First Notice | | 11/28/2016 | 11/29/2016 | | DONE |
|
|
|
This permit finaled on the web by Todd Weltner
|
PubWorks Occupancy Approval | 11/18/2016 | 11/18/2016 | 11/18/2016 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 11/18/2016 | | DONE |
|
|
|
|
BLD-Final | 11/8/2016 | 11/8/2016 | 11/8/2016 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Final | 11/7/2016 | 11/7/2016 | 11/7/2016 | P | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ok for temp occ ok for perm occ after plumbing gos perm
|
FIRE-Final Inspection | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Katie Marron
|
|
|
Fire Life Safety Pass. Exterior exit discharge lighting was not operational, to be corrected and verified by Building inspector. All other emergency lighting and exit signs are good.
|
Zoning Approval | 11/4/2016 | 11/4/2016 | 11/4/2016 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 11/2/2016 | 11/2/2016 | 11/2/2016 | P | DONE |
Katie Marron
|
|
|
Verify floor plan posted at panel with correct monitor modules identified for duct detectors.
|
BLD-Framing/Rough-in | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Dave Hannah
|
|
|
Kent-1 room office 16-ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2016 | 10/3/2016 | 10/7/2016 | A | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/14/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/14/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/13/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 8/10/2016 | 8/10/2016 | 9/13/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) (Aug 30 - 15 days) stone school
|
Routing - Design Review | 9/6/2016 | | 9/13/2016 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLAN CHECK | 9/2/2016 | | 9/13/2016 | | DONE |
Carl Westfall
|
|
|
Routing completed
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2016 | | DONE |
Christina Prado
|
|
|
Need RP, GC Form & Revised Certificate of Value for issuance
|
Plan resubmittals received | | | 9/6/2016 | | DONE |
|
|
|
|
Routing PW Drainage | 9/6/2016 | | 9/6/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 9/6/2016 | | 9/6/2016 | | PASS |
Terry Alber
|
|
|
Under-sink grease trap approved.
|
1st review completed | | | 9/1/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 9/1/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/10/2016 | | 9/1/2016 | | PASS |
Carl Westfall
|
|
|
1st IBC plan review completed and approved
|
Routing PW Drainage | 8/10/2016 | | 8/18/2016 | | FAIL |
Brian Murphy
|
|
|
|
Routing - PLUMBING | 8/10/2016 | | 8/15/2016 | | PASS |
Bill VanDegrift
|
|
|
if an RP is installed on the water service provisions must be made
to accept the discharge.
|
Routing - FIRE | 8/10/2016 | 8/10/2016 | 8/12/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing - ELECTRICAL | 8/10/2016 | | 8/12/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 8/10/2016 | | 8/12/2016 | | FAIL |
Sarah Schafer
|
|
|
The plans for the temporary parking lot do not match the Design Review approval through DRH16-00178. A modification must be submitted prior to building permit sign off. Message left for Toby with LKV Architects at 1:30 on 8-12-16.
|
Routing - MECHANICAL | 8/10/2016 | | 8/11/2016 | | PASS |
Troy James
|
|
|
|
Routing - Erosion and Sediment | 8/10/2016 | | 8/11/2016 | | PASS |
Evan Jenkins
|
|
|
**No Site Prep Inspection Required**
Change use of existing building to private grades 10-12 school
|
Routing - Addressing | 8/10/2016 | | 8/10/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/10/2016 | | 8/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/10/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 8/9/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• the architectural plan sheet A0.0 needs to be stamped/signed/dated by an Idaho licensed architect
|
Intake Approval | | | 8/8/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following, Incomplete submittals will not be accepted:
• You are stating that a Soils and geotech report was provided but none was uploaded for support of the structure where applicable stamped and signed by an Idaho licensed engineer declaring on plans the default seismic site class & soil bearing per IBC. If not applicable to this project, please mark N/A on checklist.
• Any Modifications to the code, Alternative materials/methods/design of construction or equipment, or any Upgrade Agreement all approved and signed by the Building Official, and where applicable, the Fire Marshal. You stated yes to this statement in the checklist please clarify what code is being modified or alternate materials used?
• You are stating that an Erosion & Sediment Control narrative plan was uploaded but none found. Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
• Stated uploaded but none found, Soils and geotech report for infiltration systems where applicable stamped and signed by an Idaho licensed civil engineer, geologist, or soil scientist.
• Stated uploaded but none found, Site Grading & Drainage Plans where applicable - stamped and signed by an Idaho licensed design professional
• Stated uploaded but none found, Site Drainage Report where applicable) stamped and signed by an Idaho licensed design professional including descriptive narrative and calculations
• Stated uploaded but none found, Drainage System Operation & Maintenance Plan where applicable stamped and signed by Idaho licensed design professional
• Per ePlan submittals all plans must be uploaded in “Landscape” format in the horizontal position, one of the demo sheets and all the L sheets are uploaded vertical
• All the architectural and demo plan sheets need to be stamped/signed/dated by an Idaho licensed architect
• Portable fire extinguisher locations
|
Application received | | | 8/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2016 6:37PM
|