BLD-Final | 9/20/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Dave Hannah
|
|
|
Donald Phone #: ###-####
|
DOC - Permit Finaled | 9/21/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/9/2017 | 8/9/2017 | 8/9/2017 | P | NH |
Brandon Shaw
|
|
|
Donald Phone #: ###-####
|
BLD-Final | 5/4/2017 | 5/5/2017 | 5/7/2017 | P | PEND |
Dave Hannah
|
|
|
would like call ahead; Don Phone #: ###-#### needs to fix handrails rough grade lot post address
|
BLD-Aging Inspection | 4/13/2017 | 4/13/2017 | 4/17/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/12/2017 | 4/12/2017 | 4/17/2017 | | PEND |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Dave Hannah
|
|
|
Don Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PART |
Dave Hannah
|
|
|
bob Phone #: ###-#### ok to cover north side insulation and framing ok
|
BLD-Framing/Rough-in | 11/10/2016 | 11/10/2016 | 11/14/2016 | P | PEND |
Dave Hannah
|
|
|
Donald Phone #: ###-#### needs mec
|
BLD-Framing/Rough-in | 11/4/2016 | 11/7/2016 | 11/8/2016 | A | PEND |
Dave Hannah
|
|
|
bob Phone #: ###-####needs mec rough in and air seal installed
|
BLD-Conference | 10/24/2016 | 10/25/2016 | 10/26/2016 | P | DONE |
Dave Hannah
|
|
|
Don Phone #: ###-####//please call ahead
|
BLD-Footing | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Dave Hannah
|
|
|
Jason Phone #: ###-####
|
BLD-Other | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PART |
Dave Hannah
|
|
|
2hr fire wall crawl spece and 1st floor ok
|
BLD-Foundation | 9/22/2016 | 9/23/2016 | 9/23/2016 | A | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### ok to cover floor on main level pony wall ok and fire wall in crawl space
|
BLD-Foundation | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
Dave Hannah
|
|
|
Don Phone #: ###-####
|
BLD-Footing | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PART |
Mike Jordan
|
|
|
Don Phone #: ###-####
|
BLD-Conference | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | DONE |
Mike Jordan
|
|
|
Don Phone #: ###-####-please call when 20 minutes prior to meet
|
Plan assigned to (BJM) | 8/9/2016 | 8/9/2016 | 8/18/2016 | | DONE |
Brian McGowan
|
|
|
Failed due to engineering
|
Routing - PLAN CHECK | 8/17/2016 | | 8/18/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/18/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/18/2016 | | DONE |
|
|
|
MET
|
Telephone call | | | 8/18/2016 | | DONE |
|
|
|
called Don to let know permit is ready and how much is owed
|
Issue PAID IN FULL permit | | | 8/18/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/18/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/17/2016 | | DONE |
|
|
|
received resubmittals for structural sheets
|
Routing - PLAN CHECK | 8/12/2016 | | 8/12/2016 | | FAIL |
Brian McGowan
|
|
|
Engineering does not match flor plan. Engineering is for a duplex, owner wants to build to Townhouse specifications.
|
Routing - MECHANICAL | 8/11/2016 | | 8/12/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 8/9/2016 | | DONE |
|
|
|
received (2) sets revised plans
|
Routing Walk-In (BLD) | 8/8/2016 | 8/8/2016 | 8/8/2016 | P | CANC |
Tisha Gallop
|
|
|
deferred to Brian
|
Routing Walk-In (BLD) | 8/1/2016 | 8/1/2016 | 8/1/2016 | P | FAIL |
Brian McGowan
|
|
|
**Plan modification 8-1-16 - Wants to try to build as townhouses again. Will need details and plans showing requirements as such. **
|
Routing Walk-In (BLD) | 7/28/2016 | 7/28/2016 | 7/28/2016 | P | FAIL |
Brian McGowan
|
|
|
Need additional drawings.
|
Routing Walk-In (BLD) | 7/25/2016 | 7/25/2016 | 7/28/2016 | P | DONE |
Candy A. Nichols
|
|
|
|
1st review completed | | | 7/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 7/25/2016 | 7/25/2016 | 7/25/2016 | P | PASS |
Bruce Eggleston
|
|
|
|
Application received | | | 7/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 18 2016 3:30PM
|
VOIDED CHANGE STATUS | | | 7/18/2016 | | DONE |
|
|
|
decided to pull permit online-see BLD16-02630
|
CHANGE STATUS TO (REV) | | | 7/18/2016 | | DONE |
|
|
|
voided wrong permit-see BLD16-02311
|