Third Notice | | 2/18/2017 | 2/16/2017 | | DONE |
|
|
|
This permit finaled on the web by Jackie Phelps
|
Third Notice | | 1/16/2017 | 2/13/2017 | | DONE |
Christina Prado
|
|
|
Mailed 2/13/17
|
Third Notice | | 12/17/2016 | 1/11/2017 | | DONE |
|
|
|
|
Second Notice | | 11/24/2016 | 12/12/2016 | | DONE |
|
|
|
Mailed 12-13-16
|
First Notice | 10/18/2016 | 10/18/2016 | 11/14/2016 | | DONE |
Jim Sly
|
|
|
Mailed 11-15-16
|
BLD-Final | 10/12/2016 | 10/13/2016 | 10/18/2016 | P | PASS |
Jim Sly
|
|
|
Phone #: 2087240402 >> Inspection requested via mobile web by Michael Schreiber
|
DOC - Permit Finaled | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Jim Sly
|
|
|
|
Zoning Approval | 10/17/2016 | 10/17/2016 | 10/17/2016 | | DONE |
Cody Riddle
|
|
|
|
BLD-Grading Inspection | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | NR |
Jim Sly
|
|
|
Phone #: 2087240402 >> Inspection requested via mobile web by Michael Schreiber called Mike.......Need Zoning inspection.
|
FIRE-Final Inspection | 10/12/2016 | 10/13/2016 | 10/13/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/11/2016 | 10/12/2016 | 10/12/2016 | P | NR |
Jim Sly
|
|
|
Phone #: 2087240402 >> Inspection requested via mobile web by Mike Schreiber Need Fire/life and Zoning.
|
(F) Reprint permit | | | 10/10/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/10/2016 | | DONE |
|
|
|
plan mod fees paid
|
OVERRIDE | | | 9/8/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/24/2016 | 8/24/2016 | 9/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
review completed
|
Routing - PLAN CHECK | 9/8/2016 | | 9/8/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/8/2016 | | DONE |
|
|
|
DO NOT RE-ISSUE PLAN MOD ONLY
|
Routing - PLAN CHECK | 8/24/2016 | | 9/6/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING | 8/24/2016 | | 8/24/2016 | | PASS |
Cody Riddle
|
|
|
|
Plan Modification Accepted | | | 8/24/2016 | | DONE |
|
|
|
plan mod excepted in E Plan Review
|
BLD-Other | 8/20/2016 | 8/22/2016 | 8/22/2016 | A | CANC |
Phil Shearer
|
|
|
Erosion Phone #: ###-#### >> Inspection requested via web by Michael Schreiber Inspection cancelled via mobile web on Monday, August 22, 2016.
|
Issue PAID IN FULL permit | | | 8/15/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/11/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 7/20/2016 | 7/20/2016 | 8/11/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed outdoor school
|
Routing - PLAN CHECK | 7/20/2016 | | 8/11/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/11/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/11/2016 | | 8/11/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/11/2016 | | 8/11/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(LOWELL SCOTT OUTDOOR CLASSROOM)No membrane structures part of this permit at this time. Permit for the construction of an outdoor learning area consisting of learning stations conctructed of concrete walls an area for picnic tables an accessible route from the main building to the learning area. An accessible route shall be provided to all areas. This is in association with the school restroom facilites are provided in the main building
|
Permit Ready to Issue | | | 8/11/2016 | | DONE |
|
|
|
Need GC Form, Revised Cert and RP
|
Routing - PLANNING | 8/4/2016 | | 8/4/2016 | | PASS |
Cody Riddle
|
|
|
CUP approved. Okay to issue permit at end of day, Monday, August 8, 2016. PER JGW. Appeal period ended August 8.
|
Routing PW Drainage | 7/20/2016 | | 7/25/2016 | | PASS |
Brian Murphy
|
|
|
ROUGH GRADING ONLY
|
Routing - Erosion and Sediment | 7/21/2016 | | 7/21/2016 | | FAIL |
Evan Jenkins
|
|
|
Full Erosion and Sediment Control Narrative and BMP Site Map Required For Approval due to size of disturbance.
Evan Jenkins 794.3958
|
Routing - PLUMBING | 7/20/2016 | | 7/21/2016 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing - FIRE | 7/20/2016 | 7/20/2016 | 7/20/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed. PDS Fire Inspector to verify a sidewalk exists to allow safe travel from area to school and nearest exit discharge. No additional comments attached.
|
Intake Approval | | | 7/20/2016 | | PASS |
Carl D Madsen
|
|
|
approved prescreen Carl M
|
Routing - PLANNING | 7/20/2016 | | 7/20/2016 | | FAIL |
Cody Riddle
|
|
|
A CUP Modificaiton is required. Emailed applicant today.
|
Routing - Addressing | 7/20/2016 | | 7/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 7/20/2016 | | 7/20/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 7/19/2016 | | FAIL |
|
|
|
Please provide the steel building plans and construction details.
Please provide a lighting plan and lighting compliance. At a minimum means of egress lighting and exit lighting including exit discharge lighting is required.
Please provide an electrical plan as this is a new building.
Please provide an updated restroom fixture calculation with the new building area to verify that the existing fixture count is sufficient.
|
Application received | | | 7/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 14 2016 3:28PM
|