BLD-Final | 2/23/2017 | 2/24/2017 | 2/23/2017 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote
|
PubWorks Occupancy Approval | 2/22/2017 | 2/22/2017 | 2/22/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | NR |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote Need Public Works Final.
|
BLD-Energy code compliance | 11/30/2016 | 12/1/2016 | 12/1/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote
|
Plan Modification Accepted | | | 11/28/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/28/2016 | | 11/28/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Marc Foote
|
BLD-Wall Bracing | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Dave Hannah
|
|
|
Jared Phone #: ###-####
|
BLD-Footing | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Dave Hannah
|
|
|
Jared Phone #: ###-####
|
PubWorks Subgrade Approval | 10/7/2016 | 10/7/2016 | 10/7/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/6/2016 | 10/6/2016 | 10/6/2016 | P | NR |
Dave Hannah
|
|
|
Jarod Phone #: ###-#### needs geo tec signoff and check grade ftg is high
|
Issue PAID IN FULL permit | | | 10/4/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/28/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/3/2016 | 8/3/2016 | 9/28/2016 | | DONE |
Brian McGowan
|
|
|
Due 8-19 ePlan Level 2
Fail - Must show WUI requirements on plans.
Top of foundation and top of footing must be specified on foundation plan
|
Routing PW Grading-Hillside | 9/28/2016 | | 9/28/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 9/28/2016 | | 9/28/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/28/2016 | | DONE |
|
|
|
MET
|
Routing PW Grading-Hillside | 9/19/2016 | | 9/19/2016 | | FAIL |
Jason C. Taylor
|
|
|
see notes from 8/18/2016. 3rd time. JCT
|
Routing - PLAN CHECK | 9/19/2016 | | 9/19/2016 | | FAIL |
Brian McGowan
|
|
|
Hillside requirements need to be met.
|
Routing PW Grading-Hillside | 9/7/2016 | | 9/7/2016 | | FAIL |
Jason C. Taylor
|
|
|
See notes on 8/18/2016. JCT
|
Routing - MECHANICAL | 9/7/2016 | | 9/7/2016 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 9/1/2016 | | 9/1/2016 | | FAIL |
Troy James
|
|
|
talked to contractor to provide revised report to show 3 ton condenser.
|
Routing - PLAN CHECK | 8/31/2016 | | 8/31/2016 | | FAIL |
Brian McGowan
|
|
|
Must show WUI requirements on plans. Waiting for Hillside and Mechanical to review so I can fail in ePlan
|
Routing - PLAN CHECK | 8/19/2016 | | 8/31/2016 | | FAIL |
Brian McGowan
|
|
|
Must show WUI requirements on plans.
Top of foundation and top of footing must be specified on foundation plan
|
1st review completed | | | 8/19/2016 | | FAIL |
Brian McGowan
|
|
|
Must show WUI requirements on plans.
Top of foundation and top of footing must be specified on foundation plan
|
Routing PW Grading-Hillside | 8/2/2016 | | 8/18/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need stamped geotechnical report uploaded to ePlan. JCT
|
Routing - FIRE | 8/2/2016 | 8/2/2016 | 8/3/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access and hydrant proximity.
|
Plan assigned to (LEG) Tisha | 8/2/2016 | | 8/3/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 8/2/2016 | | 8/3/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2704 sq. ft., two story (first story 1264 sq. ft., second story 1440 sq. ft.) single family dwelling with 5 bedrooms, 3 bathrooms, approximately 136 sq. ft. of covered patio/porch and a 810 sq. ft. attached garage per the approved plans
|
Routing - MECHANICAL | 8/2/2016 | | 8/3/2016 | | FAIL |
Troy James
|
|
|
emailed correction to designer
|
Routing - PLANNING | 8/2/2016 | | 8/3/2016 | | PASS |
Jeff Lowe
|
|
|
|
Routing - Addressing | 8/2/2016 | | 8/2/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/2/2016 | | 8/2/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/2/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2016 | | DONE |
|
|
|
|
Intake Approval | | | 7/27/2016 | | FAIL |
|
|
|
Documents Missing: Structural Calculation, Rescheck, ESC Narrative and Soils & Geotech Report
|
Application received | | | 7/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 22 2016 10:55AM
|