BLD-Final | 6/15/2017 | 6/16/2017 | 6/16/2017 | A | PASS |
Tony Young
|
|
|
Garage access code is 0713 enter. Please call with any issues/questions. Thanks, Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
DOC - Permit Finaled | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
PubWorks Occupancy Approval | 6/15/2017 | 6/15/2017 | 6/15/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s designer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Other | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | PASS |
Tony Young
|
|
|
Need an inspection of the Fire Treated T;G material we are installing on a house in a WUI zone. The material has been approved by Romeo. Wanted to check and see if we need the material checked before we stain ; install? Thanks Kim Phone #: ###-#### Inspection requested via web by Kim Winkle
|
BLD-Conference | 3/1/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Tony Young
|
|
|
Need to have an Inspection on our 5/8" sheetrock soffits at 2626 N Heavens way -- only one layer needed because soffit material will be cement board. Thanks! Phone #: ###-#### Inspection requested via web by Kim Winkle,, base layer of sheet rock ok on soffit areas,, patios/porches will be alternate method
|
BLD-Energy code compliance | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PART |
Tony Young
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Kim Winkle,, ok to cover interior,, still need sofit inspection
|
BLD-Framing/Rough-in | 1/25/2017 | 1/26/2017 | 1/26/2017 | P | FAIL |
Mike Jordan
|
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Kim Winkle. NAil off all simpson hangars, fireblock al fur downs around showers and concealed areas either side of 3rd garage bay at ceiling level. Ok to insualte.
|
BLD-Conference | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PART |
Tony Young
|
|
|
Hi, need to schedule a meeting to review a ventless roof application before we proceed with needed foam application. Please call either Steve @ ###-#### or Mike @ ###-#### to schedule. Thanks Phone #: ###-#### Inspection requested via web by Kim Winkle// ok to apply spray foam on the underside of the roof deck
|
BLD-Wall Bracing | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Kim Winkle,, exterior shear ok
|
BLD-Foundation | 11/7/2016 | 11/7/2016 | 11/8/2016 | P | DONE |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/3/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 11/2/2016 | 11/3/2016 | 11/3/2016 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
PubWorks Subgrade Approval | 10/31/2016 | 10/31/2016 | 11/2/2016 | | DONE |
Jason C. Taylor
|
|
|
**ENTIRE FOOTPRINT OF BUILDING INCLUDING ISOLATED EXTRIOR PADS***A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/30/2016 | 10/31/2016 | 10/31/2016 | P | NR |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/30/2016 | 10/31/2016 | 10/30/2016 | A | CANC |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Sunday, October 30, 2016.
|
BLD-Other | 10/6/2016 | 10/7/2016 | 10/7/2016 | A | PASS |
Jim Sly
|
|
|
Erosion control BMP inspection. Please call steve with any questions or concerns, 850.8424. All improvements should be done. Thank you, steve Phone #: ###-#### Inspection requested via web by steve hanson GOOD JOB!
|
BLD-Other | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | FAIL |
Jim Sly
|
|
|
Site ready for EROSION CONTROL INSPECTION. Please call Steve for questions/comments/timing to arrive on site and i will meet you there. Thanks! Phone #: 208-850 -8424 Inspection requested via web by steve hanson Correction notice posted. Old waddles not effective. Re-do Re-configure add more......as required. some older riffs are actually going underneath waddles. remove sediment buildup behind waddles. Prevent sediment from reaching storm drain lid and holes......protect drain. Clean out (2) existing drain inlet filters. Install silt fence per MFGs installation instructions.
|
Issue PAID IN FULL permit | | | 10/4/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/4/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/3/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 9/7/2016 | 9/7/2016 | 10/3/2016 | | DONE |
David Ferguson
|
|
|
due 9/26 - Plan review complete - need addtl. WUI details and Hillside has failed too
|
Inspection Record Card- Bld | | | 10/3/2016 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2016 | | DONE |
|
|
|
called Steve- left message that permit is ready and fees due
|
Routing - PLAN CHECK | 9/27/2016 | | 10/3/2016 | | PASS |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 10/3/2016 | | DONE |
|
|
|
received two copies of sheet 6- gave to Dave
|
Case Summary (BLD) | | | 10/3/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2016 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/29/2016 | | 9/29/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Grading-Hillside | 9/28/2016 | | 9/28/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 9/27/2016 | | DONE |
|
|
|
received (3) copies of materials testing & inspection reports
|
Routing PW Grading-Hillside | 9/23/2016 | | 9/26/2016 | | FAIL |
Jason C. Taylor
|
|
|
1. Submit 3 copies of ALL the geotechnical reports, update letters, and reliance letters. I cannot process this application without these reports/letters.See the blurb from my approval letter for the P&Z application.
“The geotechnical investigation (by Materials Testing & Inspection dated April 15, 2015 (Submitted), Reliance Letter dated August 12, 2016 (NOT SUBMITTED), and Warranty Conditions confirmation email dated August 17, 2016 (NOT SUBMITTED))”.
|
Plan resubmittals received | | | 9/26/2016 | | DONE |
|
|
|
Two copies of pg 6 taken to dave f
|
Routing - PLAN CHECK | 9/14/2016 | | 9/22/2016 | | FAIL |
David Ferguson
|
|
|
|
1st review completed | | | 9/22/2016 | | FAIL |
David Ferguson
|
|
|
|
Plan resubmittals received | | | 9/22/2016 | | DONE |
|
|
|
received revised engineering and grading plans
|
Routing - FIRE | 9/14/2016 | | 9/14/2016 | | PASS |
Scott Arellano
|
|
|
No comments attached to case. This structure has been evaluated for fire department vehicle access and WUI defensible space.
|
Routing - PLANNING | 9/9/2016 | | 9/14/2016 | | PASS |
Leon Letson
|
|
|
|
Routing - MECHANICAL | | | 9/14/2016 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 9/14/2016 | | 9/14/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 3,322 sq. ft., one story single family dwelling with 5 bedrooms, 4 bathrooms, approximately ???? sq. ft. of covered patio/porch and a 1,099 sq. ft. attached garage
|
Routing PW Grading-Hillside | 9/8/2016 | | 9/9/2016 | | FAIL |
Jason C. Taylor
|
|
|
1. Submit 3 copies of ALL the geotechnical reports, update letters, and reliance letters. I cannot process this application without these reports/letters.
2. Update grading plan as requested in Hillside approval. There are several items still missing or unclear. Call for details.
3. Update Structural engineering for tall wall. Structural engineering has a 6’ 8” wall and grading plan has 6’. A 6’ 8” section will not be approved.
|
Routing - PUBLIC WORKS | 9/9/2016 | | 9/9/2016 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE
|
Routing - Addressing | 9/7/2016 | | 9/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Rating | 9/8/2016 | | 9/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/7/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/7/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/7/2016 | | 9/7/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | 7/14/2016 | | | |
|
|
|
|