BLD-Final | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-####
|
DOC - Permit Finaled | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Framing/Rough-in | 5/4/2017 | 5/5/2017 | 5/5/2017 | A | CANC |
Brandon Shaw
|
|
|
please call 20 min prior to meet // Douglas Phone #: ###-####
|
BLD-Framing/Rough-in | 5/1/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Jim Storey
|
|
|
Doug Phone #: ###-#### a1 and 2 header master interior bearing point/web brace ok to insulate
|
BLD-Other | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | PASS |
Jim Storey
|
|
|
fire soffit; Douglas Phone #: ###-####
|
BLD-Footing | 4/3/2017 | 4/3/2017 | 4/3/2017 | P | DONE |
Jim Storey
|
|
|
would like call ahead; Douglas Phone #: ###-####
|
BLD-Conference | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | DONE |
Mike Jordan
|
|
|
Please call ahead - Doug Phone #: ###-####
|
Meeting | | | 2/21/2017 | | DONE |
Rita DeYoung
|
|
|
Heinz Built Homes turned permit over to parcel owner Doug & Laura Gale. See documents.
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/21/2017 | | DONE |
|
|
|
|
BLD-Wall Bracing | 1/6/2017 | 1/6/2017 | 1/6/2017 | P | PASS |
Jim Storey
|
|
|
Please call so someone can meet you at the site. Thank you! Phone #: ###-#### Inspection requested via web by Christophe Heinz
|
BLD-Wall Bracing | 12/14/2016 | 12/14/2016 | 12/14/2016 | P | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Christophe Heinz. No Plans onsite.
|
BLD-Foundation | 9/30/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Phil Shearer
|
|
|
Jarod Phone #: ###-####
|
BLD-Footing | 9/29/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Phil Shearer
|
|
|
Jared Phone #: ###-####
|
PubWorks Subgrade Approval | 9/29/2016 | 9/29/2016 | 9/29/2016 | | DONE |
Jason C. Taylor
|
|
|
*FOOTINGS ONLY NO COLUMNS**A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | CANC |
Jim Storey
|
|
|
Jared Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/21/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/20/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/3/2016 | 8/3/2016 | 9/20/2016 | | DONE |
Brian McGowan
|
|
|
Due 8-19 Level 2 Fail -Home is in Hillside. Home must have stamped footing and stem wall calculations and Foundation Plan. WUI Zone "A" requirements must be shown on plans.
|
Inspection Record Card- Bld | | | 9/20/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2016 | | DONE |
|
|
|
called Chris to let know permit is ready and how much is owed
|
Case Summary (BLD) | | | 9/20/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/20/2016 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 9/1/2016 | | 9/20/2016 | | PASS |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 9/9/2016 | | DONE |
|
|
|
received (2) sets of calculation resubmittals
|
Plan resubmittals received | | | 9/2/2016 | | DONE |
|
|
|
received two copies of sheets 1, 3, 6, 10- put on Brian's desk
|
Routing - PUBLIC WORKS | 9/1/2016 | | 9/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Grading-Hillside | 8/31/2016 | | 9/1/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 8/31/2016 | | 8/31/2016 | | FAIL |
Brian McGowan
|
|
|
Need beams/headers called out on plan for floor truss support and WUI details
|
Plan resubmittals received | | | 8/25/2016 | | DONE |
|
|
|
Three copies of sheet 5 (Small and large copies). Taken to Brian MC
|
Plan resubmittals received | | | 8/25/2016 | | DONE |
|
|
|
received 3 copies of structural engineering- put on Brian's desk
|
1st review completed | | | 8/19/2016 | | FAIL |
Brian McGowan
|
|
|
Home is in Hillside. Home must have stamped footing and stem wall calculations and Foundation Plan. WUI Zone "A" requirements must be shown on plans.
|
Routing - PLAN CHECK | | | 8/19/2016 | | FAIL |
Brian McGowan
|
|
|
Need stamped foundation plan with stamped calculations and WUI details
|
Plan resubmittals received | | | 8/10/2016 | | DONE |
|
|
|
One copy of Boulder Retaining Wall Calculations, Three copies of sheets C1.0, C2.0 and ESC1.0. Taken to Brian Mc
|
Routing - FIRE | 8/9/2016 | | 8/10/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD access and hydrant availability.
|
Routing - Erosion and Sediment | 8/8/2016 | | 8/9/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted. Valid RP and PD designated. Site preparation inspection and BMP installation is required prior to excavation.
|
Routing - MECHANICAL | 8/4/2016 | | 8/8/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/4/2016 | | 8/4/2016 | | PASS |
Jeff Lowe
|
|
|
|
Routing PW Grading-Hillside | 8/2/2016 | | 8/4/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need extra set of grading plans to approve project.
|
Routing - PUBLIC WORKS | 8/2/2016 | | 8/4/2016 | | FAIL |
Rachael Beierle
|
|
|
SEE HILLSIDE
|
Plan assigned to (LEG) Tisha | 8/2/2016 | | 8/3/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/2/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2016 | | DONE |
|
|
|
|
Routing - Addressing | 8/2/2016 | | 8/2/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Rating | 8/2/2016 | | 8/2/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | 8/2/2016 | | | |
|
|
|
|