Second Notice | | 12/25/2016 | 1/10/2017 | | DONE |
|
|
|
Mailed 1-11
|
First Notice | | 11/26/2016 | 12/15/2016 | | DONE |
|
|
|
Mailed 12-16
|
Permanent Occupancy | | | 11/16/2016 | | DONE |
|
|
|
|
BLD-Final | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Jim Sly
|
|
|
Randy Phone #: ###-####
|
FIRE-Final Inspection | 11/10/2016 | 11/14/2016 | 11/10/2016 | A | PASS |
Katie Marron
|
|
|
Fire Life Safety Pass.
|
BLD-Final | 11/7/2016 | 11/8/2016 | 11/8/2016 | A | CANC |
Tony Young
|
|
|
Brandy/ please call ahead Phone #: ###-####
|
FIRE-Final Inspection | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | FAIL |
Katie Marron
|
|
|
Upright Sprinkler heads were painted. Additional coverage needs to be added to the restroom do to the dropped/hardlid ceiling. The entire space needs to be reviewed by a licensed sprinkler contractor to determine if additional modifications due to the walls are required. A sprinkler permit is required.
|
BLD-Wall cover | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2016 | 9/26/2016 | 9/26/2016 | A | PART |
Tony Young
|
|
|
Randy Phone #: ###-####,, needs fire blocking in double walls,,
|
Issue PAID IN FULL permit | | | 9/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/26/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 8/4/2016 | 8/4/2016 | 8/26/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed Foxy Nails
|
Routing - PLAN CHECK | 8/26/2016 | | 8/26/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/26/2016 | | DONE |
|
|
|
***ALL MET*** Need GC Form and Revised Cert Of Value
|
1st review completed | | | 8/24/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 8/4/2016 | | 8/24/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - MECHANICAL | 8/4/2016 | | 8/8/2016 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/4/2016 | | 8/8/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated.
|
Routing - FIRE | 8/4/2016 | 8/4/2016 | 8/4/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - PLUMBING | 8/4/2016 | | 8/4/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - Addressing | 8/4/2016 | | 8/4/2016 | | PASS |
Laura Hunter
|
|
|
Suite #102
|
Routing - PUBLIC WORKS | 8/4/2016 | | 8/4/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plan Reviewer's activity | | | 8/4/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
called and left message with applicant. 1st time TI is major not minor TI.
|
Intake Approval | | | 8/4/2016 | | PASS |
David Ferguson
|
|
|
|
Intake Approval | | | 8/2/2016 | | FAIL |
David Ferguson
|
|
|
Need ESC Waiver Letter
|
Application received | | | 7/28/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 28 2016 4:23PM
|