Print Statement | | | 10/4/2017 | | DONE |
|
|
|
|
Second Notice | | 8/21/2017 | 8/11/2017 | | DONE |
|
|
|
|
Third Notice | | 8/16/2017 | 8/11/2017 | | DONE |
|
|
|
|
First Notice | | 8/7/2017 | 8/11/2017 | | DONE |
Rita DeYoung
|
|
|
.Customer filled out initial value wrong online when he submitted his permit. It was turned in as $132,639.00, unfortuntaly the value was $1,346,210.00 for the Grading, Foundation and Main permit.
|
BLD-Final | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Dave Hannah
|
|
|
Dick Phone #: ###-####
|
Permanent Occupancy | | | 7/28/2017 | | DONE |
|
|
|
|
BLD-Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | CANC |
Mike Jordan
|
|
|
Dick Phone #: ###-####
|
FIRE-Final Inspection | 7/25/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Building inspector will verify that the correct hardware is installed on the east exit door.
|
PubWorks Occupancy Approval | 7/25/2017 | 7/25/2017 | 7/25/2017 | | DONE |
Tiffany Lowery
|
|
|
|
Zoning Approval | 7/25/2017 | 7/25/2017 | 7/25/2017 | | DONE |
Andrea Tuning
|
|
|
|
Zoning Approval Temp | 7/24/2017 | 7/24/2017 | 7/24/2017 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide inspection/sign off for the Grading permit, provide lever hardware for the east exit door, provide single action hardware for the interior doors, repair exit sign/emergency light on the mezzanine.
Dante Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/20/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/20/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 5/26/2017 | | |
|
|
|
|
OVERRIDE | | | 5/26/2017 | | |
|
|
|
|
Plan assigned to (CDM) | 5/15/2017 | 5/15/2017 | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Telephone call | | | 5/26/2017 | | DONE |
Christina Prado
|
|
|
Called Tom to advise permit is ready pending fees due
|
Case Summary (BLD) | | | 5/26/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/26/2017 | | 5/26/2017 | | PASS |
Carl D Madsen
|
|
|
|
Override - Parcel Holds | | | 5/26/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/26/2017 | | DONE |
|
|
|
please do not re-issue
|
Plan resubmittals received | | | 5/23/2017 | | DONE |
|
|
|
received three copies of plan sheet S-7, supplemental canopy calculations, and elevation sheet sealed by engineer (8.5"x11"); taken to Carl M.
|
Routing - MECHANICAL | 5/18/2017 | | 5/19/2017 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 5/15/2017 | 5/18/2017 | 5/18/2017 | | PASS |
Marissa Taylor
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 5/18/2017 | | 5/18/2017 | | FAIL |
Carl D Madsen
|
|
|
Engineering calculations required for the misc. structural modifications. Sent E-Mail to the applicant. CDM
|
Routing - Design Review | 5/18/2017 | | 5/18/2017 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Ceiling Grid Inspection | 5/12/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Jim Sly
|
|
|
Dante-t-grid Phone #: ###-####
|
Plan Modification Accepted | | | 5/15/2017 | | DONE |
Christina Prado
|
|
|
Plan Mod to modify interior details, windows and canopy details.
|
BLD-Energy code compliance | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
BLD-Wall Bracing | 2/13/2017 | 2/13/2017 | 2/13/2017 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
BLD-Energy code compliance | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Dave Hannah
|
|
|
Dante Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####
|
OVERRIDE | | | 12/12/2016 | | |
|
|
|
|
OVERRIDE | | | 12/12/2016 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/12/2016 | | DONE |
|
|
|
|
BLD-Energy code compliance | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Mike Jordan
|
|
|
late afternoon - Dante Phone #: ###-####
|
BLD-Energy code compliance | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Mike Jordan
|
|
|
Dante Phone #: ###-####. Roof ok.
