Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-02622
StatusFinaled
Name RRC CONTRACTORS
Site Address 1604 S BROADWAY AVE
Project NameBlack Rock Coffee Shop
Customer Number 
ePlanReviewYes
Description
(BLACK ROCK CAFE) //Plan Modification to the barista and storage areas (shift window openings at drive thru and washing area, lower the height of the drive thru window, relocating equipment and layout changes), select interior finish modifications, water heater relocated from storage room 103 to attic space, relocate door/door frame and wall opening at storage room 102, relocate roof access hatch and roof access ladder, removal of roof drain piping and add an exterior scupper, relocate upper scupper, changed select type of interior lighting, modify soffit for shelving, relocate attic access door in restroom, shift exterior awning centered over drive thru window, plumbing and electrical. 10/1/16 **JG**// Permit to construct a new 1,352 sq. ft. building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, construction of stud framed exterior envelope walls, roof construction, construction of interior non-bearing walls to create a customer seating area, two ADA accessible restrooms, a commercial kitchen, a walk-in cooler and storage area, installation of new windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 2/25/20172/28/2017 DONE
This permit finaled on the web by derek cooper
First Notice 1/28/20172/15/2017 DONE
PubWorks Occupancy Approval1/18/20171/18/20171/18/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  1/18/2017 DONE
BLD-Aging Inspection1/10/20171/10/20171/10/2017 PEND
DetailsJim Storey
pw
Plan Reviewer's activity  1/3/2017 DONE
DetailsJason Blais
Final Special Inspection Report uploaded into the ePlanReview case.
Temporary Occupancy12/29/20163/29/201712/29/2016 DONE
DetailsBrittany Hill
BLD-Final11/10/201611/10/201611/10/2016PPASS
DetailsMike Jordan
Duane-as late as possible becasue the fire final wil be as early as possilbe PM today Phone #: ###-####. Ok for temp occ. Will be ok for perm occ. once plumbing and public works signs perm.
FIRE-Final Inspection11/10/201611/10/201611/10/2016PPASS
DetailsTroy Cobbley
life safety passed. Duct smoke detectors installed
Print Occupancy Form  11/10/2016 DONE
PubWorks Temp Occupancy Appr11/9/201611/9/201611/9/2016 DONE
DetailsTiffany Lowery
PubWorks Temp Occupancy Appr11/9/201611/9/201611/9/2016 DONE
DetailsTiffany Lowery
FIRE-Final Inspection11/7/201611/7/201611/7/2016PFAIL
DetailsTroy Cobbley
provide additional address as per notes, provide a duct smoke detector and asssociated remote annunciator for hvac shutdown. and provide testing. Device is addressed in notes and shown on the E sheets.
Zoning Approval11/4/201611/4/201611/4/2016 PASS
DetailsJosh Wilson
BLD-Energy code compliance10/6/201610/6/201610/6/2016PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Duane Seid
BLD-Framing/Rough-in10/5/201610/5/201610/5/2016PPASS
DetailsDave Hannah
Dwayne Phone #: ###-####
CHANGE STATUS TO (ISS)  10/5/2016 DONE
(F) Reprint permit  10/5/2016 DONE
OVERRIDE  10/4/2016  
Plan assigned to (JG)9/20/20169/20/201610/4/2016 PASS
DetailsJavier Guzman
1st review completed, Black Rock Coffee Shop Plan Mod
PLANS/APPL TAKEN TO FRONT DESK  10/4/2016 DONE
Permit Ready to Issue  10/4/2016 DONE
PLAN MOD DO NOT RE-ISSUE
Routing - Design Review10/1/2016 10/4/2016 PASS
DetailsJosh Wilson
Routing - PLUMBING10/1/2016 10/3/2016 PASS
DetailsBill VanDegrift
Routing PW Drainage10/3/2016 10/3/2016 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS10/3/2016 10/3/2016 PASS
DetailsRachael Beierle
New drainage plan. Sent to BGM for review.
