Third Notice | | 12/17/2016 | 12/16/2016 | | DONE |
|
|
|
This permit finaled on the web by Jeff Canning
|
Second Notice | | 11/25/2016 | 12/12/2016 | | DONE |
|
|
|
Mailed 12-13-16
|
First Notice | | 11/10/2016 | 11/15/2016 | | DONE |
|
|
|
Mailed 11-16-16
|
Permanent Occupancy | | | 10/31/2016 | | DONE |
|
|
|
|
BLD-Final | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Jim Storey
|
|
|
Greg Phone #: ###-#### final ok pending plm and health dept
|
FIRE-Final Inspection | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, no fire alarm modifications, fire extinguishers are in place with current inspection tags, fire sprinkler riser room was locked so I did not verify if fire sprinkler inspection tag is current. Final life fire safety inspection passed/complete.
|
FIRE-Final Inspection | 10/25/2016 | 10/26/2016 | 10/26/2016 | P | CANC |
Jim Page
|
|
|
Project not ready for final inspection, emergency egress lighting and exit signs are not installed, general contractor will reschedule life fire safety inspection to coincide with exit sign/egress lighting completion. This inspection request cancelled.
|
BLD-Other | 10/17/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Jim Storey
|
|
|
Greg-T bar grid Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Jim Storey
|
|
|
Graig Phone #: ###-####
|
BLD-Conference | 8/29/2016 | 8/30/2016 | 8/30/2016 | P | DONE |
Jim Storey
|
|
|
Greg Phone #: ###-####
|
Plan assigned to (JG) | 8/8/2016 | 8/8/2016 | 8/25/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/19 L2 Cold Stone Creamery ePlan
|
Routing - PLAN CHECK | 8/25/2016 | | 8/25/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2016 | | DONE |
Christina Prado
|
|
|
**All requirements met 8/25/16** /// Need GC Form & Revised Certificate of Value for issuance
|
Issue PAID IN FULL permit | | | 8/25/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/25/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/20/2016 | | 8/20/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/18/2016 | 8/18/2016 | 8/18/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
1st review completed | | | 8/18/2016 | | DONE |
Javier Guzman
|
|
|
|
Routing Off Site - C.D.H | 8/8/2016 | | 8/18/2016 | | PASS |
Javier Guzman
|
|
|
signed of in ePlan by Dinko Miljkovic of Central District Health
|
Routing PW Environmental | 8/8/2016 | | 8/18/2016 | | PASS |
Rick Christenson
|
|
|
Verified Grease Abatement will be installed.
|
Routing - PLAN CHECK | 8/8/2016 | | 8/18/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 8/8/2016 | | 8/9/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 8/8/2016 | | 8/9/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 8/8/2016 | | 8/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - Erosion and Sediment | 8/8/2016 | | 8/9/2016 | | PASS |
Andy J. Long
|
|
|
No ESC permit required; low risk interior remodel in existing space
|
Routing - PUBLIC WORKS | 8/8/2016 | | 8/8/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/8/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 7/27/2016 | | FAIL |
David Ferguson
|
|
|
Please have the 9 architectural sheets stamped, signed and dated by the architect and resubmit.
|
Application received | | | 7/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 25 2016 6:23PM
|