Permit Information
Permit NumberBLD16-02699
StatusFinaled
Name KOBALT CONSTRUCTION INC
Site Address 7333 W USTICK RD
Project NameMaverik - #198
Customer Number 
ePlanReviewYes
Description
(MAVERICK – STORE #198) Permit to remodel the existing 2,240 sq. ft. building by adding to the existing building 1,204 sq. ft. creating a building that is a total of 3,446 sq. ft., trash enclosure, trellis and fuel canopy and related site improvement work. Approval is contingent upon adhering to the approved plans on file. Scope of work includes: demolishing the select portion of existing building, removal of existing fuel canopy, construction of a slab on grade concrete foundation, construction of stud framed exterior envelope walls, new exterior finishes, roof construction, construction of interior non-bearing walls to create ADA Accessible restroom kitchen prep area, a new walk-in cooler, an office, an electrical room, and mercantile area, installation of new windows and accessible door/door frames, 1-Hour rated ceiling, new electrical, new mechanical, new plumbing and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 7/17/20177/17/2017 DONE
This permit finaled on the web by Annette Drown
Second Notice 6/23/20177/12/2017 DONE
Mailed 7-13-17
First Notice 5/12/20176/13/2017 DONE
sent in mail 6-14-17
BLD-Final5/2/20175/2/20175/2/2017PPASS
DetailsJim Sly
Jim Stewart Phone #: ###-####
OK for Perm Occ.
PubWorks Occupancy Approval5/2/20175/2/20175/2/2017 DONE
DetailsBrian Murphy
PubWorks Occupancy Approval5/2/20175/2/20175/2/2017 DONE
DetailsTiffany Lowery
Permanent Occupancy  5/2/2017 DONE
BLD-Final4/27/20174/28/20174/28/2017APART
DetailsJim Sly
Jim Phone #: ###-####
OK for Temp. Occ. OK for Perm Occ. when Public Works signs Perm.
FIRE-Final Inspection4/27/20174/28/20174/28/2017APASS
DetailsTroy Cobbley
life safety passed
BLD-Final4/25/20174/27/20174/28/2017ANR
DetailsJim Sly
Jim-as early as possible Phone #: ###-####
PubWorks Temp Occupancy Appr4/28/20174/28/20174/28/2017 DONE
DetailsTiffany Lowery
FIRE-Final Inspection4/27/20174/27/20174/27/2017PFAIL
DetailsTroy Cobbley
repair the two exit discharge lights at the main exit
Zoning Approval4/27/20174/27/20174/27/2017 DONE
DetailsAndrea Tuning
FIRE-Final Inspection4/25/20174/26/20174/26/2017PFAIL
DetailsTroy Cobbley
Provide small documents, provide fire dept approval of tanks and pumps, repair main exit discharge light and corridor emergency light, remove deadbolt from beer cooler, remove thumbturn deadbolt (keyed ok) from main exit and provide indicator and sticker, install address, test the emergency fuel shut offs
BLD-Other3/21/20173/22/20173/23/2017PPASS
DetailsJim Sly
Vapor Barrier - Jim Phone #: ###-####
Exterior Weatherproof Barrier.....OK
BLD-Wall Bracing3/15/20173/15/20173/15/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Energy code compliance3/15/20173/15/20173/15/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Framing/Rough-in3/15/20173/15/20173/15/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Framing/Rough-in3/13/20173/14/20173/14/2017APART
DetailsJim Sly
First thing, please for sheetrock - Jim Phone #: ###-####
2 layers Rock installed on ceiling above where cooler will be installed.
BLD-Wall Bracing3/3/20173/9/20173/8/2017PPART
DetailsJim Sly
Jim//shear wall nailing insp Phone #: ###-####
Interior.....West wall behind coolers....OK.
BLD-Energy code compliance3/3/20173/8/20173/7/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Framing/Rough-in3/3/20173/7/20173/7/2017PPART
DetailsJim Sly
Jim Phone #: ###-####
West wall ...OK to Insulate and install wood shear panels. If all trades approve.
BLD-Framing/Rough-in3/3/20173/6/20173/6/2017APART
DetailsJim Sly
Roof sheating//Jim would like first thing AM if possible Phone #: ###-####
BLD-Conference3/2/20173/2/20173/2/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Concrete2/16/20172/16/20172/16/2017APART
DetailsMike Jordan
As early as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Slab on Grade Floor
BLD-Foundation2/13/20172/14/20172/14/2017APART
DetailsJim Sly
As late as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Stewart
Trash Enclosure. OK pending STRATA special inspection, tests and approvals.
BLD-Framing/Rough-in2/10/20172/13/20172/13/2017APART
DetailsJim Sly
Jim-wants a partial on exterior walls Phone #: ###-####
OK to sheet......Need to see Exterior walls prior to cover (exterior).
