BLD-Final | 3/23/2017 | 3/24/2017 | 3/24/2017 | A | PASS |
Mike Jordan
|
|
|
Clint Phone #: ###-####-please call 30 minutes prior to meet for access
|
DOC - Permit Finaled | 3/24/2017 | 3/24/2017 | 3/24/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 1/19/2017 | 1/19/2017 | 1/19/2017 | | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 9/6/2016 | 9/7/2016 | 9/7/2016 | P | PASS |
Mike Jordan
|
|
|
Dean-please call 30 minutes prior to meet Phone #: ###-####
|
BLD-Energy code compliance | 9/6/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Mike Jordan
|
|
|
Dean-insulation/foam for ele Phone #: ###-####-please call 30 m inutes prior to meet
|
BLD-Framing/Rough-in | 9/7/2016 | 9/7/2016 | 9/7/2016 | A | PASS |
Mike Jordan
|
|
|
Dean-insulation/foam for ele Phone #: ###-####-please call 30 m inutes prior to meet
|
OVERRIDE | | | 9/7/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 9/6/2016 | 9/6/2016 | 9/7/2016 | | DONE |
Brian McGowan
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/7/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/7/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/7/2016 | | 9/7/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/7/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 9/7/2016 | | DONE |
|
|
|
called Dean to let know plan mod is ready and how much is owed
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
|
|
|
please do not re issue
|
BLD-Framing/Rough-in | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | FAIL |
Mike Jordan
|
|
|
Call 30 mins before // Dean Phone #: ###-####. Complete airseal pack. NAil off 2ply girder truss per the engineering. Needs to modify scope of work in permit: Show additional work in existing house (removal of exterior door, interior walls, construction of new interior walls) window replacement, new shingles on roof ans new exterior (stucco) A correction notice has been issued.
|
BLD-Foundation | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | CANC |
Mike Jordan
|
|
|
Call 30 mins before // Dean Phone #: ###-####
|
Plan Modification Accepted | | | 9/6/2016 | | DONE |
|
|
|
plan mod received 1 sheet of modifications - took to Brian McGowan
|
BLD-Framing/Rough-in | 8/26/2016 | 8/29/2016 | 8/30/2016 | P | NR |
Mike Jordan
|
|
|
Dean Phone #: ###-####
|
BLD-Other | 8/25/2016 | 8/26/2016 | 8/26/2016 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Dean Rooke
|
BLD-Wall Bracing | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | CANC |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Foundation | 7/21/2016 | 7/21/2016 | 7/21/2016 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####
|
BLD-Footing | 7/20/2016 | 7/20/2016 | 7/20/2016 | P | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####
|
OVERRIDE | | | 7/19/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 7/19/2016 | 7/19/2016 | 7/19/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/19/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/19/2016 | | 7/19/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/19/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/19/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Bruce Eggleston
|
|
|
Meets the setback and height requirements for the R-1A Zone.
|
Routing Walk-In (BLD) | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | CANC |
Tisha Gallop
|
|
|
no contact
|
Application received | | 7/18/2016 | | | |
|
|
|
|