BLD-Final | 12/6/2017 | 12/13/2017 | 12/13/2017 | A | PASS |
Jim Storey
|
|
|
Verizon Wireless roof top cellphone site, there is an access ladder to the roof on the back of the building by the loading dock. Phone #: ###-#### Inspection requested via web by Nathan Bly
|
DOC - Permit Finaled | 12/13/2017 | 12/13/2017 | 12/13/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/20/2017 | 6/20/2017 | 6/21/2017 | | DONE |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 8/5/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 7/25/2016 | 7/25/2016 | 8/3/2016 | | PASS |
David Ferguson
|
|
|
due 8/5
|
Routing - PLAN CHECK | 7/25/2016 | | 8/3/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - PLANNING | 7/25/2016 | | 8/3/2016 | | PASS |
Celine Acord
|
|
|
|
1st review completed | | | 8/3/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2016 | | DONE |
|
|
|
Need GC Form and Revised Cert of Value
|
Intake Approval | | | 7/25/2016 | | PASS |
David Ferguson
|
|
|
|
Intake Approval | | | 7/15/2016 | | FAIL |
David Ferguson
|
|
|
1) A Zoning Certificate must be obtained from our Planning Department PRIOR to submittal and then uploaded into the file.
2) All plan sheets must be broken out individually and not bundled the way you have them uploaded. Also, when you upload them, be sure to use the proper naming convention for each page. These names can be found on the cover page of the plans under Drawing Index (example: Site Plan / Title Sheet / Antenna Plans).
3) Engineering calcs; not just a letter from the engineer that states that the added loads are okay. Carl needs to see the loads for the entire tower or roof top pad.
|
Application received | | | 7/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2016 12:41PM
|
First Notice | 12/13/2017 | 12/13/2017 | | | |
Jim Storey
|
|
|
|