BLD-Final | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 7/31/2017 | 7/31/2017 | 8/2/2017 | | CANC |
Jim Sly
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/24/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/4/2016 | 8/4/2016 | 8/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Silo Bracing
|
Routing - PLAN CHECK | 8/4/2016 | | 8/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing Off Site - STRUCTURAL | 8/4/2016 | | 8/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 8/24/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/24/2016 | | DONE |
|
|
|
***MET 9-14-16 CAN***NEED RP, GC form, and Certificate of value
|
Routing - Erosion and Sediment | 8/4/2016 | | 8/8/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. RP to be designated. Boise Parks and Rec project with subcontractor
|
Routing - Design Review | 8/4/2016 | | 8/5/2016 | | PASS |
Ted Vanegas
|
|
|
|
Routing - FIRE | 8/4/2016 | 8/4/2016 | 8/4/2016 | | PASS |
Katie Marron
|
|
|
No comments required
|
Routing - Addressing | 8/4/2016 | | 8/4/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/4/2016 | | 8/4/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/4/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
pre screen approved by Javier
|
Intake Approval | | | 7/28/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following, (Incomplete submittals will not be accepted):
1. 520 - Major TI: Submittal Checklist, Checklist must be completed by the project’s Idaho-licensed design professional of record. Checklist can be found at our website at http://pds.cityofboise.org/home/documents/apps/500/
2. The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed. If any additional paperwork is requested from the checklist, please upload for prescreen review
3. Erosion & Sediment Control (ESC) Plan Waiver Request Letter, the waiver letter uploaded is blank
4. Form #310 – Statement of Special Inspections front page not filled out completely (missing inspection firm, owner information and signature). List of Approved Special Inspection Firms can be found at our website at http://pds.cityofboise.org/home/documents/apps/300/
|
Application received | | | 7/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2016 8:02AM
|