BLD-Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/31/2016 | 10/31/2016 | 10/31/2016 | A | NR |
Dave Hannah
|
|
|
Inspection requested via web by Justin Brewer
|
BLD-Final | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Brewer gates note to code
|
BLD-Foundation | 8/2/2016 | 8/3/2016 | 8/3/2016 | A | PASS |
Jim Sly
|
|
|
Rebar // Justin Phone #: ###-####
|
PubWorks Subgrade Approval | 8/1/2016 | 8/1/2016 | 8/1/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the pool subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 7/28/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/18/2016 | | 7/20/2016 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 7/18/2016 | | 7/20/2016 | | DONE |
Tisha Gallop
|
|
|
pool received 7/18; need engineering and barrier; routed to esc
|
Inspection Record Card- Bld | | | 7/20/2016 | | DONE |
|
|
|
|
1st review completed | | | 7/20/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/20/2016 | | DONE |
|
|
|
Sharing a ESC with the home permit. Ok by Andy Long
|
Telephone call | | | 7/20/2016 | | DONE |
|
|
|
Spoke with Justin informing him that this permit is ready and the fee amount that is due
|
Routing Walk-In (PW Hillside) | 7/18/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 7/18/2016 | 7/18/2016 | 7/18/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 7/18/2016 | 7/18/2016 | 7/18/2016 | A | CANC |
Tisha Gallop
|
|
|
took in as level 2
|
Routing - Erosion and Sediment | 7/18/2016 | | 7/18/2016 | | PASS |
Andy J. Long
|
|
|
Pool construction approved to be under existing ESC permit for the SFH, see ESC15-01287
|
Application received | | 7/18/2016 | | | |
|
|
|
|