Third Notice | | 7/17/2017 | 7/17/2017 | | DONE |
|
|
|
This permit finaled on the web by Annette Drown
|
Second Notice | | 6/23/2017 | 7/12/2017 | | DONE |
|
|
|
Mailed 7-13-17
|
First Notice | | 5/12/2017 | 6/13/2017 | | DONE |
|
|
|
sent in mail 6-14-17
|
BLD-Final | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Jim Sly
|
|
|
Jim Stewart Phone #: ###-#### OK for Perm Occ.
|
PubWorks Occupancy Approval | 5/2/2017 | 5/2/2017 | 5/2/2017 | | DONE |
Brian Murphy
|
|
|
|
PubWorks Occupancy Approval | 5/2/2017 | 5/2/2017 | 5/2/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 5/2/2017 | | DONE |
|
|
|
|
BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PART |
Jim Sly
|
|
|
Jim Phone #: ###-#### OK for Temp. Occ. OK for Perm Occ. when Public Works signs Perm.
|
FIRE-Final Inspection | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/25/2017 | 4/27/2017 | 4/28/2017 | A | NR |
Jim Sly
|
|
|
Jim-as early as possible Phone #: ###-####
|
PubWorks Temp Occupancy Appr | 4/28/2017 | 4/28/2017 | 4/28/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 4/27/2017 | 4/27/2017 | 4/27/2017 | P | FAIL |
Troy Cobbley
|
|
|
repair the two exit discharge lights at the main exit
|
Zoning Approval | 4/27/2017 | 4/27/2017 | 4/27/2017 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 4/25/2017 | 4/26/2017 | 4/26/2017 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, provide fire dept approval of tanks and pumps, repair main exit discharge light and corridor emergency light, remove deadbolt from beer cooler, remove thumbturn deadbolt (keyed ok) from main exit and provide indicator and sticker, install address, test the emergency fuel shut offs
|
BLD-Other | 3/21/2017 | 3/22/2017 | 3/23/2017 | P | PASS |
Jim Sly
|
|
|
Vapor Barrier - Jim Phone #: ###-#### Exterior Weatherproof Barrier.....OK
|
BLD-Wall Bracing | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Energy code compliance | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/15/2017 | 3/15/2017 | 3/15/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/13/2017 | 3/14/2017 | 3/14/2017 | A | PART |
Jim Sly
|
|
|
First thing, please for sheetrock - Jim Phone #: ###-#### 2 layers Rock installed on ceiling above where cooler will be installed.
|
BLD-Wall Bracing | 3/3/2017 | 3/9/2017 | 3/8/2017 | P | PART |
Jim Sly
|
|
|
Jim//shear wall nailing insp Phone #: ###-#### Interior.....West wall behind coolers....OK.
|
BLD-Energy code compliance | 3/3/2017 | 3/8/2017 | 3/7/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 3/3/2017 | 3/7/2017 | 3/7/2017 | P | PART |
Jim Sly
|
|
|
Jim Phone #: ###-#### West wall ...OK to Insulate and install wood shear panels. If all trades approve.
|
BLD-Framing/Rough-in | 3/3/2017 | 3/6/2017 | 3/6/2017 | A | PART |
Jim Sly
|
|
|
Roof sheating//Jim would like first thing AM if possible Phone #: ###-####
|
BLD-Conference | 3/2/2017 | 3/2/2017 | 3/2/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Concrete | 2/16/2017 | 2/16/2017 | 2/16/2017 | A | PART |
Mike Jordan
|
|
|
As early as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Slab on Grade Floor
|
BLD-Foundation | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PART |
Jim Sly
|
|
|
As late as possible Phone #: 8013674060 >> Inspection requested via mobile web by Jim Stewart Trash Enclosure. OK pending STRATA special inspection, tests and approvals.
|
BLD-Framing/Rough-in | 2/10/2017 | 2/13/2017 | 2/13/2017 | A | PART |
Jim Sly
|
|
|
Jim-wants a partial on exterior walls Phone #: ###-#### OK to sheet......Need to see Exterior walls prior to cover (exterior).
|
BLD-Footing | 2/10/2017 | 2/13/2017 | 2/13/2017 | A | PART |
Jim Sly
|
|
|
Jim-footings and piers-late am if possible Phone #: ###-#### OK pending STRATA special inspection tests and approvals.