|
Issue PAID IN FULL permit | | | 11/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/31/2016 | | |
|
|
|
|
OVERRIDE | | | 10/31/2016 | | |
|
|
|
|
Telephone call | | | 10/31/2016 | | DONE |
|
|
|
called GC- left message that permit is ready and need GC form, ACHD
|
Permit Ready to Issue | | | 10/31/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/31/2016 | | DONE |
|
|
|
NEED ACHD and GC form
|
Routing - PLAN CHECK | 10/20/2016 | | 10/28/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 10/28/2016 | | 10/28/2016 | | PASS |
Bill VanDegrift
|
|
|
Signed off per Bill V 10-27-16
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/28/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/28/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/20/2016 | | DONE |
|
|
|
received (2) sets of resubmittals
|
Routing - FIRE | 10/18/2016 | 10/18/2016 | 10/18/2016 | | PASS |
Katie Marron
|
|
|
Building to be fully fire sprinklered with an approved emergency voice/alarm system due to mezzanine size. Revised report attached to case.
|
Routing Off Site - STRUCTURAL | 8/12/2016 | | 10/17/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 10/6/2016 | | 10/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Design | 10/6/2016 | | 10/10/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Plan resubmittals received | | | 9/28/2016 | | DONE |
|
|
|
received resubmittal plan sheets along with explanation letter
|
Plan assigned to (CDM) | | 8/12/2016 | 9/21/2016 | | FAIL |
Carl D Madsen
|
|
|
first review completed
|
Routing PW Solid Waste | 8/16/2016 | | 9/14/2016 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - FIRE | 9/7/2016 | 8/12/2016 | 9/8/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to plans.
|
Routing - Design Review | 9/8/2016 | | 9/8/2016 | | FAIL |
Andrea Tuning
|
|
|
DRH16-00131
Site Plan and Landscape Plan should match and include:
Provide a 7-foot setback from the east and west property
Provide a minimum of 2 bicycle parking stalls on the site that are located in a visible location to individuals utilizing modes of alternative transportation.
Install nine Class II or Class III trees along Fairview Avenue. If any utility easement precludes trees required by this section, the width of the required buffer shall be increased to accommodate the required trees.
Install planter islands that are a minimum of 8-feet in width (measured inside of curb to inside of curb) and install the required Class II or Class III tree with low shrubs or other vegetative groundcover within the two planter islands that flank the trash enclosure.
|
1st review completed | | | 9/8/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/25/2016 | | 9/7/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Plan resubmittals received | | | 8/30/2016 | | DONE |
|
|
|
resubmittals received 2 copies of the declaration of shared access drive aisle easement and too to Carl M
|
Routing - MECHANICAL | 8/25/2016 | | 8/25/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | | | 8/25/2016 | | FAIL |
Bill VanDegrift
|
|
|
address grading permit issues prior to building review approval
|
Routing - Erosion and Sediment | 8/19/2016 | | 8/23/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
(MAVERIK CAR COMPANY) 7640 Sq. Ft. office space,detail shop and approximately 1.9 acres of car, lot all on 2.66 acres.
|
Routing - PUBLIC WORKS | | | 8/19/2016 | | FAIL |
Rachael Beierle
|
|
|
see sewer design
|
Routing PW Drainage | | | 8/19/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 8/16/2016 | | 8/19/2016 | | PASS |
Rick Christenson
|
|
|
No sampling port needed.
|
Routing PW Sewer Rating | 8/16/2016 | | 8/16/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 8/16/2016 | | 8/16/2016 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 8/16/2016 | | 8/16/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Separate review of sewer extension required in Public Works.
|
Routing - PLANNING Land Div | 8/12/2016 | | 8/15/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 8/15/2016 | | 8/15/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/12/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/12/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/12/2016 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by AJS | 8/12/2016 | | 8/12/2016 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 8/9/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Prior to completing a pre screen please upload the drawing files per our submittal standards. I have removed all drawings currently uploaded. Each sheet shall be uploaded individually with conventional naming standards. A.0 Cover sheet.
|
Application received | | | 8/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 6 2016 9:52AM
|