Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD16-02750
StatusFinaled
Name IDAHO ELECTRIC SIGNS
Site Address 8055 W GODDARD RD
Project NameCapital High Scoreboard
Customer Number 
ePlanReviewNo
Description
(CAPITAL HIGH SCHOOL – FOOTBALL SCOREBOARD RELOCATION – FROM SOUTH END TO NORTH END) (10-17-16 PLAN MODIFICATION TO PROVIDE 4 SUPPORT POSTS INSTEAD OF 3, TO REDUCE THE POST SIZE FROM 10 INCHES DIAMETER TO 8 INCHES DIAMETER, TO REDUCE THE DEPTH OF THE FOOTINGS TO 6 FEET INSTEAD OF 10 FEET OR 11.5 FEET, TO INCREASE THE HORIZONTAL DIMENSIONS OF THE FOOTING TO A 3.75 FEET BY 2.5 FEET RECTANGLE INSTEAD OF A 2.5 FEET DIAMETER CYLINDER, AND TO PROVIDE TWO #4 HOOP TIES FOR REINFORCEMENT WITH THE TOP BAR 6 INCHES BELOW THE TOP OF THE FOOTING AND THE LOWER BAR 6 INCHES BELOW THAT. THE CONCRETE WILL BE PLACED DIRECTLY AGAINST THE SOIL.) To relocate the existing football scoreboard from the South end of the football field to the North end of the football field. The scoreboard will be raised so that the bottom of the scoreboard will be 7 feet above grade. Work is to include 10 inch diameter HHS round steel columns with headed anchor studs at the bottom embedded at least 7 feet into 30 inch diameter concrete foundation piers that are 10 feet or 11.5 feet deep. The piers will be formed with Sonotubes. Rebar is required in accordance with the structural design (i.e. #6 vertical bars and #3 horizontal ties). Special Inspection is required for concrete. The annular spaces between the outside of the Sonotubes and the soil are required to be completely filled with material having similar strength characteristics as the surrounding soil. The work is required to comply with the approved drawings, with the structural design, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  12/21/2018 DONE
Drawings taken to Records
First Notice5/31/20185/31/20186/11/2018 DONE
DetailsJim Sly
mailed 6-12
BLD-Final5/30/20186/1/20186/1/2018PPASS
DetailsJim Sly
Aging Phone #: ###-#### Inspection requested via web by Steve VanWinkle
DOC - Permit Finaled6/1/20186/1/20186/1/2018PPASS
DetailsJim Sly
DOC - Permit Finaled5/31/20185/31/20185/31/2018PPASS
DetailsJim Sly
CHANGE STATUS TO (ISS)  10/27/2016 DONE
(F) Reprint permit  10/27/2016 DONE
Plan assigned to (CJW)10/13/201610/13/201610/18/2016 PASS
DetailsCarl Westfall
Routing - PLAN CHECK10/13/2016 10/18/2016 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  10/18/2016 DONE
Permit Ready to Issue  10/18/2016 DONE
DO NOT RE ISSUE PLAN MOD
Telephone call  10/18/2016 DONE
Left a message for Daniel Conlin informing him the plan mod is ready to be picked up and the additional fees due
Plan Modification Accepted  10/13/2016 DONE
Issue PAID IN FULL permit  9/21/2016 DONE
Telephone call  8/9/2016 DONE
notified customer that permit is ready
Plan assigned to (CJW)7/28/20167/28/20168/8/2016 PASS
DetailsCarl Westfall
(July 29 - 3 days)
Routing - PLAN CHECK7/28/2016 8/8/2016 PASS
DetailsCarl Westfall
1st review completed  8/8/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/8/2016 DONE
Permit Ready to Issue  8/8/2016  
***all requirments met 9-21-16 /CEV

Need GC Form and Revised Cert of Value
Inspection Record Card- Bld  8/8/2016 DONE
Plans ACCEPTED BY PLAN TECH  7/27/2016 DONE
Intake Approval  7/27/2016 PASS
DetailsTim L. Woodard
Application received 7/27/2016