Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-02735
StatusFinaled
Name THE SUNDANCE COMPANY
Site Address 9460 W FAIRVIEW AVE Unit: 110
Project NameBridge Coop of Idaho - Ste 110
Customer Number 
ePlanReviewYes
Description
**(BRIDGE COOPERATIVE OF BOISE - SUITE #110)** Permit is to remodel an existing 1,722 sq. ft. tenant space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select portion of interior nonbearing wall for new opening, new millwork and a new sink, plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is not Fire Sprinklered. Note: approved load reduction 49 maximum occupants allowed. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/21/201610/17/2016 DONE
This permit finaled on the web by Carissa Primmer
First Notice 9/17/201610/11/2016 DONE
mailed 10-12-16
BLD-Final9/6/20169/7/20169/7/2016APASS
DetailsJim Storey
Please call Sid at ###-####. Phone #: ###-#### Inspection requested via web by Carissa Primmer aproved plan clearly states no mech required.
Permanent Occupancy  9/7/2016 DONE
FIRE-Final Inspection9/1/20169/1/20169/1/2016PPASS
DetailsTroy Cobbley
Life safety passed
Issue PAID IN FULL permit  8/26/2016 DONE
Print Occupancy Form  8/26/2016 DONE
Plan assigned to (JG)8/5/20168/5/20168/24/2016 PASS
DetailsJavier Guzman
1st review completed, 8/11 L1 Bridge Coop of Idaho ePlan change of use B to A2
Routing - PLAN CHECK8/24/2016 8/24/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/24/2016 DONE
Permit Ready to Issue  8/24/2016 DONE
DetailsChristina Prado
All requirements met ** C_P 8/25 //need GC & rev cert of val
Routing - PLAN CHECK8/5/2016 8/11/2016 FAIL
DetailsJavier Guzman
change of use office to assembly ePlan
1st review completed  8/11/2016 FAIL
DetailsJavier Guzman
Intake Approval  8/5/2016 PASS
DetailsDavid Ferguson
Routing - Addressing8/5/2016 8/5/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/5/2016 8/5/2016 PASS
DetailsRachael Beierle
Intake Approval  8/2/2016 FAIL
DetailsDavid Ferguson
- Improper page size
- Need architects stamp for scope of work
- Need Table of Contents
- Pages uploaded vertically not horizontally and must be named properly (follow naming convention requirements)
- Need Code analysis
- Need plumbing page(s) to address plumbing requirements on checklist and shall be stamped by an Idaho licensed engineer
Application received  7/27/2016 DONE
Application submitted via PDS Online on Jul 27 2016 11:52AM