Permit Information
Permit NumberBLD16-02907
StatusFinaled
Name GARCIA GRACIELA
Site Address 2709 N MAPLE GROVE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit to install a 1056 sq. ft. manufactured home on permanent foundation. Separate building pemrit must be obtained for the carport shown on the site plan. Separate erosion, electrical, plumbing and mechanical permits are required. All work is to be done according to the approved plans, Idaho State Manufactured Home Installation Standard and current local codes. All landings, stairways, and driveway with paved parking area are to be completed prior to final inspection.//leg
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  1/4/2019 DONE
BLD-Final11/15/201711/15/201711/15/2017PPASS
DetailsJim Sly
DOC - Permit Finaled11/15/201711/15/201711/15/2017PPASS
DetailsJim Sly
BLD-Ceiling Grid Inspection11/15/201711/15/201711/15/2017PCANC
DetailsJim Sly
Graciela Phone #: ###-####
BLD-Conference10/31/201711/1/201711/1/2017PDONE
DetailsJim Sly
Please call ahead for access - Graciela Phone #: ###-####
BLD-Final10/23/201710/24/201710/24/2017PNR
DetailsJim Sly
Graciela Phone #: ###-####
BLD-Foundation12/22/201612/23/201612/23/2016APASS
DetailsJim Sly
Call with question - Victor Phone #: ###-#### Talked with Contr. OK to pour as long as concrete is protected per ACI 306....Cold weather concrete Guidelines.
BLD-Footing12/12/201612/13/201612/13/2016APASS
DetailsJim Sly
victor Phone #: ###-####
Issue PAID IN FULL permit  11/18/2016 DONE
OVERRIDE  11/17/2016  
Telephone call  11/17/2016 DONE
notified customer that permit is ready
Routing - PLAN CHECK11/17/2016 11/17/2016 PASS
DetailsTisha Gallop
Inspection Record Card- Bld  11/17/2016 DONE
Case Summary (BLD)  11/17/2016 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/17/2016 DONE
Permit Ready to Issue  11/17/2016 DONE
all requirments met
Plan assigned to (LEG) Tisha8/8/2016 11/17/2016 DONE
DetailsTisha Gallop
1st review 8/12; MH on foundation (plan check/planning requirements)
Routing - PLANNING11/16/2016 11/16/2016 PASS
DetailsDavid Moser
Approved as redlined need paved parking space (min 16.5 feet x 20 feet) with a paved driveway that is 20 feet from edge of common drive. OK as per CVA16-00060 and CUP16-00079
Routing - PLAN CHECK  8/12/2016 FAIL
DetailsTisha Gallop
called and left voicemail for applicant. Need further details about manufactured home such as year, and elevations to verify it meets enhanced manufactured home requirements.
No foundation review done per planning fail. Possible revisions might effect foundation plan.
1st review completed  8/12/2016 FAIL
DetailsTisha Gallop
Telephone call  8/12/2016 DONE
spoke to Graciela. She said is 2006 MH and not multi-sectional.
Route to Impact Fee Review 8/11/20168/11/2016 PASS
Routing - PLANNING8/9/2016 8/11/2016 FAIL
DetailsJeff Lowe
dwelling does not appear to be multi-sectional
Routing - Addressing8/8/2016 8/9/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS  8/9/2016 PASS
Plans ACCEPTED BY PLAN TECH  8/8/2016 DONE
Intake Approval  8/8/2016 PASS
Recd Pcfee & Taken To Pln CK  8/8/2016 DONE
Application received 8/8/2016