|
BLD-Foundation | 2/6/2017 | 2/7/2017 | 2/9/2017 | P | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-####
|
BLD-Foundation | 2/2/2017 | 2/3/2017 | 2/3/2017 | A | PART |
Jim Sly
|
|
|
would like at noon; Jim Phone #: ###-#### Foundation wall OK pending STRATA special inspection, tests and approval.
|
Issue PAID IN FULL permit | | | 1/17/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/17/2017 | | DONE |
|
|
|
|
Telephone call | | | 1/10/2017 | | DONE |
|
|
|
Spoke with Matt about this permit expiring in 9 days. Told him that he can send a request for a 180 day extension or talk to Javier to see if an early start can be started. Transferred him to Javier
|
Expiration Notice | 12/29/2016 | 1/23/2017 | 12/29/2016 | | DONE |
Brittany Hill
|
|
|
|
Telephone call | | | 11/29/2016 | | DONE |
|
|
|
customer called i told him we needed RP-GC-ACHD & rev cert of val before we can issue the permit
|
OVERRIDE | | | 10/27/2016 | | |
|
|
|
|
Plan assigned to (JG) | 8/9/2016 | 8/9/2016 | 10/27/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/02 L3 15124-Maverik Boise 198 ePlan
|
Routing - PLAN CHECK | 10/27/2016 | | 10/27/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/27/2016 | | DONE |
|
|
|
***all requirments met 1-17-17 /CEV***
*** ONLY NEED ACHD as of 1/10/17 BLH***NEED ACHD, RP, GC & Rev Cert of Val
|
Routing - PLAN CHECK | 10/14/2016 | | 10/25/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 10/14/2016 | | 10/21/2016 | | PASS |
Javier Guzman
|
|
|
Passed in ePlan by AHJ Engineer Chris Holladay
|
Routing - MECHANICAL | 10/14/2016 | | 10/14/2016 | | PASS |
Troy James
|
|
|
|
Routing Off Site - STRUCTURAL | 9/21/2016 | | 10/4/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineer Chris Holladay
|
Routing PW Drainage | 9/21/2016 | | 10/3/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 9/21/2016 | | 9/24/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/21/2016 | | 9/22/2016 | | FAIL |
Troy James
|
|
|
|
Route to Impact Fee Review | 9/2/2016 | 9/5/2016 | 9/6/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 9/2/2016 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/9/2016 | | 9/2/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 8/9/2016 | | 8/31/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineer Chris Holladay
|
Routing PW Environmental | 8/10/2016 | | 8/18/2016 | | PASS |
Rick Christenson
|
|
|
1500 Gallon Exterior Interceptor Shown.
|
Routing - PLANNING Land Div | 8/9/2016 | | 8/18/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Solid Waste | 8/10/2016 | | 8/17/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Design Review | 8/9/2016 | | 8/16/2016 | | PASS |
Josh Wilson
|
|
|
OK per DR and CUP/CVA approvals
|
Routing - PLUMBING | 8/9/2016 | | 8/15/2016 | | PASS |
Daryl Spivey
|
|
|
Provide approved backflow devices on service and equipment. Install plumbing per ISPC.
|
Routing - FIRE | 8/9/2016 | 8/9/2016 | 8/10/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - MECHANICAL | 8/9/2016 | | 8/10/2016 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 8/9/2016 | | 8/10/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/9/2016 | | 8/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 8/9/2016 | | 8/10/2016 | | PASS |
Evan Jenkins
|
|
|
New building and fuel canopy
|
Routing PW Street Lights | 8/10/2016 | | 8/10/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 8/10/2016 | | 8/10/2016 | | FAIL |
Brian Murphy
|
|
|
CANNOT CONECT TO ACHD NEEDAPDX J ECT
|
Plan Reviewer's activity | | | 8/9/2016 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 8/9/2016 | | PASS |
Carl Westfall
|
|
|
|
Plan Reviewer's activity | | | 8/4/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
emailed Callie copy of check list with mark ups after recieving email.
|
Intake Approval | | | 7/29/2016 | | FAIL |
|
|
|
(7-29-16) Please see the circled items in the Plan Intake Checklist. Resolve each item as noted. If you have questions call Carl J. Westfall at ###-####. If he is unavailable, call Adele Schaffeld-Griffin at ###-####.
|
Telephone call | | | 7/29/2016 | | DONE |
|
|
|
Explained what is required to approve the plan intake
|
Application received | | | 7/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 22 2016 3:48PM
|