BLD-Framing/Rough-in | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PART |
Tony Young
|
|
|
Audrey Phone #: ###-####,, floor joist engineer fix ok
|
Routing Walk-In (BLD) | 8/19/2016 | 8/19/2016 | 8/19/2016 | P | PASS |
Tisha Gallop
|
|
|
plan modification
|
CHANGE STATUS TO (ISS) | | | 8/19/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 8/19/2016 | | DONE |
|
|
|
modification to the approved plans
|
BLD-Conference | 7/29/2016 | 8/1/2016 | 8/1/2016 | A | DONE |
Dave Hannah
|
|
|
would like call ahead; Josh Phone #: ###-####
|
Routing Walk-In (BLD) | 7/28/2016 | 7/28/2016 | 7/28/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 7/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 7/28/2016 | | 7/28/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 7/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 7/28/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 7/28/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/28/2016 | | DONE |
|
|
|
|
Application received | | 7/28/2016 | | | |
|
|
|
|