Third Notice | | 8/15/2017 | 9/27/2017 | | DONE |
|
|
|
This permit finaled on the web by derek cooper
|
Second Notice | | 7/22/2017 | 8/10/2017 | | DONE |
|
|
|
Mailed 8-11-17
|
First Notice | 6/29/2017 | 6/29/2017 | 7/12/2017 | | DONE |
Brandon Shaw
|
|
|
Mailed 7-13-17
|
PubWorks Occupancy Approval | 6/30/2017 | 6/30/2017 | 6/30/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 6/30/2017 | | DONE |
|
|
|
|
BLD-Final | 6/28/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Brandon Shaw
|
|
|
Brian Cooper Phone #: ###-####
|
DOC - Permit Finaled | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 6/29/2017 | 6/29/2017 | 6/29/2017 | P | PASS |
Brandon Shaw
|
|
|
|
Temporary Occupancy | 6/29/2017 | 9/27/2017 | 6/29/2017 | | DONE |
Candy A. Nichols
|
|
|
|
PubWorks Temp Occupancy Appr | 6/29/2017 | 6/29/2017 | 6/29/2017 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/27/2017 | 6/28/2017 | 6/28/2017 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete in area of work, no fire alarm modifications, fire extinguishers are in place with current inspection tags, building has knox box installed ny main entry, no storage exceeding 8 feet in height in area of work at time of life fire safety inspection. Final life fire safety inspection for area of work passed/complete.
|
BLD-Conference | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Foundation | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### si pending north ft line
|
Issue PAID IN FULL permit | | | 2/28/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/28/2017 | | DONE |
|
|
|
|
Extend Review Timeline | | | 2/1/2017 | | DONE |
|
|
|
1st Apprvoed Extension per Adele. See Documents
|
Telephone call | | | 1/23/2017 | | DONE |
|
|
|
Spoke with Derek, just had to say name and city of boise and he asked for the email address to sent request to.
|
Telephone call | | | 1/17/2017 | | DONE |
|
|
|
Spoke with Derek informing him the permit is going to expire on the 23rd. He said they summited for payment to get a check and haven't hear back yet. Told him it would be a 180 day extension and he said he would get the letter in
|
Expiration Notice | 1/3/2017 | 1/25/2017 | 1/3/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 10/13/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/22/2016 | 8/22/2016 | 10/13/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed
|
Routing Off Site - STRUCTURAL | 10/10/2016 | | 10/13/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 10/13/2016 | | 10/13/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/13/2016 | | DONE |
|
|
|
** ONLY NEEDS ACHD as of 11-22-16 KRS ***Needs; GC form, Rev Cert of Value, ACHD, RP
|
Routing - PLAN CHECK | 9/26/2016 | | 10/3/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
pending structural approval
|
Routing Off Site - STRUCTURAL | 9/26/2016 | | 10/3/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Route to Impact Fee Review | 9/20/2016 | 9/23/2016 | 9/21/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 8/22/2016 | | 9/16/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
1st review completed | | | 9/16/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 8/22/2016 | | 9/8/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 8/22/2016 | | 9/3/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLANNING Land Div | 8/22/2016 | | 8/31/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Environmental | 8/22/2016 | | 8/30/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - FIRE | 8/22/2016 | 8/22/2016 | 8/29/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - Design Review | 8/22/2016 | | 8/25/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - Erosion and Sediment | 8/22/2016 | | 8/23/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
7,243 s.f. pre-engineered metal building addition to the existing warehouse facility
|
Routing - Addressing | 8/22/2016 | | 8/22/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/22/2016 | | 8/22/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/5/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/4/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following. Incomplete submittals will not be accepted:
• Site specific fire flow at hydrants letter from Suez Water or other public water provider. Include static pressure if sprinklers are to be installed. (you have uploaded the request for fire flow info not the actual letter)
• Per ePlan submittal standards all the architectural plan sheets shall be uploaded as individual sheets not as a packet and each plan sheet must clearly indicate the information found on the individual page. “Example: A2.0 – Floor Plan”
• Per ePlan submittal standards all the civil plan sheets shall be uploaded as individual sheets not as a packet and each plan sheet must clearly indicate the information found on the individual page. “Example: C2.0 – Grading and Drainage Plan”
• Per ePlan submittal standards all the structural plan sheets shall be uploaded as individual sheets not as a packet and each plan sheet must clearly indicate the information found on the individual page. “Example: S2.0 – Foundation Details”
• Per the checklist Building Plans shall be on minimum 18” x 24” size sheets. The submitted PEMB plan sheets are currently on 11x17 plan sheets and need to be enlarged to minimum standards or place (4) of the existing 11x17 sheets on a 36x24 plan sheet for prescreen approval
|
Application received | | | 7/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 27 2016 3:21PM
|