FIRE-Final Inspection | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 4/6/2017 | 4/7/2017 | 4/6/2017 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
FIRE-Final Inspection | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
PubWorks Occupancy Approval | 4/6/2017 | 4/6/2017 | 4/6/2017 | | DONE |
Jason C. Taylor
|
|
|
Recieved engineers approval letter for drainage improvements. JCT
|
Permanent Occupancy | | | 4/6/2017 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need city approved drawings and small documents, needs address facing street, need riser room to be one hour rated, needs smoke alarms relocated to more than 3' from bathroom doors.
|
Zoning Approval | 4/3/2017 | 4/3/2017 | 4/3/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Wall Bracing | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PASS |
Mike Jordan
|
|
|
Sheet rock // Pat Phone #: ###-####
|
BLD-Energy code compliance | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PASS |
Mike Jordan
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | FAIL |
Mike Jordan
|
|
|
Pat Phone #: ###-####. Fireblock all concealed areas at 1st. floor ceiling. Complete airseal, roll block all cantilevered floor joist, provide truss engineering, Box out the elctrical service panels with 2 layers of 5/8 type x rock. ok to insualte. Corection notice issued. ok to insulate.
|
BLD-Wall Bracing | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Foundation | 10/5/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 10/4/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/3/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/3/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 7/20/2016 | 7/20/2016 | 9/30/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - MECHANICAL | 7/20/2016 | | 9/30/2016 | | PASS |
Troy James
|
|
|
sign off per e-plan
|
Routing - PLANNING Land Div | 7/20/2016 | | 9/30/2016 | | PASS |
Carl D Madsen
|
|
|
Signed off per e-plan
|
Routing - Erosion and Sediment | 7/20/2016 | | 9/30/2016 | | PASS |
Evan Jenkins
|
|
|
E-plan
|
Routing Off Site - STRUCTURAL | 9/30/2016 | | 9/30/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Design Review | 9/30/2016 | | 9/30/2016 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2016 | | DONE |
|
|
|
***all requirments met 10-4-16 /CEV
Needs; ACHD, RP, Revised Cert of Value & GC Form
|
Route to Impact Fee Review | 8/10/2016 | 8/13/2016 | 8/11/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing Off Site - STRUCTURAL | 7/20/2016 | | 8/10/2016 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/10/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/20/2016 | | 8/10/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 7/26/2016 | | 7/27/2016 | | FAIL |
Josh Wilson
|
|
|
Provide sidewalk conenctions to patios from Allumbaugh Street as required by DRH16-00031.
|
Routing - PLANNING | 7/20/2016 | | 7/26/2016 | | PASS |
Susan Riggs
|
|
|
|
Routing - FIRE | 7/20/2016 | 7/20/2016 | 7/25/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 7/20/2016 | | 7/25/2016 | | PASS |
Daryl Spivey
|
|
|
per plans and ISPC
|
Routing - Addressing | 7/20/2016 | | 7/21/2016 | | PASS |
Laura Hunter
|
|
|
Added apartment numbers: 101-104
|
Routing - PUBLIC WORKS | 7/20/2016 | | 7/21/2016 | | PASS |
Rachael Beierle
|
|
|
CONTACT WEST BOISE SEWER DISTRICT
|
Routing - PUBLIC WORKS GRADING | 7/21/2016 | | 7/21/2016 | | PASS |
Brian Murphy
|
|
|
CHECKED WITH C. P. SCOPE OF WORK MATCHES PREVIOUS APPROVAL WITH GRADING PERMIT
|
Intake Approval | | | 7/20/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 7/20/2016 | | 7/20/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 7/19/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 19 2016 2:58PM
|
First Notice | | 4/16/2017 | | | |
|
|
|
|