BLD-Conference | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Tony Young
|
|
|
Ana Phone #: ###-####// ?s on getting a final.. needs exterior deck/landing or ?,, needs garage seperation,, handrail per code to basement
|
BLD-Aging Inspection | 3/28/2019 | 3/28/2019 | 3/29/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 3/27/2019 | 3/27/2019 | 3/28/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/9/2018 | 11/9/2018 | 11/13/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PART |
Tony Young
|
|
|
Ana Phone #: ###-####,, ?s on final,, wants to get partial for upstairs,, needs life safey and trades ok 1st
|
BLD-Conference | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Tony Young
|
|
|
Ana Phone #: ###-####,, general walk through,, ok
|
BLD-Conference | 8/2/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Tony Young
|
|
|
Ana Phone #: ###-####
|
Routing Walk-In (BLD) | 8/2/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Josh Bogle
|
|
|
wanted to talk to josh
|
BLD-Energy code compliance | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Tony Young
|
|
|
Ana Phone #: ###-####
|
BLD-Wall cover | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PART |
Tony Young
|
|
|
Ana Phone #: ###-####,, frame ok,, ok to insulate,, needs seal and fire blocking
|
BLD-Wall cover | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PART |
Tony Young
|
|
|
Ana Phone #: ###-####,, ok to start insulation on unaffected walls,, and sheet with osb per engineering up stairs bedrooms
|
BLD-Framing/Rough-in | 6/13/2018 | 6/15/2018 | 6/15/2018 | P | PART |
Tony Young
|
|
|
Michael Phone #: ###-####,, back 3 bedrooms on the main level ok to insulate,, other main floor walls without plumbing ok to insulate
|
BLD-Conference | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PEND |
Tony Young
|
|
|
Micheal Phone #: ###-####
|
OVERRIDE | | | 6/7/2018 | | |
|
|
|
|
BLD-Conference | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | DONE |
Dave Hannah
|
|
|
Ana Phone #: ###-####
|
Routing Walk-In (BLD) | 6/7/2018 | 6/7/2018 | 6/7/2018 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/7/2018 | | 6/7/2018 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/7/2018 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2018 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/7/2018 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/7/2018 | | 6/7/2018 | | PASS |
Sue Cummings
|
|
|
|
Routing PW Grading-Hillside | 6/7/2018 | | 6/7/2018 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####
|
CHANGE STATUS TO (ISS) | | | 6/7/2018 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/6/2018 | 6/6/2018 | 6/6/2018 | P | PASS |
Josh Bogle
|
|
|
chatted about what is needed to update the permit & plans
|
Routing - MECHANICAL | 5/21/2018 | | 5/21/2018 | | PASS |
Troy James
|
|
|
manual j report
|
Plan Modification Accepted | | | 5/18/2018 | | DONE |
|
|
|
making changes to drawings but wants to talk to the plan reivewer first
|
BLD-Conference | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | PASS |
Tony Young
|
|
|
Ana Phone #: ###-####,, walk through,, new owners,, need trades,, etc., has a structural engineer on board
|
(F) Reprint permit | | | 3/23/2018 | | DONE |
|
|
|
|
BLD-Conference | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PART |
Tony Young
|
|
|
Jay Raulph walk through job; Phone #: ###-####,, need a detailed engineer report/fix,, ok to seal and back fill as needed,, ok to repour garage slab, front steps,, property will be put up for sale per Jay
|
Case Summary (BLD) | | | 10/27/2017 | | DONE |
|
|
|
|
BLD-Conference | 10/19/2017 | 10/24/2017 | 10/24/2017 | A | PEND |
Tony Young
|
|
|
late AM please // conference with owner''s rep. to go over project to see what status is. GC no longer on project // contact Jay Ralphs Phone #: ###-####
|
BLD-Conference | 10/23/2017 | 10/23/2017 | 10/23/2017 | A | PART |