Routing - PLAN CHECK9/30/2016 10/3/2016 PASS
DetailsJavier Guzman
BLD-Wall Bracing9/20/20169/20/20169/20/2016PPASS
DetailsJim Storey
Says it's not where the plan modification is being done// Dwayne Phone #: ###-#### walls and rood ok
Plan assigned to (AJS)  9/20/2016 DEFR
DetailsAdele J Schaffeld-Griffin
project not assigned to me this is a re submittal
Plan Modification Accepted  9/16/2016 DONE
BLD-Footing8/26/20168/26/20168/26/2016PPASS
DetailsJim Storey
Duane Phone #: ###-####
OVERRIDE  8/24/2016  
Plan assigned to (JG)7/20/20167/20/20168/24/2016 PASS
DetailsJavier Guzman
1st review completed, 8/16 L3 Black Rock Coffee Shop New Building, ePlan
Issue PAID IN FULL permit  8/24/2016 DONE
Print Occupancy Form  8/24/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/24/2016 DONE
Permit Ready to Issue  8/24/2016 DONE
***all requirments met 8-24-16 /CEV

need rev cert of val
Routing - Design Review8/18/2016 8/23/2016 PASS
DetailsJosh Wilson
Ok per revised drawings on file with DRH16-00240
Routing - FIRE8/18/20168/18/20168/19/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing - PLAN CHECK8/18/2016 8/19/2016 PASS
DetailsJavier Guzman
Routing - MECHANICAL8/18/2016 8/19/2016 PASS
DetailsTroy James
Route to Impact Fee Review8/5/20168/8/20168/11/2016 PASS
DetailsCindy M. Gould
1st review completed  8/5/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK7/20/2016 8/5/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL7/20/2016 8/3/2016 PASS
DetailsJavier Guzman
signed off in ePlan by Chris Holiday of AHJ Engineers
Routing PW Sewer Design7/20/2016 8/3/2016 PASS
DetailsMike Sheppard
signed off in ePlan by Mike Sheppard of public works design in ePlan
Routing PW Solid Waste7/20/2016 7/27/2016 PASS
DetailsPeter J. McCullough
Routing - MECHANICAL7/20/2016 7/27/2016 FAIL
DetailsTroy James
Routing - Design Review7/20/2016 7/22/2016 FAIL
DetailsJosh Wilson
Submit approval from South Boise Water Company for work within their easement along Broadway Avenue.
Routing - PLANNING Land Div7/20/2016 7/22/2016 PASS
DetailsTodd Tucker
Routing - FIRE7/20/20167/20/20167/21/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Environmental7/20/2016 7/21/2016 PASS
DetailsRick Christenson
Routing - Erosion and Sediment7/20/2016 7/21/2016 PASS
DetailsEvan Jenkins
1352 s.f. single store commercial building.
Routing - PLUMBING7/20/2016 7/21/2016 PASS
DetailsBill VanDegrift
1) asse 1070 mixing valve at public lavs
2) Increase venting to 3" see redlines on P201
Routing - PLANNING7/20/2016 7/21/2016 PASS
DetailsDavid Moser
CUP15-00100
Routing PW Street Lights7/20/2016 7/21/2016 PASS
DetailsTom Marshall
Routing PW Drainage7/20/2016 7/20/2016 PASS
DetailsBrian Murphy
Intake Approval  7/20/2016 PASS
DetailsAdele J Schaffeld-Griffin
Javier approved pre screen
Routing - Addressing7/20/2016 7/20/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS7/20/2016 7/20/2016 PASS
DetailsRachael Beierle
Intake Approval  7/19/2016 FAIL
DetailsJavier Guzman
Please upload additional documents. (Incomplete submittals will not be accepted.):
1. Central District Health Department (CDHD) completed Food Establishment License application and Food Establishment Plan Review and Approval form for any building where food is prepared, manufactured or stored. Form is available at: www.cdhd.idaho.gov/EH/food/forms.htm.
2. Form #310 – Statement of Special Inspections must be completely filled out by the design engineer (stamped/signed/dated by an Idaho licensed engineer)
3. A stamped and signed by Idaho licensed design professional Drainage System Operation & Maintenance Plan
4. Planning & Zoning letter(s) of approval – i.e. Conditional Use Permit (CUP), Design Review Permit (DRH) and/or other approval
5. Show Portable fire extinguisher location on floor plan
Application received  7/18/2016 DONE
Application submitted via PDS Online on Jul 18 2016 12:43PM