Permit Information
Permit NumberBLD16-02674
StatusFinaled
Name MARCUM HOMES LLC
Site Address 3345 E PARSNIP PEAK DR
Project Name 
Customer Number 
ePlanReviewNo
Description
**Plan mod 10/10/16 to remove the portal frame and change some headers located at the rear of the home. DAF** WUI Zone B, a class "A" roof covering is required. Permit for the construction of a new 2099 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 254 sq. ft. of covered patio/porch and a 809 sq. ft. attached garage per the approved plans, and any notations. C-4D/DA zoning and setbacks per planning. **DAF** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201612/16/201612/16/2016APASS
DetailsPhil Shearer
Dirk// please call for access Phone #: ###-####
DOC - Permit Finaled12/16/201612/16/201612/16/2016PPASS
DetailsPhil Shearer
(F) Reprint permit  12/2/2016 DONE
CHANGE STATUS TO (ISS)  12/2/2016 DONE
Plan Mod
Telephone call  11/16/2016 DONE
called Marcum to let know they still need to pick up the plan mod and pay the fees-he said he'd be in today or tomorrow for that
BLD-Energy code compliance10/6/201610/7/201610/10/2016APASS
DetailsPhil Shearer
Dirk Phone #: ###-####
BLD-Framing/Rough-in10/10/201610/10/201610/10/2016PPASS
DetailsPhil Shearer
Dirk Phone #: ###-####
OVERRIDE  10/10/2016  
Plan assigned to (DAF)10/7/201610/7/201610/10/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK10/10/2016 10/10/2016 PASS
DetailsDavid Ferguson
Case Summary (BLD)  10/10/2016 DONE
DetailsDavid Ferguson
PLANS/APPL TAKEN TO FRONT DESK  10/10/2016 DONE
Permit Ready to Issue  10/10/2016 DONE
plan mod fee ONLY - DO NOT RE-ISSUE
Case Summary (BLD)  10/10/2016 DONE
Plan Modification Accepted  10/7/2016 DONE
DetailsChristina Prado
Received two sets of revised roof framing plan, taken to Dave for review
BLD-Framing/Rough-in10/3/201610/4/201610/4/2016PPART
DetailsPhil Shearer
Dirk Phone #: ###-####. Portal frame headers in great room and door to patio need to be
(2) 2x12 as per plan. OK to insulate
BLD-Wall Bracing9/20/20169/21/20169/21/2016PPART
DetailsPhil Shearer
Derick Phone #: ###-####. Missing hold downs. OK to wrap
PubWorks Subgrade Approval8/17/20168/17/20168/17/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Foundation8/15/20168/16/20168/16/2016PPASS
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Foundation8/12/20168/15/20168/15/2016PPASS
DetailsPhil Shearer
Dane Phone #: ###-####
BLD-Footing8/11/20168/12/20168/12/2016PPASS
DetailsDave Hannah
Jerry Phone #: ###-####
Issue PAID IN FULL permit  8/8/2016 DONE
Telephone call  8/5/2016 DONE
notified applicant that permit is ready to be issued
OVERRIDE  8/4/2016  
Plan assigned to (DAF)7/27/20167/27/20168/4/2016 DONE
DetailsDavid Ferguson
due 8/3 - Plan Review Complete - Need Jason T. approval
Routing PW Grading-Hillside8/3/2016 8/4/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
PLANS/APPL TAKEN TO FRONT DESK  8/4/2016  
Permit Ready to Issue  8/4/2016 DONE
All Met
Inspection Record Card- Bld  8/4/2016 DONE
1st review completed  8/3/2016 DONE
DetailsDavid Ferguson
Routing - PLAN CHECK7/27/2016 8/3/2016 PASS
DetailsDavid Ferguson
needs rebar in footing per subdivision geotech report for Antelope Springs
Routing - MECHANICAL7/22/2016 7/27/2016 PASS
DetailsTroy James
Plan assigned to (LEG) Tisha7/21/2016 7/27/2016 DEFR
DetailsTisha Gallop
Routing - PLANNING7/22/2016 7/22/2016 PASS
DetailsSue Cummings
Routing - Addressing7/21/2016 7/22/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS7/21/2016 7/22/2016 PASS
DetailsBeverly Mountain
Plans ACCEPTED BY PLAN TECH  7/21/2016 DONE
Intake Approval  7/21/2016 PASS
Recd Pcfee & Taken To Pln CK  7/21/2016 DONE
Application received 7/21/2016