Tony Young
|
|
|
late AM please // conference with owner''s rep. to go over project to see what status is. GC no longer on project // contact Jay Ralphs Phone #: ###-####,, met with a potential contractor to look at job
|
BLD-Footing | 7/18/2017 | 7/21/2017 | 7/21/2017 | P | PART |
Tony Young
|
|
|
Tracy Phone #: ###-####,, interior footings for basement walls,, deck footings,, ok,
|
PubWorks Subgrade Approval | 7/21/2017 | 7/21/2017 | 7/21/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 7/17/2017 | 7/18/2017 | 7/18/2017 | A | PEND |
Tony Young
|
|
|
Tracy Phone #: ###-####,, need soils approval 1st
|
BLD-Footing | 7/17/2017 | 7/17/2017 | 7/17/2017 | P | PEND |
Tony Young
|
|
|
Tracy Phone #: ###-####
|
BLD-Footing | 7/14/2017 | 7/17/2017 | 7/17/2017 | A | PEND |
Tony Young
|
|
|
Tracy Phone #: ###-####
|
BLD-Footing | 7/13/2017 | 7/14/2017 | 7/14/2017 | A | PEND |
Tony Young
|
|
|
Tracy Phone #: ###-####,, ok pending soils approval
|
BLD-Conference | 4/25/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Tony Young
|
|
|
Check status of project/scheduling. Express neighbors concerns.// status review,, work in progress ,, ok
|
BLD-Conference | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | PART |
Tony Young
|
|
|
Check status of project/scheduling. Express neighbors concerns.,, talked with contractor.. Tracy.. he said that some good progress should be happening now... should start some footings next week..
|
BLD-Conference | 4/21/2017 | 4/24/2017 | 4/24/2017 | A | NH |
Tony Young
|
|
|
Check status of project/scheduling. Express neighbors concerns.
|
BLD-Conference | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PEND |
Tony Young
|
|
|
Check status of project/scheduling. Express neighbors concerns.,, no one on site,, no apparent recent work.. will keep checking on progress
|
OVERRIDE | | | 10/31/2016 | | |
|
|
|
|
Telephone call | | | 10/31/2016 | | DONE |
|
|
|
called Tracy to let know permit is ready-left message on the phone
|
Issue PAID IN FULL permit | | | 10/31/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2016 | | DONE |
|
|
|
MET
|
Plan assigned to (DAF) | 8/25/2016 | 8/25/2016 | 10/29/2016 | | DONE |
David Ferguson
|
|
|
due 8/31 - Jason failed - need geotech report
|
Routing - PLAN CHECK | 10/14/2016 | | 10/29/2016 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 10/29/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/14/2016 | | 10/14/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved. GC to list homeowner RP or become Interim RP.
|
Routing - PLAN CHECK | 10/6/2016 | | 10/12/2016 | | FAIL |
David Ferguson
|
|
|
Failed ESC
|
Routing - Erosion and Sediment | 10/10/2016 | | 10/10/2016 | | FAIL |
Andy J. Long
|
|
|
Need to submit ESC plan or complete ESC plan waiver. Site work and earth disturbance commenced without permits.
|
Routing PW Grading-Hillside | 10/6/2016 | | 10/6/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade and fill is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan resubmittals received | | | 10/5/2016 | | DONE |
|
|
|
received (2) sets of geotechnical reports
|
1st review completed | | | 8/31/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | | | 8/31/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing PW Grading-Hillside | 8/25/2016 | | 8/31/2016 | | FAIL |
Jason C. Taylor
|
|
|
Need geotech report
|
Routing Walk-In (BLD) | 8/24/2016 | 8/24/2016 | 8/25/2016 | P | CANC |
Tisha Gallop
|
|
|
will be routed around
|
Routing Walk-In (Zoning) | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | FAIL |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | FAIL |
David Ferguson
|
|
|
Level II due to hillside. Also, located in WUI and the new balcony does not comply with WUI so needs to be redrawn. A Manual J will also be required for new system in basement. Route to Jason T., Troy and Dave
|
Application received | | 8/4/2016 | | | |
|
|
|
|