Second Notice | | 7/23/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
First Notice | | 6/16/2017 | 7/13/2017 | | DONE |
|
|
|
sent in mail 7-14-17 pdf
|
BLD-Final | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Mike Jordan
|
|
|
The 3hr. wall has been completed on adjacent tenant. ok for perm occ.
|
Permanent Occupancy | | | 6/6/2017 | | DONE |
|
|
|
|
BLD-Final | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PART |
Mike Jordan
|
|
|
Phil Phone #: ###-####. OK for temp occ. the work on the 2hr. fire walls is completed. All mill thicknesses verified by special inspection. The 3hr. wall is completed on the nerfed side. Will be ok for perm occ. once the remainder of the 3hr. wall is completed on the usful glassworks side. All other issues for this tenant have been resolved.
|
FIRE-Final Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Temporary Occupancy | 4/17/2017 | 7/16/2017 | 4/17/2017 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 4/17/2017 | | DONE |
|
|
|
|
Meeting | | | 4/17/2017 | | DONE |
|
|
|
as per Sarah Schafer no P & Z inspection required
|
Plan assigned to (AJS) | 4/4/2017 | 4/4/2017 | 4/14/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 4/5/2017 | | 4/14/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
changes for interior obsticales
|
Permit Ready to Issue | | | 4/14/2017 | | DONE |
|
|
|
PLEASE do not re issue
|
CHANGE STATUS TO (ISS) | | | 4/14/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/14/2017 | | DONE |
|
|
|
|
Routing - FIRE | 4/5/2017 | 4/5/2017 | 4/5/2017 | | PASS |
Katie Marron
|
|
|
Due to the nature of the occupant, foam/plastic equipment is expected. The IFC does not regulate this specific use of foam at this time. Storage and height of foam shall be regulated; See Decorative Finishes and Storage Requirements in the revised report.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/4/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to show updates to existing floor plan, sheet A1.0 will be replaced.
|
FIRE-Final Inspection | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | FAIL |
Troy Cobbley
|
|
|
I performed a courtesy inspection since no IFC review comments had been provided. The corrections I found apply to all three BLD permits which include BLD16-01070, BLD16-02734 and BLD16-02747. BLD16-02747 was actually still in review status due to a plan modification. Corrections I noted are, new double doors not installed, existing door infilled in Corridor 12, opening infilled in Birthday Room, doors not shown, hardware not allowing direction of egress travel, non-compliant ADA hardware in egress path, door in egress path non-functional, egress path corridor blocked with storage, permanant walls installed that are not shown on the plans that also block view of exit signs, cloth mesh blocking view of exit signs, issues of foam, rubber tire storage, plastic inflatables and plastic barrels (quantity and storage arrangement) in the NERF tenant and the issues of large amounts of foam (mats) in the Gymnastic tenant., also one fire extinguisher was missing and another was mounted too high.
|
Issue PAID IN FULL permit | | | 2/27/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/27/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/17/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/17/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/16/2017 | | DONE |
|
|
|
Left a message for Steve, with Karrie, recommending they send a request for a 180 day extension if they are not ready to pick the permit up. Stated that it looks like it took a bit to go through review and was just made ready yesterday.
|
Plan assigned to (AJS) | 10/3/2016 | 10/3/2016 | 2/15/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/15/2017 | | DONE |
|
|
|
ALL MET ***2/27/17 ACHD MET see docs CAN****** ONLY NEED ACHD as of 2-17-17 KRS***Need ACHD, GC Form and Revised Cert of Value
|
Routing - PLAN CHECK | 1/27/2017 | | 2/15/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 2/13/2017 | | 2/13/2017 | | PASS |
Troy James
|
|
|
Redlined plans
|
Routing - MECHANICAL | 1/27/2017 | | 1/30/2017 | | FAIL |
Troy James
|
|
|
Left message with mechanical engineer to call me.
|
1st review completed | | | 10/28/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/3/2016 | | 10/28/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - FIRE | 10/3/2016 | 10/3/2016 | 10/4/2016 | | PASS |
Katie Marron
|
|
|
comments attached to case.
|
Intake Approval | | | 10/3/2016 | | PASS |
David Ferguson
|
|
|
|
Routing - PLANNING | 10/3/2016 | | 10/3/2016 | | PASS |
Cody Riddle
|
|
|
Indoor recreation; allowed in the C-3 zone.
|
Routing - Addressing | 10/3/2016 | | 10/3/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/3/2016 | | 10/3/2016 | | PASS |
Rachael Beierle
|
|
|
PAID VANILLA SWR16-00461
|
Intake Approval | | | 8/1/2016 | | FAIL |
David Ferguson
|
|
|
After reviewing your submittal documents and consulting with other commercial plan reviewers, we feel that the scope of work and it being an A-3 occupancy we need to treat this as a major TI. Please review the #520 form and upload all of the required documents indicated on that form. Provide plan sheets from BLD16-01070 with your submittal so that the plan reviewer does not need to research that project.
Also, plans must be dimensioned and I do not see dimensions for any walls, room areas etc.
Lastly, please sign and date your architect stamp on page A1.0.
|
Application received | | | 7/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2016 11:37AM
|