BLD-Footing2/10/20172/13/20172/13/2017APART
DetailsJim Sly
Jim-footings and piers-late am if possible Phone #: ###-####
OK pending STRATA special inspection tests and approvals.
BLD-Foundation2/6/20172/7/20172/9/2017PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Foundation2/2/20172/3/20172/3/2017APART
DetailsJim Sly
would like at noon; Jim Phone #: ###-####
Foundation wall OK pending STRATA special inspection, tests and approval.
Issue PAID IN FULL permit  1/17/2017 DONE
Print Occupancy Form  1/17/2017 DONE
Telephone call  1/10/2017 DONE
Spoke with Matt about this permit expiring in 9 days. Told him that he can send a request for a 180 day extension or talk to Javier to see if an early start can be started. Transferred him to Javier
Expiration Notice12/29/20161/23/201712/29/2016 DONE
DetailsBrittany Hill
Telephone call  11/29/2016 DONE
customer called i told him we needed RP-GC-ACHD & rev cert of val before we can issue the permit
OVERRIDE  10/27/2016  
Plan assigned to (JG)8/9/20168/9/201610/27/2016 PASS
DetailsJavier Guzman
1st review completed, 9/02 L3 15124-Maverik Boise 198 ePlan
Routing - PLAN CHECK10/27/2016 10/27/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/27/2016 DONE
Permit Ready to Issue  10/27/2016 DONE
***all requirments met 1-17-17 /CEV***

*** ONLY NEED ACHD as of 1/10/17 BLH***NEED ACHD, RP, GC & Rev Cert of Val
Routing - PLAN CHECK10/14/2016 10/25/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/14/2016 10/21/2016 PASS
DetailsJavier Guzman
Passed in ePlan by AHJ Engineer Chris Holladay
Routing - MECHANICAL10/14/2016 10/14/2016 PASS
DetailsTroy James
Routing Off Site - STRUCTURAL9/21/2016 10/4/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineer Chris Holladay
Routing PW Drainage9/21/2016 10/3/2016 PASS
DetailsBrian Murphy
Routing - PLAN CHECK9/21/2016 9/24/2016 FAIL
DetailsJavier Guzman
Routing - MECHANICAL9/21/2016 9/22/2016 FAIL
DetailsTroy James
Route to Impact Fee Review9/2/20169/5/20169/6/2016 PASS
DetailsCindy M. Gould
1st review completed  9/2/2016 DONE
DetailsJavier Guzman
Routing - PLAN CHECK8/9/2016 9/2/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/9/2016 8/31/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineer Chris Holladay
Routing PW Environmental8/10/2016 8/18/2016 PASS
DetailsRick Christenson
1500 Gallon Exterior Interceptor Shown.
Routing - PLANNING Land Div8/9/2016 8/18/2016 PASS
DetailsTodd Tucker
Routing PW Solid Waste8/10/2016 8/17/2016 PASS
DetailsPeter J. McCullough
Routing - Design Review8/9/2016 8/16/2016 PASS
DetailsJosh Wilson
OK per DR and CUP/CVA approvals
Routing - PLUMBING8/9/2016 8/15/2016 PASS
DetailsDaryl Spivey
Provide approved backflow devices on service and equipment. Install plumbing per ISPC.
Routing - FIRE8/9/20168/9/20168/10/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - MECHANICAL8/9/2016 8/10/2016 FAIL
DetailsTroy James
Routing - Addressing8/9/2016 8/10/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/9/2016 8/10/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment8/9/2016 8/10/2016 PASS
DetailsEvan Jenkins
New building and fuel canopy
Routing PW Street Lights8/10/2016 8/10/2016 PASS
DetailsTom Marshall
Routing PW Drainage8/10/2016 8/10/2016 FAIL
DetailsBrian Murphy
CANNOT CONECT TO ACHD NEEDAPDX J ECT
Plan Reviewer's activity  8/9/2016 PASS
Plan intake review approved
Intake Approval  8/9/2016 PASS
DetailsCarl Westfall
Plan Reviewer's activity  8/4/2016 DONE
DetailsAdele J Schaffeld-Griffin
emailed Callie copy of check list with mark ups after recieving email.
Intake Approval  7/29/2016 FAIL
(7-29-16) Please see the circled items in the Plan Intake Checklist. Resolve each item as noted. If you have questions call Carl J. Westfall at ###-####. If he is unavailable, call Adele Schaffeld-Griffin at ###-####.
Telephone call  7/29/2016 DONE
Explained what is required to approve the plan intake
Application received  7/22/2016 DONE
Application submitted via PDS Online on Jul 22 2016 3:48PM