Permit NumberBLD16-02694
StatusFinaled
Name CBH HOMES
Site Address 2598 S SUMPTER PL
Project Name16-2 Peppermill
Customer Number 
ePlanReviewYes
Description
Floodplain; Permit for the construction of a new 2351 sq. ft., one story single family dwelling with 4 bedrooms, 2 bathrooms, approximately 260 sq. ft. of covered patio/porch and a 1030 sq. ft. attached garage per the approved plans, ACCA report and any notations. R-1A zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/8/20172/8/20172/8/2017PPASS
DetailsMike Jordan
Brett Phone #: ###-####
DOC - Permit Finaled2/8/20172/8/20172/8/2017PPASS
DetailsMike Jordan
Elevation Cert Rec'd-Final  2/8/2017 DONE
Final elevation certificate recieved. Jason Taylor ###-####
BLD-Energy code compliance12/14/201612/15/201612/15/2016PPASS
DetailsMike Jordan
Insulation // Joel Phone #: ###-####
BLD-Framing/Rough-in12/14/201612/15/201612/15/2016APASS
DetailsMike Jordan
Joel Phone #: ###-####
BLD-Framing/Rough-in12/13/201612/14/201612/14/2016ACANC
DetailsMike Jordan
joel Phone #: ###-####
BLD-Conference12/14/201612/14/201612/14/2016ADONE
DetailsMike Jordan
joel Phone #: ###-####
BLD-Framing/Rough-in12/12/201612/13/201612/13/2016AFAIL
DetailsMike Jordan
joel Phone #: ###-####. Complete lateral bracing on G3 truss. Provide continous bearingon G6 truss as shown on the truss engineering. Complete the fullheight blocking at B1,B2 and B3 areas as shown on the engineering. Install all straps on drag trusses as shown on engineering. Fasten gable to shear wall as shown on engineering. Correction notice posted. Ok to insulate.
Override - Condition Holds12/13/20161/1/190012/13/2016  
frame
BLD-Framing/Rough-in12/12/201612/12/201612/12/2016PFAIL
DetailsMike Jordan
joel Phone #: ###-####. Provide the truss enginnering and the additional enginnering. Ok to insulate. Correction notice posted.
Override - Condition Holds12/12/20161/1/190012/12/2016  
frame
Override - Condition Holds12/12/20161/1/190012/12/2016  
frame
Elevation Cert Rec'd-Midconst  12/5/2016 DONE
Received Elevation Certificate for "Building Under Construction". Okay to schedule a framing inspection.

Jim Wyllie / ###-####
BLD-Wall Bracing11/30/201612/1/201612/1/2016PPASS
DetailsMike Jordan
Brett Phone #: ###-####
Override - Condition Holds11/30/20161/1/190011/30/2016  
have not had frame yet
Plan Modification Accepted  11/29/2016 DONE
new manual j report
Routing - MECHANICAL11/29/2016 11/29/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Footing11/16/201611/16/201611/16/2016PPASS
DetailsMike Jordan
slab on grade, interior footing - Joel Phone #: ###-####
Override - Condition Holds11/16/20161/1/190011/16/2016  
footing only
BLD-Foundation11/4/201611/7/201611/7/2016PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing11/3/201611/4/201611/4/2016PPART
DetailsMike Jordan
Dane Phone #: ###-####
Override - Condition Holds11/3/20161/1/190011/3/2016  
not the frame
PLANS/APPL TAKEN TO FRONT DESK  9/26/2016 DONE
plan modification, no fee due
CHANGE STATUS TO (ISS)  9/26/2016 DONE
Plan assigned to (LEG) Tisha9/22/2016 9/26/2016 PASS
DetailsTisha Gallop
Routing - PLAN CHECK9/22/2016 9/26/2016 PASS
DetailsTisha Gallop
plan modification to change girder point loads and add interior thickened slab footing for interior bearing wall
OVERRIDE  9/23/2016  
Override - Condition Holds  9/23/2016  
Issue PAID IN FULL permit  9/23/2016 DONE
Override - Condition Holds  9/23/2016  
Permit Ready to Issue  9/23/2016 DONE
Plan Modification Accepted  9/22/2016 DONE
Modification to change from foundation to slab on grade construction
Override - Condition Holds  9/21/2016  
Issue PAID IN FULL permit  9/21/2016 DONE
Inspection Record Card- Bld  9/21/2016 DONE
CHANGE ISSUED DATE  9/21/2016  
permit issued twice in error
Elevation Cert Rec'd-Prelim  9/12/2016  
Elevation Cert Rec'd-Prelim  9/12/2016 PASS
OVERRIDE  9/9/2016  
Elevation Cert Rec'd-Prelim  9/9/2016 DONE
DetailsJim Wyllie
per Jim Wylie
Plan resubmittals received  9/9/2016 DONE
Routing - PLAN CHECK9/9/2016 9/9/2016 PASS
DetailsTisha Gallop
Routing PW Flood Plain9/9/2016 9/9/2016 PASS
DetailsJim Wyllie
per eplan
PLANS/APPL TAKEN TO FRONT DESK  9/9/2016 DONE
Override - Condition Holds  9/9/2016  
Permit Ready to Issue  9/9/2016 DONE
Needs additional Elevation Certificates submitted to Public Works Floodplain Coordinator prior to scheduling framing inspection and final occupancy requests. Per Tisha's hold in conditions
Plan assigned to (LEG) Tisha7/25/2016 9/9/2016 DONE
DetailsTisha Gallop
1st review 8/4; plan check, floodplain
Routing - PLAN CHECK7/25/2016 8/4/2016 FAIL
DetailsTisha Gallop
1st review completed  8/4/2016 DONE
pending approval by PW floodplain and Plan Check
Routing - MECHANICAL7/25/2016 7/29/2016 PASS
DetailsTroy James
Routing - PLANNING7/25/2016 7/26/2016 PASS
DetailsJeff Lowe
Routing - Addressing7/25/2016 7/26/2016 PASS
DetailsLaura Hunter
Routing PW Flood Plain7/26/2016 7/26/2016 FAIL
DetailsJim Wyllie
Elevation Certificate is required. Jim Wyllie / ###-####
Plans ACCEPTED BY PLAN TECH  7/25/2016 DONE
Intake Approval  7/25/2016 PASS
Recd Pcfee & Taken To Pln CK  7/25/2016 DONE
Routing - PUBLIC WORKS7/25/2016 7/25/2016 PASS
DetailsRachael Beierle
Application received  7/22/2016 DONE
Application submitted via PDS Online on Jul 22 2016 1:55PM