BLD-Final | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
Kyle Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2017 | 8/22/2017 | 8/22/2017 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval | 8/21/2017 | 8/21/2017 | 8/21/2017 | | PASS |
Ted Vanegas
|
|
|
|
BLD-Final | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PEND |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### needs zoning final
|
BLD-Conference | 4/24/2017 | 4/24/2017 | 4/24/2017 | P | DONE |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
OVERRIDE | | | 4/18/2017 | | |
|
|
|
|
Routing Walk-In (Zoning) | 4/18/2017 | 4/18/2017 | 4/18/2017 | A | PASS |
Ted Vanegas
|
|
|
|
Routing Walk-In (BLD) | 4/18/2017 | 4/18/2017 | 4/18/2017 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 4/18/2017 | | 4/18/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2017 | | DONE |
Brian McGowan
|
|
|
|
(F) Reprint permit | | | 4/18/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 4/18/2017 | | DONE |
|
|
|
Plan mod ONLY - DO NOT RE-ISSUE
|
CHANGE STATUS TO (ISS) | | | 4/18/2017 | | DONE |
|
|
|
plan mod ONLY
|
Plan Modification Accepted | | | 1/13/2017 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/13/2017 | | 1/13/2017 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Energy code compliance | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Jim Sly
|
|
|
Kelly Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2016 | 12/9/2016 | 12/12/2016 | P | NR |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Wall Bracing | 10/19/2016 | 10/19/2016 | 10/20/2016 | P | PASS |
Dave Hannah
|
|
|
Shear // Kelly Phone #: ###-####
|
Routing - MECHANICAL | 10/20/2016 | | 10/20/2016 | | PASS |
Troy James
|
|
|
manual j report
|
BLD-Foundation | 9/19/2016 | 9/20/2016 | 9/21/2016 | A | PASS |
Dave Hannah
|
|
|
Requests 11AM, pouring at 1 - Dave Phone #: ###-####
|
BLD-Foundation | 9/16/2016 | 9/19/2016 | 9/19/2016 | A | CANC |
Dave Hannah
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 9/19/2016 | 9/19/2016 | 9/19/2016 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 9/12/2016 | 9/12/2016 | 9/13/2016 | P | PEND |
Dave Hannah
|
|
|
would like call ahead; Kelly Phone #: ###-####
|
Routing Walk-In (BLD) | 9/13/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Tisha Gallop
|
|
|
plan mod to add 60 sqft to master bedroom, move master closet and extend master bathroom
|
Routing Walk-In (Zoning) | 9/13/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Ted Vanegas
|
|
|
added 60 sq. ft to rear of building
|
OVERRIDE | | | 8/5/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PASS |
Tisha Gallop
|
|
|
plan mod to include remodel and addtion
|
Inspection Record Card- Bld | | | 8/5/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 8/5/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/5/2016 | | DONE |
|
|
|
plan mod only fees due
|
CHANGE STATUS TO (ISS) | | | 8/5/2016 | | DONE |
|
|
|
plan mod fees paid
|
BLD-Foundation | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Phil Shearer
|
|
|
Kelly Phone #: ###-####
|
BLD-Footing | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PART |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### first three sections
|
OVERRIDE | | | 7/18/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Tisha Gallop
|
|
|
phase I for foundation repair only
|
Plan assigned to (LEG) Tisha | 7/18/2016 | | 7/18/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/18/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/18/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/18/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 7/18/2016 | | DONE |
|
|
|
|
Application received | | 7/18/2016 | | | |
|
|
|
|