Permit Information
Permit NumberBLD16-02910
StatusFinaled
Name WR GANN COMPANY
Site Address 519 W PASO FINO DR
Project NameGann #9
Customer Number 
ePlanReviewYes
Description
WUI Zone "A", fire sprinklered is required, Class "A" roof required. Permit for the construction of a new 3317 sq. ft., two story (first story 2193 sq. ft., second story 1124 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 546 sq. ft. of covered patio/porch and a 888 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946 **BJM**

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/5/20175/8/20175/8/2017PPASS
DetailsTony Young
PLease call ahead 30min for access - Bill Phone #: ###-####
DOC - Permit Finaled5/8/20175/8/20175/8/2017PPASS
DetailsTony Young
c of o issued
BLD-Aging Inspection5/5/20175/5/20175/5/2017 PEND
DetailsTony Young
BLD-Aging Inspection5/4/20175/4/20175/5/2017 PEND
DetailsTony Young
PubWorks Occupancy Approval4/21/20174/21/20174/21/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
BLD-Energy code compliance12/19/201612/21/201612/21/2016APASS
DetailsTony Young
bill Phone #: ###-####
BLD-Framing/Rough-in12/12/201612/12/201612/12/2016PPASS
DetailsTony Young
Bill Phone #: ###-####
BLD-Framing/Rough-in12/8/201612/9/201612/9/2016AFAIL
DetailsMike Jordan
Bill Phone #: ###-####. Complete lateral bracing on C6 and C7 trusses. Roll blocl trusses in garage. Squash block under 2ply truss upstairs over window. Provide tempered glazing next to door upsstairs to balcony and downstairs to patio. Ok to insulate. Correction notice posted.
BLD-Framing/Rough-in12/7/201612/7/201612/7/2016PNR
DetailsTony Young
Bill// please call 30min ahead Phone #: ###-####,, needs mechanical approval 1st
BLD-Other11/22/201611/22/201611/22/2016PPASS
DetailsTony Young
Sofit // Bill Phone #: ###-####,, work in progress
BLD-Other11/21/201611/22/201611/22/2016APART
DetailsTony Young
Sofit for lights // Bill Phone #: ###-####.. work in progress,, ok
BLD-Other11/17/201611/18/201611/18/2016PPART
DetailsTony Young
Bill// fire soffit boxes Phone #: ###-####,, boxes ok,, pending electrical for boxes
BLD-Other11/17/201611/17/201611/17/2016PPART
DetailsTony Young
Bill// fire soffit Phone #: ###-####,, need electrical 1st
BLD-Other11/16/201611/16/201611/16/2016PNR
DetailsTony Young
Bill-fire rating for soffets Phone #: ###-####
BLD-Wall Bracing11/3/201611/3/201611/3/2016PPASS
DetailsTony Young
Shear // Bill Phone #: ###-####-would like as late as possible
BLD-Foundation9/14/20169/15/20169/15/2016APASS
DetailsJim Sly
Robert Phone #: ###-####
PubWorks Subgrade Approval9/15/20169/15/20169/15/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
BLD-Footing9/12/20169/13/20169/13/2016APART
DetailsPhil Shearer
Late AM // Robert Phone #: ###-####. Subgrade not approved by public works
Issue PAID IN FULL permit  9/7/2016 DONE
Inspection Record Card- Bld  9/7/2016 DONE
OVERRIDE  9/2/2016  
Plan assigned to (BJM)8/22/20168/22/20169/2/2016 DONE
DetailsBrian McGowan
Due 9-2 Level 2 ePlan - Fail - Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
Routing - PLAN CHECK9/2/2016 9/2/2016 PASS
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  9/2/2016 DONE
DetailsBrian McGowan
Permit Ready to Issue  9/2/2016 DONE
all requirements met
1st review completed  9/1/2016 FAIL
DetailsBrian McGowan
Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
Routing - PLAN CHECK8/18/2016 9/1/2016 FAIL
DetailsBrian McGowan
fire sprinklered - 9-1 - Fail - Top of foundation and top of footing elevations need to be noted on foundation plan. Two pier pads not noted on foundation.
Plan assigned to (LEG) Tisha8/18/2016 8/22/2016 DEFR
DetailsTisha Gallop
Routing - Erosion and Sediment8/18/2016 8/22/2016 PASS
DetailsEvan Jenkins
(Site Prep Inspection and Approval Required prior to Earth Disturbance)

Permit for the construction of a new 3317 sq. ft., two story (first story 2193 sq. ft., second story 1124 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately **& sq. ft. of covered patio/porch and a 888 sq. ft. attached garage
Routing - PUBLIC WORKS8/18/2016 8/19/2016 PASS
DetailsRachael Beierle
Routing - MECHANICAL8/18/2016 8/19/2016 PASS
DetailsTroy James
Routing - PLANNING8/18/2016 8/19/2016 PASS
DetailsDavid Moser
Routing - Addressing8/18/2016 8/18/2016 PASS
DetailsLaura Hunter
Plans ACCEPTED BY PLAN TECH  8/18/2016 DONE
Intake Approval  8/18/2016 PASS
Recd Pcfee & Taken To Pln CK  8/18/2016 DONE
Routing PW Grading-Hillside8/18/2016 8/18/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - FIRE8/18/2016 8/18/2016 PASS
DetailsKatie Marron
This building is required to be fire sprinklered per subdivision fire plan. Applicant notified and acknowledged compliance.
Application received  8/8/2016 DONE
Application submitted via PDS Online on Aug 8 2016 2:51PM