BLD-Final | 5/5/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Tony Young
|
|
|
PLease call ahead 30min for access - Bill Phone #: ###-####
|
DOC - Permit Finaled | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Aging Inspection | 5/5/2017 | 5/5/2017 | 5/5/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/4/2017 | 5/4/2017 | 5/5/2017 | | PEND |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 4/21/2017 | 4/21/2017 | 4/21/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Energy code compliance | 12/19/2016 | 12/21/2016 | 12/21/2016 | A | PASS |
Tony Young
|
|
|
bill Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2016 | 12/12/2016 | 12/12/2016 | P | PASS |
Tony Young
|
|
|
Bill Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2016 | 12/9/2016 | 12/9/2016 | A | FAIL |
Mike Jordan
|
|
|
Bill Phone #: ###-####. Complete lateral bracing on C6 and C7 trusses. Roll blocl trusses in garage. Squash block under 2ply truss upstairs over window. Provide tempered glazing next to door upsstairs to balcony and downstairs to patio. Ok to insulate. Correction notice posted.
|
BLD-Framing/Rough-in | 12/7/2016 | 12/7/2016 | 12/7/2016 | P | NR |
Tony Young
|
|
|
Bill// please call 30min ahead Phone #: ###-####,, needs mechanical approval 1st
|
BLD-Other | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Tony Young
|
|
|
Sofit // Bill Phone #: ###-####,, work in progress
|
BLD-Other | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PART |
Tony Young
|
|
|
Sofit for lights // Bill Phone #: ###-####.. work in progress,, ok
|
BLD-Other | 11/17/2016 | 11/18/2016 | 11/18/2016 | P | PART |
Tony Young
|
|
|
Bill// fire soffit boxes Phone #: ###-####,, boxes ok,, pending electrical for boxes
|
BLD-Other | 11/17/2016 | 11/17/2016 | 11/17/2016 | P | PART |
Tony Young
|
|
|
Bill// fire soffit Phone #: ###-####,, need electrical 1st
|
BLD-Other | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | NR |
Tony Young
|
|
|
Bill-fire rating for soffets Phone #: ###-####
|
BLD-Wall Bracing | 11/3/2016 | 11/3/2016 | 11/3/2016 | P | PASS |
Tony Young
|
|
|
Shear // Bill Phone #: ###-####-would like as late as possible
|
BLD-Foundation | 9/14/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Jim Sly
|
|
|
Robert Phone #: ###-####
|
PubWorks Subgrade Approval | 9/15/2016 | 9/15/2016 | 9/15/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PART |
Phil Shearer
|
|
|
Late AM // Robert Phone #: ###-####. Subgrade not approved by public works
|
Issue PAID IN FULL permit | | | 9/7/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/7/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/2/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/22/2016 | 8/22/2016 | 9/2/2016 | | DONE |
Brian McGowan
|
|
|
Due 9-2 Level 2 ePlan - Fail - Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
|
Routing - PLAN CHECK | 9/2/2016 | | 9/2/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/2/2016 | | DONE |
|
|
|
all requirements met
|
1st review completed | | | 9/1/2016 | | FAIL |
Brian McGowan
|
|
|
Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
|
Routing - PLAN CHECK | 8/18/2016 | | 9/1/2016 | | FAIL |
Brian McGowan
|
|
|
fire sprinklered - 9-1 - Fail - Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
|
Plan assigned to (LEG) Tisha | 8/18/2016 | | 8/22/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 8/18/2016 | | 8/22/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to Earth Disturbance)
Permit for the construction of a new 3317 sq. ft., two story (first story 2193 sq. ft., second story 1124 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately **& sq. ft. of covered patio/porch and a 888 sq. ft. attached garage
|
Routing - PUBLIC WORKS | 8/18/2016 | | 8/19/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 8/18/2016 | | 8/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/18/2016 | | 8/19/2016 | | PASS |
David Moser
|
|
|
|
Routing - Addressing | 8/18/2016 | | 8/18/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/18/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/18/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/18/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 8/18/2016 | | 8/18/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - FIRE | 8/18/2016 | | 8/18/2016 | | PASS |
Katie Marron
|
|
|
This building is required to be fire sprinklered per subdivision fire plan. Applicant notified and acknowledged compliance.
|
Application received | | | 8/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2016 2:51PM
|