BLD-Final | 6/4/2018 | 6/4/2018 | 6/4/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown
|
DOC - Permit Finaled | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/4/2018 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Sam Brown. Egress window in master bedroom does not meet the min. opening, height or width requirements.
|
BLD-Final | 5/3/2018 | 5/3/2018 | 5/3/2018 | A | NR |
Brandon Shaw
|
|
|
Requesting late AM inspection. Phone #: ###-#### Inspection requested via web by Sam Brown
|
Plan Modification Accepted | | | 1/18/2018 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 1/18/2018 | | 1/18/2018 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Energy code compliance | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Energy code compliance | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Remove sheet rock for inspection.
|
BLD-Framing/Rough-in | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | PART |
Mike Jordan
|
|
|
Sam Phone #: ###-####. All isuues resolved except for repair of floor joist in garage. Ok to insulate.
|
BLD-Framing/Rough-in | 11/7/2017 | 11/8/2017 | 11/8/2017 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Complete all fireblocking, install all missing break away clips on 2 hr. fire walls, complete the laydown parapets, repair all floor joist and provide truss engineering.
|
BLD-Wall Bracing | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Wall cover | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Mike Jordan
|
|
|
late afternoon- shear- Sam Phone #: ###-####. Ok to tyvek exterior. Still missing floor to floor straps. Will install on top of tyvek and call for reinspection.
|
BLD-Wall Bracing | 9/29/2017 | 10/4/2017 | 10/4/2017 | A | NR |
Mike Jordan
|
|
|
Shear // Paul Phone #: ###-####
|
BLD-Foundation | 8/17/2017 | 8/17/2017 | 8/17/2017 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2082309827 >> Inspection requested via mobile web by Sam. Interior thickend footings.
|
BLD-Foundation | 8/16/2017 | 8/16/2017 | 8/16/2017 | P | FAIL |
Mike Jordan
|
|
|
Sam Phone #: ###-####. reinforcement on interior thickend footings not per approved plans.
|
BLD-Energy code compliance | 8/7/2017 | 8/8/2017 | 8/8/2017 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####. Rigid insulation on stemwall under slab on grade.
|
BLD-Foundation | 8/1/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/31/2017 | 8/1/2017 | 8/2/2017 | P | PASS |
Brandon Shaw
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/28/2017 | 7/31/2017 | 7/31/2017 | P | NR |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Framing/Rough-in | 7/27/2017 | 7/28/2017 | 7/28/2017 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/20/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/20/2017 | | DONE |
|
|
|
|
Extend Review Timeline | | | 6/2/2017 | | DONE |
|
|
|
Final Approved 180 day Extension per Adele. See documents
|
Extend Review Timeline | | | 1/18/2017 | | DONE |
|
|
|
1st approved 180 day extension per Adele. See documents
|
Expiration Notice | 1/3/2017 | 1/25/2017 | 1/3/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 9/7/2016 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/7/2016 | | DONE |
|
|
|
Needs; GC Form & RP
DO NOT ISSUE WITHOUT BLD16-02743
|
Routing - PLAN CHECK | 8/30/2016 | | 9/7/2016 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 8/9/2016 | | 9/7/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 8/26 L2 townhouse (Bld16-02743/02744); planning
|
Routing - PLANNING | 8/30/2016 | | 8/30/2016 | | PASS |
Cody Riddle
|
|
|
|
Routing - MECHANICAL | 8/30/2016 | | 8/30/2016 | | PASS |
Troy James
|
|
|
|
Plan resubmittals received | | | 8/30/2016 | | DONE |
|
|
|
|
1st review completed | | | 8/26/2016 | | FAIL |
|
|
|
pending planning approval
|
Routing - PLAN CHECK | 8/9/2016 | | 8/26/2016 | | PASS |
Tisha Gallop
|
|
|
pending planning approval
|
Routing - PLANNING | 8/9/2016 | | 8/15/2016 | | FAIL |
Cody Riddle
|
|
|
A 15'' setback is required around the perimeter of the site.
|
Routing - Addressing | 8/9/2016 | | 8/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/9/2016 | | 8/9/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 8/9/2016 | | 8/9/2016 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/9/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/2/2016 | | FAIL |
Christina Prado
|
|
|
Need ACCA approved manual J & Wall Bracing Plans
|
Application received | | | 7/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2016 2:56PM
|