BLD-Energy code compliance | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PART |
Dave Hannah
|
|
|
Eric Phone #: ###-#### draft stopping ok but st?l needs to finish insulation
|
BLD-Framing/Rough-in | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
Mike Jordan
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2017 | 2/28/2017 | 2/28/2017 | A | PART |
Dave Hannah
|
|
|
Eric; Phone #: ###-#### letter from struc engineer oking hold downs ext ok crew roll blocking and installing draft stops
|
BLD-Conference | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PART |
Tony Young
|
|
|
Eric; Phone #: ###-####,, progress inspection on hold downs from new engineering,, need plan review ok,, will have engineer verify as built also
|
BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | DEFR |
Tony Young
|
|
|
Eric; Phone #: ###-####,, pm
|
BLD-Conference | 2/17/2017 | 2/17/2017 | 2/17/2017 | A | NH |
Tony Young
|
|
|
eric
|
BLD-Aging Inspection | 2/10/2017 | 2/10/2017 | 2/14/2017 | | PEND |
Tony Young
|
|
|
|
Telephone call | | | 2/1/2017 | | DONE |
|
|
|
customer had Eric call to find out how to change the GC to the homeowner? I told him the GC needs to send and email or come in stating he is no longer going to be the GC and the homeowner can sign the Gc form and we'll change permit to his name. He also asked what to do if another GC was to take over so i told him basically the same thing. We need an email or something from the current GC stating they are no longer doing the job and the new one will have to fill out the GC form
|
BLD-Framing/Rough-in | 1/30/2017 | 1/31/2017 | 1/31/2017 | A | PEND |
Dave Hannah
|
|
|
Eric late AM (office ###-####) Phone #: ###-#### needs mec rough in engineering on shear and hold downs house was lifted thin set back down and no connection between house and foundation done also fire stoppind issues around walls in basement
|
BLD-Foundation | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PART |
Tony Young
|
|
|
Luke,, rebar ok on poured footings
|
BLD-Footing | 9/27/2016 | 9/28/2016 | 9/28/2016 | P | PART |
Tony Young
|
|
|
Requests 2:30-3PM - Lucas Phone #: ###-####,, partial basement footings
|
OVERRIDE | | | 9/21/2016 | | |
|
|
|
|
Telephone call | | | 9/21/2016 | | DONE |
|
|
|
Spoke with Jeff informing him that this permit is ready and the fee amount due for issuance
|
Issue PAID IN FULL permit | | | 9/21/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/21/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/21/2016 | | DONE |
|
|
|
All Met
|
Routing Walk-In (Zoning) | 9/15/2016 | 9/15/2016 | 9/15/2016 | P | PASS |
Katelyn Menuge
|
|
|
DRH16-00316 for 2 new basement window wells, no structure changes. Building Plan Modification for 3 new window wells okay. No visible changes to front facade, including foundation, allowed without approval.
|
1st review completed | | | 9/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/15/2016 | | 9/15/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 8/1/2016 | 8/1/2016 | 8/1/2016 | A | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 8/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/1/2016 | | 8/1/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/1/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 8/1/2016 | | DONE |
|
|
|
|
Application received | | 8/1/2016 | | | |
|
|
|
|