Third Notice | | 4/18/2017 | 4/18/2017 | | DONE |
|
|
|
This permit finaled on the web by Chris Collett
|
Third Notice | | 3/14/2017 | 4/13/2017 | | DONE |
Christina Prado
|
|
|
mailed 4/14
|
Second Notice | | 2/25/2017 | 3/9/2017 | | DONE |
|
|
|
Mailed 3-10-17
|
First Notice | | 1/13/2017 | 2/15/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/3/2017 | | DONE |
|
|
|
|
BLD-Final | 12/30/2016 | 12/30/2016 | 12/30/2016 | P | PASS |
Jim Sly
|
|
|
Larry Phone #: ###-####
|
FIRE-Final Inspection | 12/30/2016 | 12/30/2016 | 12/30/2016 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PART |
Troy Cobbley
|
|
|
Gate posts are in but gates have not been installed yet. Plans have been approved with the new fencing/gates. Will be ok to final when gate/width can be verified.
|
Routing - FIRE | 12/19/2016 | 12/19/2016 | 12/19/2016 | | PASS |
Katie Marron
|
|
|
Revised plan sheet received with in-field modifications to fencing and FD Access, per Field Inspectors request.
|
BLD-Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | P | PART |
Mike Jordan
|
|
|
Larry Phone #: ###-####. Ok for temp occ. Need final letter from special inspection agency.
|
FIRE-Final Inspection | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Troy Cobbley
|
|
|
A 30 day temporary is being given with Scott's permission until the as-builts showing the new fences and gates have approved, and the fences and gates installed/verified.
|
FIRE-Final Inspection | 12/14/2016 | 12/15/2016 | 12/15/2016 | P | FAIL |
Troy Cobbley
|
|
|
Provide as-builts to plan review showing the new fences and gates. The vehicle gate to be 20' min. clearance and the a new man gate to be provided at the west side fence. Provide fire dept access/fire lane signage at both property entrances as discussed. All other items ok. As per plan review the knox key at the west property entry and narrow width has been approved by the fire dept.
|
PubWorks Occupancy Approval | 12/15/2016 | 12/15/2016 | 12/15/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 12/15/2016 | 12/15/2016 | 12/15/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | DONE |
Katie Marron
|
|
|
Phone discussion with contractor on sequence of inspections in regards to knox box/switches being installed on all electric gates. Discussed that he should coordinate with fire department for key hand over/ops check. Fire department is not required at final life safety inspection.
|
(F) Reprint permit | | | 12/2/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/2/2016 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 11/9/2016 | | |
|
|
|
|
Plan assigned to (JG) | 10/31/2016 | 10/31/2016 | 11/9/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, Four S Corp Plan Mod
|
Routing - Design Review | 11/3/2016 | | 11/9/2016 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/9/2016 | | DONE |
|
|
|
All requirements met for PlanMod
NO NOT RE-ISSUE - Fees due, Change status to ISS once paid
|
FIRE-Conference | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | DONE |
Katie Marron
|
|
|
Discussed with architect on address number placement. Directed that if building numbers were not visible from the street than additional signage at the street/gate would be required.
|
BLD-Foundation | 11/3/2016 | 11/4/2016 | 11/4/2016 | P | PART |
Mike Jordan
|
|
|
As late as possible // Larry Phone #: ###-####. Work in progress. Will have special inspection.
|
FIRE-Conference | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | DONE |
Katie Marron
|
|
|
Survey miss measured front gate width it is 16' and not the agreed with 19'. Approved access is now from the drive to the south and around back. If front gate is electric it shall have a knox switch still, to provide options as needed. Inspector to verify access is marked/signed.
|
Plan Reviewer's activity | | | 11/3/2016 | | DONE |
Javier Guzman
|
|
|
Spoke with Brian Murphy and he said no rewview for the modification from him is required
|
Routing - PLAN CHECK | 11/2/2016 | | 11/3/2016 | | PASS |
Javier Guzman
|
|
|
|
Plan Modification Accepted | | | 10/31/2016 | | DONE |
|
|
|
change location of an overhead door
|
BLD-Foundation | 10/24/2016 | 10/25/2016 | 10/25/2016 | P | PART |
Mike Jordan
|
|
|
Wall pour is Wednesday 830am // Larry Phone #: ###-####. Work in progress, loading dock wall. Will have special inspection.
|
BLD-Footing | 10/18/2016 | 10/21/2016 | 10/21/2016 | A | PART |
Mike Jordan
|
|
|
pouring 11:30 - Larry Phone #: ###-####. Perimeter footings, work in progress. OK to place after special inspection has passed.
|
(F) Reprint permit | | | 10/11/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/11/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/10/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/10/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/7/2016 | | |
|
|
|
|
Plan assigned to (JG) | 8/5/2016 | 8/5/2016 | 10/7/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/01 L3 Four S Corp ePlan
|
Routing Off Site - STRUCTURAL | 9/30/2016 | | 10/7/2016 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Dave Haugland
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/7/2016 | | DONE |
|
|
|
All requirements met 10/7/16 C_P//// Needs; GC Form, Revised Cert of Value, RP
|
Routing - FIRE | 9/30/2016 | 9/30/2016 | 10/3/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing - PLAN CHECK | 9/30/2016 | | 10/3/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Drainage | 9/16/2016 | | 9/29/2016 | | PASS |
Brian Murphy
|
|
|
|
Meeting | | | 9/28/2016 | | DONE |
|
|
|
Took Appendix J to Brian Mu. Also in documents
|
Routing Off Site - STRUCTURAL | 9/16/2016 | | 9/22/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - FIRE | 9/16/2016 | 9/16/2016 | 9/20/2016 | | FAIL |
Katie Marron
|
|
|
Additional information required. Revised report attached to case and emailed to architect.
|
Routing - PLAN CHECK | 9/16/2016 | | 9/20/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - PUBLIC WORKS | 9/16/2016 | | 9/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 9/16/2016 | | 9/16/2016 | | PASS |
Todd Tucker
|
|
|
|
Route to Impact Fee Review | 8/29/2016 | 9/1/2016 | 9/1/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 8/29/2016 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/5/2016 | | 8/29/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 8/5/2016 | | 8/26/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Dave Haugland
|
Routing - PLANNING Land Div | 8/5/2016 | | 8/18/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Drainage | 8/5/2016 | | 8/15/2016 | | FAIL |
Brian Murphy
|
|
|
NEED APD J, NO FREE DRAINING NOTE ON SWALE DETAILPOND 7 FEET DEEP FENCESEPERATE D. R. AND O AND M
|
Routing - FIRE | 8/5/2016 | 8/5/2016 | 8/10/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Design Review | 8/5/2016 | | 8/10/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 8/5/2016 | | 8/9/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Valid plan designer, need to designate RP once contractor is selected
|
Routing - Addressing | 8/5/2016 | | 8/5/2016 | | PASS |
Laura Hunter
|
|
|
New building will have its own address: 2038 S Century Way
|
Routing - PUBLIC WORKS | 8/5/2016 | | 8/5/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/5/2016 | | PASS |
|
|
|
|
Pending Assignment by TLW | 8/5/2016 | | 8/5/2016 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 8/4/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pre screen was approved in e plan. However upon routing the structral drawings and calcs for the steel building are missing. email sent to applicant 8/4/16
To follow up on our conversation, please submit the stamped calculations and drawings for the steel building located at 2032 S Century Way, BLD16-02720. Please have the engineer for the building complete a 310 form for special inspections on the steel building.
Your plan review time frame will begin once these items are received.
Thank you
|
Application received | | | 7/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 26 2016 11:12AM
|