Information based on query as of Saturday, June 22, 2024.
Permit Information
Permit NumberBLD16-02625
StatusFinaled
Name IPSEN PARRY M
Site Address 1932 W SUNRISE RIM RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for garage and living space addition to main level of existing dwelling with finished basement. The total garage area will be 840 sq. ft. and include 55 sq. ft. unconditioned storage room. The existing concrete porch will be demolished to create 660 sq. ft. master bed/bathroom and mud room addition. Scope of work also includes new 368 sq. ft. deck. Separate erosion, electrical, plumbing and mechanical permits are required. All work is to be done according to approved plans, engineering, Plan Review Report and current local codes.//leg ***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/12/20186/13/20186/13/2018APASS
DetailsJim Storey
Hi Jim,
Please call, ###-####, 15 minutes prior to arriving on-site.
Thanks,
Parry
Phone #: ###-#### Inspection requested via web by Parry Ipsen
DOC - Permit Finaled6/13/20186/13/20186/13/2018PPASS
DetailsJim Storey
BLD-Final5/7/20185/8/20185/8/2018ANR
DetailsJim Storey
Please call 15 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Parry Ipsen pending hvac
BLD-Aging Inspection4/25/20184/25/20184/25/2018 PASS
DetailsJim Storey
wip
BLD-Aging Inspection12/7/201712/7/201712/12/2017 PASS
DetailsJim Storey
work in progress
BLD-Aging Inspection12/6/201712/6/201712/12/2017 PASS
DetailsJim Storey
work in progress
BLD-Wall cover7/24/20177/25/20177/25/2017APASS
DetailsJim Storey
Please call ###-#### 20 minutes prior to arrival at site. Phone #: ###-#### Inspection requested via web by Parry Ipsen
BLD-Conference7/14/20177/17/20177/17/2017APASS
DetailsJim Storey
Please call ###-#### 20 minutes prior to arrival, Phone #: ###-#### Inspection requested via web by Parry Ipsen
BLD-Framing/Rough-in5/23/20175/23/20175/23/2017PNR
DetailsJim Storey
Parry Phone #: ###-####-please call 15 minutes prior to meet for access
BLD-Aging Inspection3/16/20173/16/20173/22/2017 PASS
DetailsJim Storey
BLD-Conference3/13/20173/14/20173/14/2017APASS
DetailsJim Storey
Parry Phone #: ###-####
BLD-Foundation11/1/201611/1/201611/1/2016PPASS
DetailsJim Storey
Rebar // Dave Phone #: ###-####
BLD-Footing10/20/201610/20/201610/20/2016PPASS
DetailsJim Storey
BLD-Footing10/19/201610/20/201610/20/2016APART
DetailsJim Storey
Dave Phone #: ###-#### pending pw piror to ft placement
PubWorks Subgrade Approval10/20/201610/20/201610/20/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####
BLD-Foundation10/6/201610/7/201610/7/2016ANR
DetailsPhil Shearer
Available after 10AM - Parry Phone #: ###-####
OVERRIDE  8/24/2016  
Issue PAID IN FULL permit  8/24/2016 DONE
Plan assigned to (LEG) Tisha8/19/2016 8/24/2016 DONE
DetailsTisha Gallop
1st review 8/22 (walk-in).... need sheet A6.0
Plan resubmittals received  8/24/2016 DONE
received one copy of sheet A6.0- set customer to station 2 per Tisha
Routing - PLAN CHECK8/24/2016 8/24/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  8/24/2016 DONE
Permit Ready to Issue  8/24/2016 DONE
Inspection Record Card- Bld  8/22/2016 DONE
Routing - PLAN CHECK  8/22/2016 FAIL
DetailsTisha Gallop
need second full size copy of Sheet A6.0
Routing - Erosion and Sediment8/19/2016 8/22/2016 PASS
DetailsEvan Jenkins
Permit for garage addition, addition onto rear of dwelling, and new deck.***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade
Routing Walk-In (BLD)8/19/20168/19/20168/19/2016PCANC
DetailsTisha Gallop
took in as level 2; routed to erosion
Routing Walk-In (PW Hillside)7/18/20167/18/20167/18/2016PDONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Routing Walk-In (Zoning)7/18/20167/18/20167/18/2016PPASS
DetailsJeff Lowe
Routing Walk-In (BLD)7/18/20167/18/20167/18/2016PFAIL
DetailsTisha Gallop
need engineering stamped foundation plans and calculations for hillside, need foundation (engineered) and framing details for patio, need ESC waiver request letter
1st review completed  7/18/2016 FAIL
Application received 7/18/2016