BLD-Final | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | PASS |
Tony Young
|
|
|
demolition; Dave Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/4/2016 | | |
|
|
|
|
Telephone call | | | 8/4/2016 | | DONE |
|
|
|
called Dave- informed him that BLD16-00710 needs to be finaled before he can pick up this permit. Told him he also needs sewer cap and the fees due
|
Plans ACCEPTED BY PLAN TECH | | | 8/4/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/4/2016 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 8/4/2016 | | DONE |
|
|
|
NEED Sewer Cap *** Make sure BLD16-00793 is FINALED BEFORE issuing this permit- GC does not have enough BOND on file for both open
|
Application received | | 8/4/2016 | | | |
|
|
|
|