BLD-Conference | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Jim Sly
|
|
|
Final inspection call Shawn Phone #: ###-#### Inspection requested via web by Shawn Res
|
DOC - Permit Finaled | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Other | 12/28/2016 | 12/29/2016 | 12/29/2016 | A | PASS |
Phil Shearer
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Shawn Res
|
BLD-Framing/Rough-in | 12/29/2016 | 12/29/2016 | 12/29/2016 | P | PASS |
Phil Shearer
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by Shawn Res
|
BLD-Conference | 12/12/2016 | 12/13/2016 | 12/13/2016 | P | NR |
Phil Shearer
|
|
|
Framing Inspection Phone #: ###-#### Inspection requested via web by Shawn Res
|
BLD-Other | 11/30/2016 | 12/1/2016 | 12/1/2016 | P | PART |
Phil Shearer
|
|
|
Shear Wall inspection Phone #: ###-#### Inspection requested via web by Shawn Res. Missing hold downs OK to wrap
|
BLD-Foundation | 10/27/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Phil Shearer
|
|
|
Shawn-wall Phone #: ###-####
|
BLD-Footing | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
Phil Shearer
|
|
|
Plan gang box back patio // Res Phone #: ###-####
|
PubWorks Subgrade Approval | 10/26/2016 | 10/26/2016 | 10/26/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | NR |
Jim Storey
|
|
|
Shawn Phone #: ###-#### pw
|
BLD-Footing | 10/19/2016 | 10/20/2016 | 10/20/2016 | P | FAIL |
Phil Shearer
|
|
|
Shawn Phone #: ###-####. No sub grade inspection
|
Issue PAID IN FULL permit | | | 10/17/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/14/2016 | | |
|
|
|
|
Telephone call | | | 10/14/2016 | | DONE |
|
|
|
called Shawn to let know permit is ready and how much is owed-left message on his cell
|
Permit Ready to Issue | | | 10/14/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2016 | | 10/13/2016 | | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 10/11/2016 | | 10/13/2016 | | DONE |
Tisha Gallop
|
|
|
received 10/11/16 hillside det. garage addition
|
Inspection Record Card- Bld | | | 10/13/2016 | | DONE |
|
|
|
|
1st review completed | | | 10/13/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/11/2016 | | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map approved. Site preparation inspection required. RP listed as WPCM (request copy of certificate and interim RP fee to input contact information)
|
Routing Walk-In (BLD) | 10/11/2016 | 10/11/2016 | 10/11/2016 | A | CANC |
Tisha Gallop
|
|
|
took in as level 2
|
Routing PW Grading-Hillside | 10/11/2016 | | 10/11/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | FAIL |
Tisha Gallop
|
|
|
need eng stamp on foundation and details, need eng calcs, need WUI A details for soffit and exterior coverings.
|
Application received | | 8/3/2016 | | | |
|
|
|
|