Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-02646
StatusFinaled
Name BILTMORE COMPANY
Site Address 1488 N ALLUMBAUGH ST
Project NameAberdeen #5
Customer Number 
ePlanReview 
Description
(ABERDEEN #5 - Bldg A-1) Permit to construct a new four plex multi-family building with each unit being 1,037 sq. ft.. All unit within this building are two story units with wood framed construction to be constructed per the approved plans and any notations. This building is on its own parcel. This building is to be fully fire sprinklered with an NFPA 13R system.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection4/6/20174/7/20174/7/2017APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final4/6/20174/7/20174/6/2017APASS
DetailsJim Sly
Pat Phone #: ###-####
FIRE-Final Inspection4/5/20174/6/20174/6/2017APASS
DetailsTroy Cobbley
Life safety passed.
PubWorks Occupancy Approval4/6/20174/6/20174/6/2017 DONE
DetailsJason C. Taylor
Recieved engineers approval letter for drainage improvements. JCT
Permanent Occupancy  4/6/2017 DONE
FIRE-Final Inspection4/4/20174/5/20174/5/2017AFAIL
DetailsTroy Cobbley
Need city approved drawings and small documents, needs address facing street, need riser room to be one hour rated, needs smoke alarms relocated to more than 3' from bathroom doors.
Zoning Approval4/3/20174/3/20174/3/2017 PASS
DetailsSarah Schafer
BLD-Wall Bracing2/2/20172/3/20172/3/2017APASS
DetailsMike Jordan
Sheet rock // Pat Phone #: ###-####
BLD-Energy code compliance1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Pat Phone #: ###-####
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017PPASS
DetailsMike Jordan
Pat Phone #: ###-####
BLD-Framing/Rough-in1/12/20171/12/20171/12/2017PFAIL
DetailsMike Jordan
Pat Phone #: ###-####. Fireblock all concealed areas at 1st. floor ceiling. Complete airseal, roll block all cantilevered floor joist, provide truss engineering, Box out the elctrical service panels with 2 layers of 5/8 type x rock. ok to insualte. Corection notice issued. ok to insulate.
BLD-Wall Bracing12/29/201612/30/201612/30/2016APASS
DetailsJim Sly
Pat Phone #: ###-####
BLD-Foundation10/5/201610/6/201610/6/2016PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing10/4/201610/5/201610/5/2016PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing10/3/201610/4/201610/4/2016PNR
DetailsMike Jordan
Dane Phone #: ###-####
Issue PAID IN FULL permit  10/3/2016 DONE
Print Occupancy Form  10/3/2016 DONE
Print Occupancy Form  10/3/2016 DONE
Plan assigned to (CDM)7/20/20167/20/20169/30/2016 PASS
DetailsCarl D Madsen
First review completed
Routing - MECHANICAL7/20/2016 9/30/2016 PASS
DetailsTroy James
sign off per e-plan
Routing - PLANNING Land Div7/20/2016 9/30/2016 PASS
DetailsCarl D Madsen
Signed off per e-plan
Routing - Erosion and Sediment7/20/2016 9/30/2016 PASS
DetailsEvan Jenkins
E-plan
Routing Off Site - STRUCTURAL9/30/2016 9/30/2016 PASS
DetailsCarl D Madsen
Routing - Design Review9/30/2016 9/30/2016 PASS
DetailsJosh Wilson
PLANS/APPL TAKEN TO FRONT DESK  9/30/2016 DONE
Permit Ready to Issue  9/30/2016 DONE
***all requirments met 10-4-16 /CEV

Needs; ACHD, RP, Revised Cert of Value & GC Form
Route to Impact Fee Review8/10/20168/13/20168/11/2016 PASS
DetailsCindy M. Gould
Routing Off Site - STRUCTURAL7/20/2016 8/10/2016 FAIL
DetailsCarl D Madsen
1st review completed  8/10/2016 FAIL
Routing - PLAN CHECK7/20/2016 8/10/2016 FAIL
DetailsCarl D Madsen
Routing - Design Review7/26/2016 7/27/2016 FAIL
DetailsJosh Wilson
Provide sidewalk conenctions to patios from Allumbaugh Street as required by DRH16-00031.
Routing - PLANNING7/20/2016 7/26/2016 PASS
DetailsSusan Riggs
Routing - FIRE7/20/20167/20/20167/25/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PLUMBING7/20/2016 7/25/2016 PASS
DetailsDaryl Spivey
per plans and ISPC
Routing - Addressing7/20/2016 7/21/2016 PASS
DetailsLaura Hunter
Added apartment numbers: 101-104
Routing - PUBLIC WORKS7/20/2016 7/21/2016 PASS
DetailsRachael Beierle
CONTACT WEST BOISE SEWER DISTRICT
Routing - PUBLIC WORKS GRADING7/21/2016 7/21/2016 PASS
DetailsBrian Murphy
CHECKED WITH C. P. SCOPE OF WORK MATCHES PREVIOUS APPROVAL WITH GRADING PERMIT
Intake Approval  7/20/2016 PASS
Pending Assignment by TLW7/20/2016 7/20/2016 DONE
DetailsTim L. Woodard
Application received  7/19/2016 DONE
Application submitted via PDS Online on Jul 19 2016 2:58PM
First Notice 4/16/2017