BLD-Energy code compliance | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Jim Sly
|
|
|
Insulation // Fran Phone #: ###-#### for house/ garage separation.......I allowed 2 layers of 5/8 type X on truss......house side ......in lieu of 1/2" layer on Garage side. 2 layers tight to roof deck.
|
BLD-Conference | 9/22/2016 | 9/22/2016 | 9/22/2016 | P | DONE |
Jim Sly
|
|
|
Fran Phone #: ###-####
|
BLD-Framing/Rough-in | 9/19/2016 | 9/20/2016 | 9/20/2016 | A | NR |
Jim Sly
|
|
|
Fran Phone #: ###-#### Need Electrical rough in.
|
BLD-Foundation | 8/23/2016 | 8/24/2016 | 8/24/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Footing | 8/22/2016 | 8/23/2016 | 8/23/2016 | A | PASS |
Phil Shearer
|
|
|
Moses Phone #: ###-####
|
OVERRIDE | | | 8/11/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 8/11/2016 | 8/11/2016 | 8/11/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 8/11/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 8/11/2016 | | 8/11/2016 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/11/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 8/11/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/11/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 8/3/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Jeff Lowe
|
|
|
|
1st review completed | | | 8/3/2016 | | FAIL |
|
|
|
|
Application received | | 8/3/2016 | | | |
|
|
|
|