Permit Information
Permit NumberBLD16-02819
StatusFinaled
Name BRIGHTON STUDIO INC
Site Address 3249 E FRONT RUNNER LN
Project NamePP-03-9601
Customer NumberBLD16-02815, 02820, 02821
ePlanReview 
Description
(4 PERMITS TOTAL FILED UNDER BLD16-02815 IN EPLANREVIEW)Permit for the construction of a new 1805 sq. ft., three story (first story 175 sq. ft., second story 785 sq. ft., third story 845 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, and a 605 sq. ft. attached garage per the approved plans, engineering, ResCheck, ACCA report and any notations. SP-02 zoning and setbacks per planning. //leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/8/20172/8/20172/8/2017PPASS
DetailsJim Storey
Garage open for access Inspection requested via web by Erby Gonzales
DOC - Permit Finaled2/8/20172/8/20172/8/2017PPASS
DetailsJim Storey
BLD-Energy code compliance11/23/201611/23/201611/23/2016PPASS
DetailsPhil Shearer
Inspection requested via web by Erby Gonzales
BLD-Framing/Rough-in11/18/201611/18/201611/18/2016PPASS
DetailsPhil Shearer
Plans on site. Mech inspection complete this afternoon. Could you stop here last stop Inspection requested via web by Erby Gonzales
Plan Modification Accepted  11/18/2016 DONE
new manual j report
Routing - MECHANICAL11/18/2016 11/18/2016 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall cover11/2/201611/3/201611/3/2016APASS
DetailsPhil Shearer
Shear inspection, plans on site Inspection requested via web by Erby Gonzales
BLD-Foundation9/12/20169/12/20169/12/2016PPASS
DetailsPhil Shearer
Doug Phone #: ###-####
BLD-Footing9/7/20169/8/20169/8/2016PPASS
DetailsJim Storey
Brian Phone #: ###-####
Place hold on job8/16/2016 8/29/2016 DONE
DetailsBrittany Hill
There are 4 permits total
Issue PAID IN FULL permit  8/29/2016 DONE
Inspection Record Card- Bld  8/29/2016 DONE
OVERRIDE  8/16/2016  
1st review completed  8/16/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/16/2016 DONE
Permit Ready to Issue  8/16/2016 DONE
all requirements met
Plan assigned to (LEG) Tisha8/2/2016 8/16/2016 DONE
DetailsTisha Gallop
8/19 L2 townhouse
Routing - PLAN CHECK8/2/2016 8/16/2016 PASS
DetailsTisha Gallop
Routing - MECHANICAL8/2/2016 8/8/2016 PASS
DetailsTroy James
Routing - PLANNING8/2/2016 8/5/2016 PASS
DetailsJosh Wilson
Routing PW Flood Plain8/2/2016 8/3/2016 PASS
DetailsJim Wyllie
Property out of floodplain as per Letter of Map Revision.
Jim Wyllie / ###-####
Plans ACCEPTED BY PLAN TECH  8/2/2016 DONE
Intake Approval  8/2/2016 PASS
Recd Pcfee & Taken To Pln CK  8/2/2016 DONE
Routing - Addressing8/2/2016 8/2/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/2/2016 8/2/2016 PASS
DetailsRachael Beierle
Application received 8/2/2016