main road gate combo is 7208. Land owner ask that we close all the gates behind us. Phone #: ###-#### Inspection requested via web by Nathan Bly
DOC - Permit Finaled12/8/201712/8/201712/8/2017PPASS
DetailsJim Storey
Issue PAID IN FULL permit  8/23/2016 DONE
Inspection Record Card- Bld  8/23/2016 DONE
Permit Ready to Issue  8/9/2016 DONE
Need GC Form and Revised Cert
Plan assigned to (DAF)7/20/20167/20/20168/2/2016 DONE
DetailsDavid Ferguson
due 8/2
Routing - PLAN CHECK7/20/2016 8/2/2016 PASS
DetailsDavid Ferguson
1st review completed  8/2/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  8/2/2016 DONE
Routing - PLANNING7/20/2016 7/20/2016 PASS
DetailsCeline Acord
Intake Approval  7/20/2016 PASS
Intake Approval  7/15/2016 FAIL
DetailsDavid Ferguson
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
Application received  7/14/2016 DONE
Application submitted via PDS Online on Jul 14 2016 12:16PM
First Notice12/8/201712/8/2017   
DetailsJim Storey