BLD-Final | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Tony Young
|
|
|
judy - call prior to going to meet Phone #: ###-####
|
DOC - Permit Finaled | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Tony Young
|
|
|
signed paperwork
|
BLD-Final | 11/8/2016 | 11/9/2016 | 11/9/2016 | A | PEND |
Dave Hannah
|
|
|
Judy-homeowner Phone #: ###-#### needs to install co2 detectors
|
BLD-Framing/Rough-in | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
BLD-Energy code compliance | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Jim Sly
|
|
|
Dan Phone #: ###-####
|
Routing Walk-In (BLD) | 7/29/2016 | 7/29/2016 | 7/29/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 7/29/2016 | | 7/29/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/29/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/29/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/29/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/29/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/15/2016 | 7/15/2016 | 7/15/2016 | P | FAIL |
Brian McGowan
|
|
|
Proposed to remove the majority of a main floor exterior wall and replace with two sliding glass doors. Engineering is needed to verify the lateral and shear.
|
1st review completed | | | 7/15/2016 | | FAIL |
Brian McGowan
|
|
|
|
Application received | | 7/15/2016 | | | |
|
|
|
|